1000 resultados para Sistema fotovoltaico ligado a rede elétrica
Resumo:
The constant necessity for new sources of renewable energy is increasingly promoting the increase of investments in this area. Among other sources, the wind power has been becoming prominent. It is important to promote the search for the improvement of the technologies involved in the topologies of the wind turbines, seeking for alternatives which enhance the gotten performance, despite the irregularity of the wind speed. This study presents a new system for speed control, in this case applied to the wind turbines - the Electromagnetic Frequency Regulator (EFR). One of the most used devices in some topologies is the mechanical gearboxes which, along with a short service life, often represent sources of noise and defects. The EFR does not need these transmission boxes, representing a technological advancement, using for that an adapted induction machine, in which the stator becomes mobile, supportive to the axis of the turbine. In the topology used in this study, the EFR also allows us to leave out the usage of the eletronic converters to establish the coupling between the generator and the electrical grid. It also the reason why it provides the possibility of obtaining the generation in alternating current, with constant voltage and frequency, where there is no electrical grid. Responsable for the mechanical speed control of the generator, the EFR can be useful in other transmission systems in which the mechanical speed control output is the objective. In addition, the EFR operates through the combination of two inputs, a mechanical and other electrical. It multiplies the possibilities of application because it is able to synergistic coupling between different arrays of energy, and, for such reasons, it enables the various sources of energy involved to be uncoupled from the network, being the synchronous generator responsible for the system connection with the electrical grid, simplifying the control strategies on the power injected in it. Experimental and simulation results are presented through this study, about a wind turbine, validating the proposal related to the efficience in the speed control of the system for different wind conditions.
Resumo:
Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de energia
Resumo:
This work presents a low cost architecture for development of synchronized phasor measurement units (PMU). The device is intended to be connected in the low voltage grid, which allows the monitoring of transmission and distribution networks. Developments of this project include a complete PMU, with instrumentation module for use in low voltage network, GPS module to provide the sync signal and time stamp for the measures, processing unit with the acquisition system, phasor estimation and formatting data according to the standard and finally, communication module for data transmission. For the development and evaluation of the performance of this PMU, it was developed a set of applications in LabVIEW environment with specific features that let analyze the behavior of the measures and identify the sources of error of the PMU, as well as to apply all the tests proposed by the standard. The first application, useful for the development of instrumentation, consists of a function generator integrated with an oscilloscope, which allows the generation and acquisition of signals synchronously, in addition to the handling of samples. The second and main, is the test platform, with capabality of generating all tests provided by the synchronized phasor measurement standard IEEE C37.118.1, allowing store data or make the analysis of the measurements in real time. Finally, a third application was developed to evaluate the results of the tests and generate calibration curves to adjust the PMU. The results include all the tests proposed by synchrophasors standard and an additional test that evaluates the impact of noise. Moreover, through two prototypes connected to the electrical installation of consumers in same distribution circuit, it was obtained monitoring records that allowed the identification of loads in consumer and power quality analysis, beyond the event detection at the distribution and transmission levels.
Resumo:
Esta dissertação incide sobre o tema da coordenação entre sistemas eólicos e fotovoltaicos que participam no mercado de eletricidade. A incerteza da potência eólica e fotovoltaica é uma caraterística predominante nesta coordenação, devendo ser considerada no planeamento ótimo de sistemas eólico-fotovoltaicos. A fim de modelizar a incerteza é apresentada uma metodologia de otimização estocástica baseada em programação linear para maximizar o lucro esperado de uma empresa produtora de energia elétrica que participa no mercado diário. A coordenação entre sistemas eólicos e fotovoltaicos visa mitigar os desequilíbrios de energia, resultantes das ofertas horárias submetidas no mercado diário e, consequentemente, reduzir as penalizações financeiras. Os resultados da coordenação entre um sistema eólico e um sistema fotovoltaico são comparados com os resultados obtidos para a operação não coordenada. Estes resultados permitem concluir que a metodologia desenvolvida aplicada à coordenação apresenta um lucro esperado superior ao lucro obtido para a operação não coordenada; Abstract Stochastic Optimization Methodology for Wind-Photovoltaic Coordination This dissertation focuses on the issue of coordination between wind and photovoltaic systems participating in electricity markets. The uncertainty of wind and photovoltaic power is a main characteristic of these systems, which must be included in the optimal scheduling of the coordination of wind with photovoltaic systems. In order to model the uncertainty is presented a stochastic approach based on linear programming to maximize the profit of a wind photovoltaic power producer which participates in electricity markets. The coordination of wind with photovoltaic systems aims to mitigate the energy deviations, as a result of the participation in day-ahead market and therefore reducing economic penalties. The results obtained by the coordination are compared to results obtained by the separated operation of wind and photovoltaic systems. The results allow concluding that the proposed approach applied to the coordination presents an expected profit higher than the expected profit without coordination.
Resumo:
The rural electrification is characterized by geographical dispersion of the population, low consumption, high investment by consumers and high cost. Moreover, solar radiation constitutes an inexhaustible source of energy and in its conversion into electricity photovoltaic panels are used. In this study, equations were adjusted to field conditions presented by the manufacturer for current and power of small photovoltaic systems. The mathematical analysis was performed on the photovoltaic rural system I- 100 from ISOFOTON, with power 300 Wp, located at the Experimental Farm Lageado of FCA/UNESP. For the development of such equations, the circuitry of photovoltaic cells has been studied to apply iterative numerical methods for the determination of electrical parameters and possible errors in the appropriate equations in the literature to reality. Therefore, a simulation of a photovoltaic panel was proposed through mathematical equations that were adjusted according to the data of local radiation. The results have presented equations that provide real answers to the user and may assist in the design of these systems, once calculated that the maximum power limit ensures a supply of energy generated. This real sizing helps establishing the possible applications of solar energy to the rural producer and informing the real possibilities of generating electricity from the sun.
Resumo:
This thesis presents advances in integration of photovoltaic (PV) power and energy in practical systems, such as existing power plants in buildings or directly integrated in the public electrical grid. It starts by providing an analyze of the current state of PV power and some of its limitations. The work done in this thesis begins by providing a model to compute mutual shading in large PV plants, and after provides a study of the integration of a PV plant in a biogas power plant. The remainder sections focus on the work done for project PVCROPS, which consisted on the construction and operation of two prototypes composed of a PV system and a novel battery connected to a building and to the public electrical grid. These prototypes were then used to test energy management strategies and validate the suitability of the two advanced batteries (a lithium-ion battery and a vanadium redox ow battery) for households (BIPV) and PV plants. This thesis is divided in 7 chapters: Chapter 1 provides an introduction to explain and develop the main research questions studied for this thesis; Chapter 2 presents the development of a ray-tracing model to compute shading in large PV elds (with or without trackers); Chapter 3 shows the simulation of hybridizing a biogas plant with a PV plant, using biogas as energy storage; Chapters 4 and 5 present the construction, programming, and initial operation of both prototypes (Chapter 4), EMS testing oriented to BIPV systems (Chapter 5). Finally, Chapters 6 provides some future lines of investigation that can follow this thesis, and Chapter 7 shows a synopsis of the main conclusions of this work; Resumo: Avanços na integracão de potência fotovoltaica e producão de energia em sistemas práticos Esta tese apresenta avanços na integração de potência e energia fotovoltaica (PV) em sistemas práticos, tais como centrais existentes ou a rede eléctrica pública. Come ça por analisar o estado corrente do fotovoltaico no mundo e aborda algumas das suas limitações. O trabalho feito para esta tese de doutoramento começou pelo desenvolvimento de um modelo para calcular os sombreamentos que ocorrem em grandes campos fotovoltaicos, e depois apresenta um estudo sobre a integração um sistema fotovoltaico em uma central eléctrica a bióg as. As ultimas secções da tese focam-se no trabalho feito para o projecto PVCROPS, que consistiu na construção e operação de dois demonstratores, cada um formado por um sistema fotovoltaico e bateria conectados a um edíficio e a rede eléctrica pública. Estes protótipos foram posteriormente utilizados para testar estratégias de gestão de energia (EMS) e para validar a operação de duas baterias avançadas (bateria de Iões de Li tio e bateria de Fluxo Redox de Van adio) e a sua utiliza ção para habitações e centrais PV. A tese está dividida em 7 capitulos: O capitulo 1 apresenta uma introdução para explicar e desenvolver as principais questões que foram investigadas nesta tese; O capitulo 2 mostra o desenvolvimento de um modelo baseado em traçados de raios para calcular sombreamentos mútuos em grandes centrais PV (com e sem seguidores); O capitulo 3 mostra a simulação da hibridização de uma central electrica a biogas com uma central PV, e utilizando o biógas como armazenamento de energia. Os capitulos 4 e 5 apresentam a construção, programação e operação inicial dos dois demonstradores (Capitúlo 4), o teste de EMS orientadas para sistemas PV em habitações (Capítulo 5). Finalmente, o capítulo 6 sugere algumas futuras linhas de investigação que poderão seguir esta tese, e o Capítulo 7 faz uma sinopse das principais conclusões deste trabalho.
Resumo:
Este projecto de investigação tem como objectivo o estudo da relação entre a Cultura Urbana do Skate e a Ilustração. A partir desta premissa, é proposto um trabalho teórico-prático que reflecte sobre a aplicação da Ilustração no universo do Skate. Através da vertente teórica, procura-se fundamentar e explicar a prática, constituindo uma recolha de estudos de caso adequados aos objectivos práticos do projecto. Na vertente prática, é proposto um sistema de trabalho em rede entre os dois autores, são delineadas várias etapas de implementação repartidas entre ambos, onde cada autor desempenha o seu cargo de forma autónoma com valores e objectivos compartilhados. Posteriormente, é apresentado um relatório com os resultados práticos deste projecto que envolvem a criação de um blogue gráfico experimental, uma marca que o identifica e um evento que reúne a Cultura Urbana do Skate, a Ilustração e a Música. O presente documento é composto por dois volumes distintos. O primeiro volume destina-se à redação escrita da dissertação sobre a investigação realizada. O segundo volume destina-se à documentação de todas as etapas de implementação prática do projecto, através de um dossier de campo.
Resumo:
Mestrado em Engenharia Química
Resumo:
Relatório de Estágio para obtenção do grau de Mestre em Engenharia Civil
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia de Electrónica e Telecomunicações
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil
Resumo:
Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de Energia
Resumo:
Dissertação submetida como requisito parcial para obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores
Resumo:
A alta e crescente participação da energia eólica na matriz da produção traz grandes desafios aos operadores do sistema na gestão da rede e planeamento da produção. A incerteza associada à produção eólica condiciona os processos de escalonamento e despacho económico dos geradores térmicos, uma vez que a produção eólica efetiva pode ser muito diferente da produção prevista. O presente trabalho propõe duas metodologias de otimização do escalonamento de geradores térmicos baseadas em Programação Inteira Mista. Pretende-se encontrar soluções de escalonamento que minimizem as influências negativas da integração de energia eólica no sistema elétrico. Inicialmente o problema de escalonamento de geradores é formulado sem considerar a integração da energia eólica. Posteriormente foi considerada a penetração da energia eólica no sistema elétrico. No primeiro modelo proposto, o problema é formulado como um problema de otimização estocástico. Nesta formulação todos os cenários de produção eólica são levados em consideração no processo de otimização. No segundo modelo, o problema é formulado como um problema de otimização determinística. Nesta formulação, o escalonamento é feito para cada cenário de produção eólica e no fim determina-se a melhor solução por meio de indicadores de avaliação. Foram feitas simulações para diferentes níveis de reserva girante e os resultados obtidos mostraram que a alta participação da energia eólica na matriz da produção põe em causa a segurança e garantia de produção devido às características volátil e intermitente da produção eólica e para manter os mesmos níveis de segurança é preciso dispor no sistema de capacidade reserva girante suficiente capaz de compensar os erros de previsão.
Resumo:
Dissertação para a obtenção do grau de Mestre em Engenharia Eletrotécnica Ramo de Energia