891 resultados para Sistema de energia elétrica - Estabilidade


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The availability of the electrical energy, in sufficient quantities and in competitive prices is a crucial factor to the economic development. The trade-in of the excess electrical energy produced in a system of cogeneration can be seen as an alternative to the creation of an additional source of revenues for ethanol power plants sector, besides contributing to the complementation of the Brazilian electrical headquarter with renewable sources. The objective of this study was to evaluate the economic feasibility of the implementation of a cogeneration electrical central using the excess of sugar cane bagasse and selling the excess of electrical energy with prices of the market. An ethanol power plant located in the state of Sao Paulo was used to this study. It was used the case study methodology, evaluating the potential of the investment under the viewpoint of the Net Present Value (NPV), Payback and Internal Rate of Return (IRR), and complementing the results of the Accounting Results (AC). It was created three alternative scenarios to reflect the level of the risk of every studied situation: the most likely, an optimistic and a pessimistic, each one with its assumptions. The Monte Carlo Simulations was used to insert the elements of risk to each scenario. The results showed that the project is feasible in all NPV scenarios. And the Payback and IRR analysis confirmed these evidences. The valuation with the AR showed that the project is most risky at the pessimistic scenario, but is feasibly in the most likely and the optimistic scenarios. It was concluded that the project is economic viable. However, the economic viability shown in the results is based on the maintenance of the future prices on the levels of the historical prices used in the analysis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work presents a study on the design of a photovoltaic system connected to the grid.It discussed the main characteristics of the solar cell which is the basic component for the manufacture of solar modulethe main components of the photovoltaic system and the steps of the photovoltaic and electrical design of the system, ranging from the choice of the photovoltaic module to the dimensioning of the components of the electrical installation.In addition to the technical design, this work contains a complete comparative analysis of the current situation of photovoltaic generation distributed in Brazil and Portugal, through incentive programs to energy use as well as current legislation in both countries

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this work is to conduct a comparative study between the fuse key and the single-phase seccionalizador, which are protective equipment used in an electricity distribution networks. This study has also the purpose to reduce the number of electrical power breakdown. Distribution networks are not free from faults, disturbances and failures, then the occurrence of adversities on the network, which may be transient or permanent faults, results in the interruption of electric power. Thus, there are protective systems of distribution networks, which aims to ensure that the electric system continues to function. The incidence of transient faults in the distribution network of this electricity company was used to generate immediate shutdown of customers due to the bad use of fuses as protective equipment by the reclosers. With the use of the fuse switch in the distribution network, there was the immediate shutdown of customers, however, using the single-phase seccionalizador as protective equipment by the reclosers, there are three attempts to restart the electricity power. As the attempts to restart the electricity power are able to eliminate a transient fault, not causing shutdown of any costumer, with the implementation of single-phase sectionalizers to replace the fuses, the number of company shutdowns due to transient faults was reduced by 47.6%

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work presents a study on the design of a photovoltaic system connected to the grid.It discussed the main characteristics of the solar cell which is the basic component for the manufacture of solar modulethe main components of the photovoltaic system and the steps of the photovoltaic and electrical design of the system, ranging from the choice of the photovoltaic module to the dimensioning of the components of the electrical installation.In addition to the technical design, this work contains a complete comparative analysis of the current situation of photovoltaic generation distributed in Brazil and Portugal, through incentive programs to energy use as well as current legislation in both countries

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this work is to conduct a comparative study between the fuse key and the single-phase seccionalizador, which are protective equipment used in an electricity distribution networks. This study has also the purpose to reduce the number of electrical power breakdown. Distribution networks are not free from faults, disturbances and failures, then the occurrence of adversities on the network, which may be transient or permanent faults, results in the interruption of electric power. Thus, there are protective systems of distribution networks, which aims to ensure that the electric system continues to function. The incidence of transient faults in the distribution network of this electricity company was used to generate immediate shutdown of customers due to the bad use of fuses as protective equipment by the reclosers. With the use of the fuse switch in the distribution network, there was the immediate shutdown of customers, however, using the single-phase seccionalizador as protective equipment by the reclosers, there are three attempts to restart the electricity power. As the attempts to restart the electricity power are able to eliminate a transient fault, not causing shutdown of any costumer, with the implementation of single-phase sectionalizers to replace the fuses, the number of company shutdowns due to transient faults was reduced by 47.6%

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O problema de Planejamento da Expansão de Sistemas de Distribuição (PESD) visa determinar diretrizes para a expansão da rede considerando a crescente demanda dos consumidores. Nesse contexto, as empresas distribuidoras de energia elétrica têm o papel de propor ações no sistema de distribuição com o intuito de adequar o fornecimento da energia aos padrões exigidos pelos órgãos reguladores. Tradicionalmente considera-se apenas a minimização do custo global de investimento de planos de expansão, negligenciando-se questões de confiabilidade e robustez do sistema. Como consequência, os planos de expansão obtidos levam o sistema de distribuição a configurações que são vulneráveis a elevados cortes de carga na ocorrência de contingências na rede. Este trabalho busca a elaboração de uma metodologia para inserir questões de confiabilidade e risco ao problema PESD tradicional, com o intuito de escolher planos de expansão que maximizem a robustez da rede e, consequentemente, atenuar os danos causados pelas contingências no sistema. Formulou-se um modelo multiobjetivo do problema PESD em que se minimizam dois objetivos: o custo global (que incorpora custo de investimento, custo de manutenção, custo de operação e custo de produção de energia) e o risco de implantação de planos de expansão. Para ambos os objetivos, são formulados modelos lineares inteiros mistos que são resolvidos utilizando o solver CPLEX através do software GAMS. Para administrar a busca por soluções ótimas, optou-se por programar em linguagem C++ dois Algoritmos Evolutivos: Non-dominated Sorting Genetic Algorithm-2 (NSGA2) e Strength Pareto Evolutionary Algorithm-2 (SPEA2). Esses algoritmos mostraram-se eficazes nessa busca, o que foi constatado através de simulações do planejamento da expansão de dois sistemas testes adaptados da literatura. O conjunto de soluções encontradas nas simulações contém planos de expansão com diferentes níveis de custo global e de risco de implantação, destacando a diversidade das soluções propostas. Algumas dessas topologias são ilustradas para se evidenciar suas diferenças.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nessa pesquisa foram testadas tanto CCM com membranas e sem membranas que tinham por característica reproduzir sistemas de tratamento de esgoto sanitário. A etapa experimental desse trabalho foi dividida entre o Brasil (ensaios com CCM sem a MTP e utilizando esgoto sanitário) e Portugal (ensaios com CCM tradicionais de uma e duas câmaras, utilizando água residuária sintética e a bactéria Lactobacillus pentosus). A execução em dois locais diferentes resultou em um maior aprofundamento e desenvolvimento da pesquisa. As CCM foram avaliadas principalmente quanto ao potencial elétrico e eficiência da degradação de compostos orgânicos (esgoto sanitário e água residuária sintética). Para os dados obtidos no Brasil, as três configurações apresentaram maior diferença na potência em função do modo de operação. A operação intermitente apresentou a maior potência (11 mW/m2) para a CCM cilíndrica de fluxo ascendente, enquanto que operação continua a maior potência (4,2 mW/m2) foi obtida para a CCM retangular de fluxo horizontal, a qual também apresentava uma maior facilidade na manutenção quanto aos eletrodos (adição/remoção). A CCM cúbica de fluxo ascendente devido a sua concepção simples demandava um sistema complementar para o aumento da remoção de DQO. Apesar da baixa potência mensurada para os ensaios realizados no Brasil há de se pontuar que os mesmos foram obtidos para reatores sem membranas e utilizando o esgoto sanitário, o qual apresentou grande sazonalidade. Para a etapa realizada em Portugal, foi possível realizar quinze diferentes ensaios e mais um ensaio específico de crescimento. A maior potência (10,37 mW/m2) foi obtida para CCM de câmara dupla operada de modo contínuo para um tempo de detenção hidráulico (TDH) de 20 horas. A maior potência obtida para a CCM de câmara única foi de 5,53 mW/m2 quando houve a adição do extrato de levedura (função teórica de mediador). A potência da CCM, na maioria das vezes, esteve relacionada à proporção de sólidos voláteis e totais, SV/ST, quantidade de bactérias, pH, características de operação e por fim a configuração da CCM. O ensaio de crescimento revelou a correlação da potência em função da quantidade de bactérias inseridas da massa do biofilme (SV) e mostra-se como uma ferramenta na avaliação da potência das CCM.