Accurate owner budget estimates are critical to the initial decision-to-build process for highway construction projects. However, transportation projects have historically experienced significant construction cost overruns from the time the decision to build has been taken by the owner. This paper addresses the problem of why highway projects overrun their predicted costs. It identifies the owner risk variables that contribute to significant cost overrun and then uses factor analysis, expert elicitation, and the nominal group technique to establish groups of importance ranked owner risks. Stepwise multivariate regression analysis is also used to investigate any correlation of the percentage of cost overrun with risks, together with attributes such as highway project type, indexed cost, geographics location, and project delivery method. The research results indicate a correlation between the reciprocal of project budgets size and percentage cost overrun. This can be useful for owners in determining more realistic decision-to-build highway budget estimates by taking into account the economies of scale associated with larger projects.
Resumo:
Sustainability has been increasingly recognised as an integral part of highway infrastructure development. In practice however, the fact that financial return is still a project’s top priority for many, environmental aspects tend to be overlooked or considered as a burden, as they add to project costs. Sustainability and its implications have a far-reaching effect on each project over time. Therefore, with highway infrastructure’s long-term life span and huge capital demand, the consideration of environmental cost/ benefit issues is more crucial in life-cycle cost analysis (LCCA). To date, there is little in existing literature studies on viable estimation methods for environmental costs. This situation presents the potential for focused studies on environmental costs and issues in the context of life-cycle cost analysis. This paper discusses a research project which aims to integrate the environmental cost elements and issues into a conceptual framework for life cycle costing analysis for highway projects. Cost elements and issues concerning the environment were first identified through literature. Through questionnaires, these environmental cost elements will be validated by practitioners before their consolidation into the extension of existing and worked models of life-cycle costing analysis (LCCA). A holistic decision support framework is being developed to assist highway infrastructure stakeholders to evaluate their investment decision. This will generate financial returns while maximising environmental benefits and sustainability outcome.
Resumo:
An electrified railway system includes complex interconnections and interactions of several subsystems. Computer simulation is the only viable means for system evaluation and analysis. This paper discusses the difficulties and requirements of effective simulation models for this specialized industrial application; and the development of a general-purpose multi-train simulator.
Resumo:
This paper discusses a new paradigm of real-time simulation of power systems in which equipment can be interfaced with a real-time digital simulator. In this scheme, one part of a power system can be simulated by using a real-time simulator; while the other part is implemeneted as a physical system. The only interface of the physical system with the computer-based simulator is through data-acquisition system. The physical system is driven by a voltage-source converter (VSC)that mimics the power system simulated in the real-time simulator. In this papar, the VSC operates in a voltage-control mode to track the point of common coupling voltage signal supplied by the digital simulator. This type of splitting a network in two parts and running a real-time simulation with a physical system in parallel is called a power network in loop here. this opens up the possibility of study of interconnection o f one or several distributed generators to a complex power network. The proposed implementation is verified through simulation studies using PSCAD/EMTDC and through hardware implementation on a TMS320G2812 DSP.
Resumo:
Purpose: To provide recommendations for construction clients who design and implement financial incentive mechanisms (FIMs) on projects. ---------- Methodology: Four large Australian building projects commissioned by government clients under managing contractor contracts and completed between 2001 and 2005 were examined to explore the ‘drivers’ that promoted motivation toward financial incentive goals. The results were triangulated across data sources, projects and stakeholder types. ---------- Findings: FIM design should incorporate: 1. flexibility to modify goals and measurement procedures over time, 2. multiple goals covering different project areas, 3. distribution of rewards across all the key organizations contributing to team performance (e.g. potentially not just the contractor, but the subcontractors and consultants) and a reward amount sufficient to be valued by potential recipients. FIM benefits are maximized through the following complementary procurement initiatives: 4. equitable contract risk allocation, 5. early contractor involvement in design, 6. value-driven tender selection, 7. relationship workshops, and 8. future work opportunities.---------- Research Limitations: This paper provides practical recommendations to industry and hence does not emphasize theoretical aspects.---------- Practical Implications: The uptake of these recommendations is likely to increase the impact of FIMs on motivation and improve project and industry outcomes. Although the study focuses on government clients of building projects, all the recommendations would seem to apply equally to private-sector clients and to non-building projects.---------- Originality: In order to improve motivation and reward high performance, clients are increasingly using FIM in their construction contracts. Despite the rising use of financial incentives, there is a lack of comprehensive construction-specific knowledge available to help clients maximize outcomes. The study addresses this gap in the literature.
Resumo:
Construction industry observers tout the use of financial incentives as promoters of motivation and commitment on projects. Yet, little empirical evidence exists concerning their effectiveness. What are the drivers of motivation on construction projects? The reasons that construction project participants are motivated to pursue voluntary incentive goals are examined through four Australian case studies. The results demonstrate the critical role played by project relationships and equitable contract conditions in promoting the effectiveness of financial incentives. In the context of a construction project, this study finds financial incentives to be less important to motivation and performance than relationship enhancement initiatives. This finding is unexpected and has implications for the design of project procurement strategies. These results suggest if project clients ignore the importance of relationship quality between participants, the impact of any financial incentive will be compromised.
Resumo:
Electrostatic discharge is the sudden and brief electric current that flashes between two objects at different voltages. This is a serious issue ranging in application from solid-state electronics to spectacular and dangerous lightning strikes (arc flashes). The research herein presents work on the experimental simulation and measurement of the energy in an electrostatic discharge. The energy released in these discharges has been linked to ignitions and burning in a number of documented disasters and can be enormously hazardous in many other industrial scenarios. Simulations of electrostatic discharges were designed to specifications by IEC standards. This is typically based on the residual voltage/charge on the discharge capacitor, whereas this research examines the voltage and current in the actual spark in order to obtain a more precise comparative measurement of the energy dissipated.
Resumo:
In general, the performance of construction projects, including their sustainability performance, does not meet optimal expectations. One aspect of this is the performance of the participants who are independent and make a significance impact on overall project outcomes. Of these participants, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely, time, cost and quality. As the level of satisfaction is a subjective issue, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in an attempt to determine the performance of construction project outcomes - for instance, client satisfaction, customer satisfaction, contractor satisfaction, occupant satisfaction and home buyer satisfaction. These not only identify the performance of the construction project but are also used to improve and maintain relationships. In addition, these assessments are necessary for the continuous improvement and enhanced cooperation of participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparative standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may possibly be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This chapter examines the methods commonly practised in measuring satisfaction levels today and the advantages of promoting these methods. The results provide a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods to use in identifying the performance of project outcomes.
Resumo:
The Streaming SIMD extension (SSE) is a special feature embedded in the Intel Pentium III and IV classes of microprocessors. It enables the execution of SIMD type operations to exploit data parallelism. This article presents improving computation performance of a railway network simulator by means of SSE. Voltage and current at various points of the supply system to an electrified railway line are crucial for design, daily operation and planning. With computer simulation, their time-variations can be attained by solving a matrix equation, whose size mainly depends upon the number of trains present in the system. A large coefficient matrix, as a result of congested railway line, inevitably leads to heavier computational demand and hence jeopardizes the simulation speed. With the special architectural features of the latest processors on PC platforms, significant speed-up in computations can be achieved.
Resumo:
In many countries, the main providers for major infrastructure projects are government or public agencies. Public infrastructure projects includes economic and social infrastructure such as transportation, education and health facilities. Most decision-making models for delivery of public infrastructure projects are heavily weighted towards financial/economic factors. In Australia, public participation is an essential instrument in the procurement of infrastructure and development within Australia. This study reviews the public participation, values and interests in the procurement of infrastructure projects in Australia, and identifies the research direction in this research area in order to improve the decision-making models that capture stakeholder social, economical and environmental concerns in infrastructure projects.
Resumo:
With the advances in computer hardware and software development techniques in the past 25 years, digital computer simulation of train movement and traction systems has been widely adopted as a standard computer-aided engineering tool [1] during the design and development stages of existing and new railway systems. Simulators of different approaches and scales are used extensively to investigate various kinds of system studies. Simulation is now proven to be the cheapest means to carry out performance predication and system behaviour characterisation. When computers were first used to study railway systems, they were mainly employed to perform repetitive but time-consuming computational tasks, such as matrix manipulations for power network solution and exhaustive searches for optimal braking trajectories. With only simple high-level programming languages available at the time, full advantage of the computing hardware could not be taken. Hence, structured simulations of the whole railway system were not very common. Most applications focused on isolated parts of the railway system. It is more appropriate to regard those applications as primarily mechanised calculations rather than simulations. However, a railway system consists of a number of subsystems, such as train movement, power supply and traction drives, which inevitably contains many complexities and diversities. These subsystems interact frequently with each other while the trains are moving; and they have their special features in different railway systems. To further complicate the simulation requirements, constraints like track geometry, speed restrictions and friction have to be considered, not to mention possible non-linearities and uncertainties in the system. In order to provide a comprehensive and accurate account of system behaviour through simulation, a large amount of data has to be organised systematically to ensure easy access and efficient representation; the interactions and relationships among the subsystems should be defined explicitly. These requirements call for sophisticated and effective simulation models for each component of the system. The software development techniques available nowadays allow the evolution of such simulation models. Not only can the applicability of the simulators be largely enhanced by advanced software design, maintainability and modularity for easy understanding and further development, and portability for various hardware platforms are also encouraged. The objective of this paper is to review the development of a number of approaches to simulation models. Attention is, in particular, given to models for train movement, power supply systems and traction drives. These models have been successfully used to enable various ‘what-if’ issues to be resolved effectively in a wide range of applications, such as speed profiles, energy consumption, run times etc.
Resumo:
Office building retrofit projects are increasingly more intensified as existing buildings are aging. At the same time, building owners and occupants are looking for environmentally sustainable products. These retrofit projects usually take place in center business district (CBDs) with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors. Despite their large involvement, they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. Few research has been done on their performance of waste management operations. This paper identifies characteristics of on-site waste in office building retrofit projects. It examines the specific requirements for contractors to manage waste in the projects before exploring the existing performance of SMEs. By comparing requirements for SMEs and their potential areas for improvement, a framework is established for performance promotion of SMEs in on-site waste management of office building retrofit projects. The paper will raise the consciousness and commitment of SMEs as sub-contractors to waste management. It also explores ways of supporting SMEs for experience accumulation, performance promotion and project culture establishment towards effective and efficient on-site waste management in the growing sector of office building retrofit and upgrade.
Resumo:
The Streaming SIMD extension (SSE) is a special feature that is available in the Intel Pentium III and P4 classes of microprocessors. As its name implies, SSE enables the execution of SIMD (Single Instruction Multiple Data) operations upon 32-bit floating-point data therefore, performance of floating-point algorithms can be improved. In electrified railway system simulation, the computation involves the solving of a huge set of simultaneous linear equations, which represent the electrical characteristic of the railway network at a particular time-step and a fast solution for the equations is desirable in order to simulate the system in real-time. In this paper, we present how SSE is being applied to the railway network simulation.
Resumo:
Abstract Computer simulation is a versatile and commonly used tool for the design and evaluation of systems with different degrees of complexity. Power distribution systems and electric railway network are areas for which computer simulations are being heavily applied. A dominant factor in evaluating the performance of a software simulator is its processing time, especially in the cases of real-time simulation. Parallel processing provides a viable mean to reduce the computing time and is therefore suitable for building real-time simulators. In this paper, we present different issues related to solving the power distribution system with parallel computing based on a multiple-CPU server and we will concentrate, in particular, on the speedup performance of such an approach.
Resumo:
Purpose: The goal of this conceptual paper is to provide tools to help maximise the value delivered by infrastructure projects, by developing methods to increase adoption of innovative products during construction. Methods: The role of knowledge flows in determining innovation adoption rates is conceptually examined. A promising new approach is developed. Open innovation system theory is extended, by reviewing the role of three frameworks: (1) knowledge intermediaries, (2) absorptive capacity and (3) governance arrangements. Originality: We develop a novel open innovation system model to guide further research in the area of adoption of innovation on infrastructure projects. The open innovation system model currently lacks definition of core concepts, especially with regard to the impact of different degrees and types of openness. The three frameworks address this issue and add substance to the open innovation system model, addressing widespread criticism that it is underdeveloped. The novelty of our model is in the combination of the three frameworks to explore the system. These frameworks promise new insights into system dynamics and facilitate the development of new methods to optimise the diffusion of innovation. Practical Implications: The framework will help to reveal gaps in knowledge flows that impede the uptake of innovations. In the past, identifying these gaps has been difficult given the lack of nuance in existing theory. The knowledge maps proposed will enable informed policy advice to effectively harness the power of knowledge networks, increase innovation diffusion and improve the performance of infrastructure projects. The models developed in this paper will be used in planned empirical research into innovation on large scale infrastructure projects in the Australian built environment.