182 resultados para Shipbuilding


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Phineas Pett, beginnings of English shipbuilding.--Francis Pettit Smith, practical introducer of the screw propeller.--John Harrison, inventor of the marine chronometer.--John Lombe, introducer of the silk industry into England.--William Murdock, his life and inventions.--Frederick Koenig, inventor of the steam-printing machine.--The Walters of the 'Times', invention of the Walter press.--William Clowes, book-printing by steam.--Charles Bianconi, a lesson of self-help in Ireland.--Industry in Ireland, through Connaught and Ulster to Belfast.--Harland, E. J. Ship-building in Belfast.--Astronomers and students in humble life, a new chapter in the 'Pursuit of knowledge under difficulties'.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Each vol. has also distinctive title

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research addresses the problem of cost estimation for product development in engineer-to-order (ETO) operations. An ETO operation starts the product development process with a product specification and ends with delivery of a rather complicated, highly customized product. ETO operations are practiced in various industries such as engineering tooling, factory plants, industrial boilers, pressure vessels, shipbuilding, bridges and buildings. ETO views each product as a delivery item in an industrial project and needs to make an accurate estimation of its development cost at the bidding and/or planning stage before any design or manufacturing activity starts. ^ Many ETO practitioners rely on an ad hoc approach to cost estimation, with use of past projects as reference, adapting them to the new requirements. This process is often carried out on a case-by-case basis and in a non-procedural fashion, thus limiting its applicability to other industry domains and transferability to other estimators. In addition to being time consuming, this approach usually does not lead to an accurate cost estimate, which varies from 30% to 50%. ^ This research proposes a generic cost modeling methodology for application in ETO operations across various industry domains. Using the proposed methodology, a cost estimator will be able to develop a cost estimation model for use in a chosen ETO industry in a more expeditious, systematic and accurate manner. ^ The development of the proposed methodology was carried out by following the meta-methodology as outlined by Thomann. Deploying the methodology, cost estimation models were created in two industry domains (building construction and the steel milling equipment manufacturing). The models are then applied to real cases; the cost estimates are significantly more accurate than the actual estimates, with mean absolute error rate of 17.3%. ^ This research fills an important need of quick and accurate cost estimation across various ETO industries. It differs from existing approaches to the problem in that a methodology is developed for use to quickly customize a cost estimation model for a chosen application domain. In addition to more accurate estimation, the major contributions are in its transferability to other users and applicability to different ETO operations. ^

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Integration of the measurement activity into the production process is an essential rule in digital enterprise technology, especially for large volume product manufacturing, such as aerospace, shipbuilding, power generation and automotive industries. Measurement resource planning is a structured method of selecting and deploying necessary measurement resources to implement quality aims of product development. In this research, a new mapping approach for measurement resource planning is proposed. Firstly, quality aims are identified in the form of a number of specifications and engineering requirements of one quality characteristics (QCs) at a specific stage of product life cycle, and also measurement systems are classified according to the attribute of QCs. Secondly, a matrix mapping approach for measurement resource planning is outlined together with an optimization algorithm for combination between quality aims and measurement systems. Finally, the proposed methodology has been studied in shipbuilding to solve the problem of measurement resource planning, by which the measurement resources are deployed to satisfy all the quality aims. © Springer-Verlag Berlin Heidelberg 2010.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this research is to examine the use of a mock-up review process in interior design projects to better understand the implications of using such a process within the standard professional practice model. The research consisted of interviewing design professionals who utilize mock-ups as part of their standard of practice. These interviews were centered around two groups - those working in shipbuilding, where mock-ups have a long history, and those working in land-based projects, where mock-up use is rare. Analysis of the interviews indicated a positive relationship between mock-up use and collaboration, innovation, and problem solving. The interviews also brought to light concerns on behalf of all the professionals surveyed about the current practice model in land-based building design and construction projects within the United States. The positive relationships shown in the thesis support further research to explore how mock-ups can be best utilized in interior design.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

When designing a new passenger ship or naval vessel or modifying an existing design, how do we ensure that the proposed design is safe from an evacuation point of view? In the wake of major maritime disasters such as the Herald of Free Enterprise and the Estonia and in light of the growth in the numbers of high density, high-speed ferries and large capacity cruise ships, issues concerned with the evacuation of passengers and crew at sea are receiving renewed interest. In the maritime industry, ship evacuation models are now recognised by IMO through the publication of the Interim Guidelines for Evacuation Analysis of New and Existing Passenger Ships including Ro-Ro. This approach offers the promise to quickly and efficiently bring evacuation considerations into the design phase, while the ship is "on the drawing board" as well as reviewing and optimising the evacuation provision of the existing fleet. Other applications of this technology include the optimisation of operating procedures for civil and naval vessels such as determining the optimal location of a feature such as a casino, organising major passenger movement events such as boarding/disembarkation or restaurant/theatre changes, determining lean manning requirements, location and number of damage control parties, etc. This paper describes the development of the maritimeEXODUS evacuation model which is fully compliant with IMO requirements and briefly presents an example application to a large passenger ferry.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The "Lake Manitoba" was built by Davie Shipbuilding, Ltd. in Lauzon, P. Q. in 1968. Until 1986, she was owned by Nipigon Transport, Ltd, of Montreal. That year she was purchased by Algoma Central Marine of Sault Ste. Marie, Ontario. The following year, she was renamed the "Algomarne". In 1989, she was converted to a self unloader.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

"Lake Belnona" was built at Saginaw, Michigan in 1918 by the Saginaw Shipbuilding Company. She was owned by the U. S. Shipping Board of Washington, D. C. until 1928 when she was scrapped at River Rouge, Michigan by the Ford Motor Company

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This vessel, weighing 1711 gross ton, was built at Collingwood, Ontario in 1923 by the Collingwood Shipbuilding Company, Ltd. From that date until 1927 she was owned by the Main Transit Company, Ltd,, located in Collingwood, Ontario. In 1927 until 1960, when she scraped, she was owned by the Canada Steamship Lines, Ltd., of Montreal. During those years, she was known as the "Kinmount."

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Tese (doutorado)—Universidade de Brasília, Instituto de Ciências Sociais, Departamento de Antropologia, Programa de Pós-graduação em Antropologia Social, 2015.