844 resultados para Project 2006-036-A : Multi-Outcome Construction Policies


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The collapse of the Soviet Union at the beginning of the 1990s also meant the end of the idea of a common soviet identity incarnated in the "soviet man" and the new "historic community of the soviet people". While this idea still lives on in the generations of the 1920s to 1940s, the younger generations tend to prefer identification with family, profession, ethnic group or religion. Ms. Alexakhina set out to investigate different interethnic interaction strategies in the multi-ethnic context of the Russian Federation, with an emphasis on analysing the role of cultural and ethno-demographic characteristics of minority ethnic groups. It aimed to identify those specific patterns of interaction dynamics that have emerged in response to the political and economic transformation at present under way. The basic supposition was that the size and growth of an ethnic population are defined not only by demographic features such as fertility, mortality and net migration, but are also dependent on processes interethnic interaction and ethnic transition. The central hypothesis of the project was that the multi-ethnic and multi-cultural composition of Russia is apparently manifesting itself in the ethnic minority groups in various forms, but particularly in the form of ethnic revival and/or assimilation. The results of these complex phenomena are manifested as changes in ethnic attachments (national re-identification and language behaviour (multi-lingualism, language transition and loss of the mother tongue). The stress of the political and economic crisis has stimulated significant changes in ethnographic, social and cultural characteristics of inter-ethnic dynamics such as the rate of national re-identification, language behaviour, migration activity and the spread of mixed marriages, among both those minorities with a long history of settlement in Russia and those that were annexed during the soviet period. Patterns of language behaviour and the spread of mixed marriages were taken as the main indicators of the directions of interethnic interaction described as assimilation, ethnic revival and cultural pluralism. The first stage of the research involved a statistical analysis of census data from 1959 to 1994 in order to analyse the changing demographic composition of the largest ethnic groups of the Russian Federation. Until 1989 interethnic interaction in soviet society was distinguished by the process of russification but the political and economic transformation has stimulated the process of ethnic revival, leading to an apparent fall in the size of the Russian population due to ethnic re-identification by members of other ethnic groups who had previously identified themselves as Russian. Cross-classification of nationalities by demographic, social and cultural indicators has shown that the most important determinants of the nature of interethnic interaction are cultural factors such as religion and language affiliation. The analysis of the dynamics of language shift through the study of bilingualism and the domains of language usage for different demographic groups revealed a strong correlation between recognition of Russian as a mother tongue among some non-Russian ethnic groups and the declining size of these groups. The main conclusion from this macro-analysis of census data was the hypothesis of the growing importance of social and political factors upon ethnic succession, that ethnic identity is no longer a stable characteristic but has become dynamic in nature. In order to verify this hypothesis Ms. Alexakhina conducted a survey in four regions showing different patterns of interethnic interaction: the Karelian Republic, Buryatiya, the Nenezkii Autonomous Region and Tatarstan. These represented the west, east, north and south of the Russian Federation. Samples for the survey were prepared on the basis of census lists so as to exclude mono-Russian families in favour of mixed and ethnic-minority families. The survey confirmed the significant growth in the importance of ethnic affiliation in the everyday lives of people in the Federation following the de-centralisation of the political and economic spheres. Language was shown to be a key symbol of the consciousness of national distinction, confirmed by the fact that the process of russification has been reversed by the active mastering of the languages of titular nationalities. The results also confirmed that individual ethnic identity has ceased to be a fixed personal characteristic of one's cultural and genetic belonging, and people's social adaptation to the current political, social and economic conditions is also demonstrated in changes in individual ethnic self-identification. In general terms, the dynamic nature of national identity means that ethnic identity is at present acquiring the special features of overall social identity, for which the frequent change of priorities is an inherent feature of a person's life cycle. These are mainly linked with a multi-ethnic environment and high individual social mobility. From her results Ms. Alexakhina concludes that the development of national languages and multi-lingualism, together with the preservation of Russian as a state language, seems to be the most promising path to peaceful coexistence and the development of the national cultures of different ethnic groups within the Russian Federation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study investigates four decades of socio-economic and environmental change in a shifting cultivation landscape in the northern uplands of Laos. Historical changes in land cover and land use were analyzed using a chronological series of remote sensing data. Impacts of landscape change on local livelihoods were investigated in seven villages through interviews with various stakeholders. The study reveals that the complex mosaics of agriculture and forest patches observed in the study area have long constituted key assets for the resilience of local livelihood systems in the face of environmental and socio-economic risks. However, over the past 20 years, a process of segregating agricultural and forest spaces has increased the vulnerability of local land users. This process is a direct outcome of policies aimed at increasing national forest cover, eradicating shifting cultivation and fostering the emergence of more intensive and commercial agricultural practices. We argue that agriculture-forest segregation should be buffered in such a way that a diversity of livelihood opportunities and economic development pathways can be maintained.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With substance abuse treatment expanding in prisons and jails, understanding how behavior change interacts with a restricted setting becomes more essential. The Transtheoretical Model (TTM) has been used to understand intentional behavior change in unrestricted settings, however, evidence indicates restrictive settings can affect the measurement and structure of the TTM constructs. The present study examined data from problem drinkers at baseline and end-of-treatment from three studies: (1) Project CARE (n = 187) recruited inmates from a large county jail; (2) Project Check-In (n = 116) recruited inmates from a state prison; (3) Project MATCH, a large multi-site alcohol study had two recruitment arms, aftercare (n = 724 pre-treatment and 650 post-treatment) and outpatient (n = 912 pre-treatment and 844 post-treatment). The analyses were conducted using cross-sectional data to test for non-invariance of measures of the TTM constructs: readiness, confidence, temptation, and processes of change (Structural Equation Modeling, SEM) across restricted and unrestricted settings. Two restricted (jail and aftercare) and one unrestricted group (outpatient) entering treatment and one restricted (prison) and two unrestricted groups (aftercare and outpatient) at end-of-treatment were contrasted. In addition TTM end-of-treatment profiles were tested as predictors of 12 month drinking outcomes (Profile Analysis). Although SEM did not indicate structural differences in the overall TTM construct model across setting types, there were factor structure differences on the confidence and temptation constructs at pre-treatment and in the factor structure of the behavioral processes at the end-of-treatment. For pre-treatment temptation and confidence, differences were found in the social situations factor loadings and in the variance for the confidence and temptation latent factors. For the end-of-treatment behavioral processes, differences across the restricted and unrestricted settings were identified in the counter-conditioning and stimulus control factor loadings. The TTM end-of-treatment profiles were not predictive of drinking outcomes in the prison sample. Both pre and post-treatment differences in structure across setting types involved constructs operationalized with behaviors that are limited for those in restricted settings. These studies suggest the TTM is a viable model for explicating addictive behavior change in restricted settings but calls for modification of subscale items that refer to specific behaviors and caution in interpreting the mean differences across setting types for problem drinkers. ^

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El interés por preservar y difundir digitalmente los materiales de autores destacados de la cultura de un país es un buen motivo de reunión de investigadores humanistas y Bibliotecas universitarias. A partir del ejemplo de gestación del proyecto Archivo ARCAS de fuentes primarias de autores destacados, se muestra la riqueza de interacciones posibles en un escenario marcado por la sinergia que produce el desarrollo de proyectos conjuntos. Se exponen los antecedentes y se presentan los actores intervinientes. Se detallan las principales decisiones que la FaHCE (UNLP) / IdIHCS (UNLP-CONICET) y su Biblioteca han debido tomar teniendo en cuenta su organización, la disponibilidad de recursos humanos y la base tecnológica existente para que el proyecto pueda prosperar. Luego, a un nivel más técnico, se consignan las principales características del prototipo generado y de su primera fase de implementación. Finalmente, se concluye enunciando los desafíos a futuro que el proyecto demandará, considerando la construcción de una plataforma integrada de fuentes primarias que contemple las necesidades de grupos de investigación con perfiles heterogéneos

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Personal and career development interventions aim to help people find answers to personal and career development issues that stem from the societal context in which they live. Societal definitions of these career issues have a double consequence. On the one hand, these issues differ from one culture to another; and, on the other, they evolve along with the contexts in which they are expressed. Implementation of rigorous career development interventions requires, first, a scientific reconstruction of these societal issues and, second, a clear definition of these interventions' goals and ends. Our current view of the societal issues relating to personal and career development interventions may be phrased thus--"How can we help individuals direct their lives, in the (human) society where they interact?" It may be turned into the following scientific question: "What are the factors and processes of life-long self-construction?" An articulation of three major propositions (sociological, cognitive and dynamic) seems to be needed to answer this question. Such a theoretical frame does not allow for a definition of personal and career development interventions ends. In the world of today, the adoption by everyone of a personal ethic of responsibility towards all life on Earth (H. Jonas) could well be a fundamental end to these interventions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Personal and career development interventions aim to help people find answers to personal and career development issues that stem from the societal context in which they live. Societal definitions of these career issues have a double consequence. On the one hand, these issues differ from one culture to another; and, on the other, they evolve along with the contexts in which they are expressed. Implementation of rigorous career development interventions requires, first, a scientific reconstruction of these societal issues and, second, a clear definition of these interventions' goals and ends. Our current view of the societal issues relating to personal and career development interventions may be phrased thus--"How can we help individuals direct their lives, in the (human) society where they interact?" It may be turned into the following scientific question: "What are the factors and processes of life-long self-construction?" An articulation of three major propositions (sociological, cognitive and dynamic) seems to be needed to answer this question. Such a theoretical frame does not allow for a definition of personal and career development interventions ends. In the world of today, the adoption by everyone of a personal ethic of responsibility towards all life on Earth (H. Jonas) could well be a fundamental end to these interventions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El interés por preservar y difundir digitalmente los materiales de autores destacados de la cultura de un país es un buen motivo de reunión de investigadores humanistas y Bibliotecas universitarias. A partir del ejemplo de gestación del proyecto Archivo ARCAS de fuentes primarias de autores destacados, se muestra la riqueza de interacciones posibles en un escenario marcado por la sinergia que produce el desarrollo de proyectos conjuntos. Se exponen los antecedentes y se presentan los actores intervinientes. Se detallan las principales decisiones que la FaHCE (UNLP) / IdIHCS (UNLP-CONICET) y su Biblioteca han debido tomar teniendo en cuenta su organización, la disponibilidad de recursos humanos y la base tecnológica existente para que el proyecto pueda prosperar. Luego, a un nivel más técnico, se consignan las principales características del prototipo generado y de su primera fase de implementación. Finalmente, se concluye enunciando los desafíos a futuro que el proyecto demandará, considerando la construcción de una plataforma integrada de fuentes primarias que contemple las necesidades de grupos de investigación con perfiles heterogéneos

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Personal and career development interventions aim to help people find answers to personal and career development issues that stem from the societal context in which they live. Societal definitions of these career issues have a double consequence. On the one hand, these issues differ from one culture to another; and, on the other, they evolve along with the contexts in which they are expressed. Implementation of rigorous career development interventions requires, first, a scientific reconstruction of these societal issues and, second, a clear definition of these interventions' goals and ends. Our current view of the societal issues relating to personal and career development interventions may be phrased thus--"How can we help individuals direct their lives, in the (human) society where they interact?" It may be turned into the following scientific question: "What are the factors and processes of life-long self-construction?" An articulation of three major propositions (sociological, cognitive and dynamic) seems to be needed to answer this question. Such a theoretical frame does not allow for a definition of personal and career development interventions ends. In the world of today, the adoption by everyone of a personal ethic of responsibility towards all life on Earth (H. Jonas) could well be a fundamental end to these interventions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El interés por preservar y difundir digitalmente los materiales de autores destacados de la cultura de un país es un buen motivo de reunión de investigadores humanistas y Bibliotecas universitarias. A partir del ejemplo de gestación del proyecto Archivo ARCAS de fuentes primarias de autores destacados, se muestra la riqueza de interacciones posibles en un escenario marcado por la sinergia que produce el desarrollo de proyectos conjuntos. Se exponen los antecedentes y se presentan los actores intervinientes. Se detallan las principales decisiones que la FaHCE (UNLP) / IdIHCS (UNLP-CONICET) y su Biblioteca han debido tomar teniendo en cuenta su organización, la disponibilidad de recursos humanos y la base tecnológica existente para que el proyecto pueda prosperar. Luego, a un nivel más técnico, se consignan las principales características del prototipo generado y de su primera fase de implementación. Finalmente, se concluye enunciando los desafíos a futuro que el proyecto demandará, considerando la construcción de una plataforma integrada de fuentes primarias que contemple las necesidades de grupos de investigación con perfiles heterogéneos

Relevância:

100.00% 100.00%

Publicador:

Resumo:

La construcción es una de las actividades más valiosas para la sociedad debido a la naturaleza de los servicios que ofrece y por el volumen de empleos y movimiento económico que genera. Por ello es un elemento fundamental para el desarrollo sustentable. Es una industria compleja, cada vez más dependiente del conocimiento. Debido a su naturaleza fragmentaria y temporal y la alta rotación de personal presenta grandes retos y complicaciones particulares. Estas dificultades en oportunidades pueden transformarse en problemas por la complejidad, localización geográfica o los requisitos técnicos, financieros e innovaciones de los proyectos. Debido a sus características, las construcciones sufren cambios en las condiciones planificadas. Con frecuencia estos cambios conducen a retrasos en la ejecución de los proyectos, costes superiores a los presupuestados y conflictos entre los clientes y los ejecutores. Esto genera problemas de competitividad que afectan tanto a países desarrollados como países en vías de desarrollo. Los problemas de la construcción tienen perniciosos efectos para la sociedad, que pierde recursos que deberían permitir mejores resultados en términos de calidad de vida y beneficios sociales y económicos. Debido a la importancia del sector y los ingentes recursos que se invierten en cada proyecto se justifican los máximos esfuerzos para lograr los mejores desempeños de esta industria. Éste interés ha orientado el desarrollo de investigaciones, para apoyar el logro de los objetivos de mejoramiento continuo y construcción sustentable. Los estudios desarrollados han permitido demostrar el valor añadido del conocimiento en todos los sectores productivos. Para la construcción, los conocimientos ofrecen indicadores de desempeño, datos y lecciones aprendidas provenientes de aciertos y errores. Estos deben conducir a aprendizajes fundamentales para sustentar su competitividad. Sin embargo, a pesar de los conocimientos disponibles y los avances en las técnicas de control gerencial y de proyectos, es alarmante la recurrencia de los problemas de construcción. Esta problemática se manifiesta con severidad en los proyectos de construcción industrial que se desarrollan para el sector petrolero, petroquímico y energético venezolano. El sector presenta evidentes necesidades para un mejor desempeño competitivo por la alta incidencia de retrasos de los proyectos, que implican pérdidas de gran parte de los recursos humanos, financieros, técnicos y conocimientos invertidos. Esta investigación plantea como objetivos analizar la importancia de la construcción y su sustentabilidad, los principales problemas que afectan el sector, la gestión del conocimiento y algunos modelos disponibles para gestionarlos. Igualmente examina las lecciones aprendidas y la productividad y competitividad, con particular atención a los problemas de competitividad venezolanos. Adicionalmente se evalúan las implicaciones del conocimiento como activo estratégico y se caracterizan las empresas de construcción industrial venezolanas. Para ello se identifican las dimensiones que sustentan la gestión del conocimiento en estas empresas, para finalmente determinar las que resultan más idóneas para el nuevo modelo a ser propuesto. Con estos objetivos se desarrolló el estudio empírico. Para ello fueron invitados a participar representantes de 105 empresas y expertos de construcción distintos, todos con experiencias de construcción al sector industrial venezolano. Se obtuvieron 112 respuestas en representación de 41 organizaciones y expertos diferentes. El trabajo de campo inició en Junio de 2012 y culminó en Noviembre de 2012. Los datos obtenidos fueron analizados con apoyo de técnicas estadísticas descriptivas y multivariables. Los objetivos de la investigación se alcanzaron ya que se logró caracterizar el sector de las construcciones industriales y se propuso un nuevo modelo de gestión del conocimiento adecuado a sus características. El nuevo modelo fue formulado atendiendo a criterios de sencillez, bajos costes y facilidad de adaptación para motivar su utilización en organizaciones de construcción industrial variadas. Con ello se busca que resulte de utilidad aún para las organizaciones más pequeñas, con menores recursos o aquellas que enfrentan entornos constructivos complicados. Por último se presentan algunas sugerencias para motivar la comprensión de los fenómenos estudiados en los grupos de interés de la construcción. Se propone analizar estos problemas desde las etapas iniciales de los estudios de ingeniería, de arquitectura, de construcción, de economía y administración. Igualmente se propone desarrollar acciones conjuntas de parte de los sectores académicos, gubernamentales, industriales y asociaciones para el mejoramiento competitivo y desarrollo sustentable global. La propuesta aporta datos sobre el sector constructivo venezolano en un área que presenta grandes carencias y propone un modelo innovador por su sencillez y orientación hacia el uso diario e intuitivo de los conocimientos como recursos fundamentales para la competitividad. Esta orientación puede tener trascendencia más allá del sector descrito, para apoyar la solución de problemas de otras industrias en entornos globales. ABSTRACT Construction is one of the most valuable activities for society due to the nature of the services offered and the number of jobs and revenues generated. Therefore it is a key element for sustainable development. Construction is a complex industry increasingly dependent on knowledge. Its temporary and fragmentary nature and the high staff turnover present great challenges and particular complications to construction. In some cases these conditions may evolve to serious problems because of the complexity, geographic location or even technical, financial and innovative requirements of each project. Due to their characteristics, constructions frequently undergo changes in planned conditions. Often these changes lead to delays in project completion, costs higher than budgeted and conflicts between clients and performers. This creates problems of competitiveness affecting both developed and developing countries. The construction problems have harmful effects on society, since it loses resources that would otherwise allow better results in terms of quality of life and social and economic benefits. The importance and the enormous resources invested in each project justify the efforts to achieve the best performance of this industry. This interest has guided the development of multiple research efforts to support the achievement of construction performance improvements and sustainable construction. The studies carried out have demonstrated the added value of knowledge in all productive sectors. For construction, knowledge offers performance indicators, data and lessons learned from successes and failures. These should lead to fundamental learning to sustain sector competitiveness. However, despite the available knowledge and advances in techniques and project management control, the recurrence of construction problems is alarming. This problem shows itself severely in industrial construction projects that are developed for the Venezuelan oil, petrochemical and energy sectors. These sectors have evident needs for better competitive performance because of the high incidence of project delays, involving loss of much of the human, financial, technical and knowledge resources invested. This research analyzes the importance of construction and sustainability, the main problems affecting the sector, knowledge and some models available to manage them. It also examines the lessons learned and the productivity and competitiveness, with particular attention to the problems of Venezuelan competitiveness. Additionally, the Venezuelan industrial construction companies are characterized evaluating the implications of knowledge as an strategic asset for construction. Moreover, the research evaluates the dimensions that support knowledge management in these companies, to finally identify those that are the most suitable for the new model to be proposed. With these objectives in mind the empirical study was developed. 105 different companies and experts with Venezuelan industrial construction experiences were invited to participate on the survey. 112 responses were obtained representing 41 different organizations and experts. Fieldwork started in June 2012 and ended in November 2012. The data obtained was analyzed with descriptive and multivariate statistical techniques. The research objectives were achieved since the industrial construction sector was characterized and a new management model was proposed based on the particular characteristics of these companies. The new model was formulated according to the criteria of simplicity, low cost and ease of adaptation. This was performed to motivate the use of the new model in various industrial construction organizations, even in smaller companies, with limited resources or those facing complex construction environments. Finally some suggestions to encourage understanding of the phenomena studied among construction stakeholders were proposed. The importance of studying these problems at an early stage of the engineering, architectural, construction, economic and administration studies is highlighted. Additionally, academic, government, industrial organizations and associations are invited to join efforts to improve the competitive and sustainable global development. The proposal provides data on the Venezuelan construction sector in an area that has large gaps and proposes a model which is innovative for its simplicity and suggests the daily and intuitive use of knowledge resources as a key issue to competitiveness. This orientation may have implications beyond the described sector to support the solution of problems of other industries in a global environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper summarizes the experience and the lessons learned from the European project PERFORM (A sophisticated multi-parametric system FOR the continuous effective assessment and monitoring of motor status in Parkinson's disease and other neurodegenerative diseases). PERFORM is aimed to provide a telehealth system for the remote monitoring of Parkinson's disease patients (PD) at their homes. This paper explains the global experience with PERFORM. It summarizes the technical performance of the system and the feedback received from the patients in terms of usability and wearability.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper summarizes the experience and the lessons learned from the European project PERFORM (A sophisticated multi-parametric system FOR the continuous effective assessment and monitoring of motor status in Parkinson s disease and other neurodegenerative diseases). PERFORM is aimed to provide a telehealth system for the remote monitoring of Parkinson s disease patients (PD) at their homes. This paper explains the global experience with PERFORM. It summarizes the technical performance of the system and the feedback received from the patients in terms of usability and wearability.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nowadays, we can send audio on the Internet for multiples uses like telephony, broadcast audio or teleconferencing. The issue comes when you need to synchronize the sound from different sources because the network where we are going to work could lose packets and introduce delay in the delivery. This can also come because the sound cards could be work in different speeds. In this project, we will work with two computers emitting sound (one will simulate the left channel (mono) of a stereo signal, and the other the right channel) and connected with a third computer by a TCP network. The last computer must get the sound from both computers and reproduce it in a speaker properly (without delay). So, basically, the main goal of the project is to synchronize multi-track sound over a network. TCP networks introduce latency into data transfers. Streaming audio suffers from two problems: a delay and an offset between the channels. This project explores the causes of latency, investigates the affect of the inter-channel offset and proposes a solution to synchronize the received channels. In conclusion, a good synchronization of the sound is required in a time when several audio applications are being developed. When two devices are ready to send audio over a network, this multi-track sound will arrive at the third computer with an offset giving a negative effect to the listener. This project has dealt with this offset achieving a good synchronization of the multitrack sound getting a good effect on the listener. This was achieved thanks to the division of the project into several steps having constantly a good vision of the problem, a good scalability and having controlled the latency at all times. As we can see in the chapter 4 of the project, a lack of synchronization over c. 100μs is audible to the listener. RESUMEN. A día de hoy, podemos transmitir audio a través de Internet por varios motivos como pueden ser: una llamada telefónica, una emisión de audio o una teleconferencia. El problema viene cuando necesitas sincronizar ese sonido producido por los diferentes orígenes ya que la red a la que nos vamos a conectar puede perder los paquetes y/o introducir un retardo en las entregas de los mismos. Así mismo, estos retardos también pueden venir producidos por las diferentes velocidades a las que trabajan las tarjetas de sonido de cada dispositivo. En este proyecto, se ha trabajado con dos ordenadores emitiendo sonido de manera intermitente (uno se encargará de simular el canal izquierdo (mono) de la señal estéreo emitida, y el otro del canal derecho), estando conectados a través de una red TCP a un tercer ordenador, el cual debe recibir el sonido y reproducirlo en unos altavoces adecuadamente y sin retardo (deberá juntar los dos canales y reproducirlo como si de estéreo de tratara). Así, el objetivo principal de este proyecto es el de encontrar la manera de sincronizar el sonido producido por los dos ordenadores y escuchar el conjunto en unos altavoces finales. Las redes TCP introducen latencia en la transferencia de datos. El streaming de audio emitido a través de una red de este tipo puede sufrir dos grandes contratiempos: retardo y offset, los dos existentes en las comunicaciones entre ambos canales. Este proyecto se centra en las causas de ese retardo, investiga el efecto que provoca el offset entre ambos canales y propone una solución para sincronizar los canales en el dispositivo receptor. Para terminar, una buena sincronización del sonido es requerida en una época donde las aplicaciones de audio se están desarrollando continuamente. Cuando los dos dispositivos estén preparados para enviar audio a través de la red, la señal de sonido multi-canal llegará al tercer ordenador con un offset añadido, por lo que resultará en una mala experiencia en la escucha final. En este proyecto se ha tenido que lidiar con ese offset mencionado anteriormente y se ha conseguido una buena sincronización del sonido multi-canal obteniendo un buen efecto en la escucha final. Esto ha sido posible gracias a una división del proyecto en diversas etapas que proporcionaban la facilidad de poder solucionar los errores en cada paso dando una importante visión del problema y teniendo controlada la latencia en todo momento. Como se puede ver en el capítulo 4 del proyecto, la falta de sincronización sobre una diferencia de 100μs entre dos canales (offset) empieza a ser audible en la escucha final.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El objetivo de la presente investigación es el desarrollo de un modelo de cálculo rápido, eficiente y preciso, para la estimación de los costes finales de construcción, en las fases preliminares del proyecto arquitectónico. Se trata de una herramienta a utilizar durante el proceso de elaboración de estudios previos, anteproyecto y proyecto básico, no siendo por tanto preciso para calcular el “predimensionado de costes” disponer de la total definición grafica y literal del proyecto. Se parte de la hipótesis de que en la aplicación práctica del modelo no se producirán desviaciones superiores al 10 % sobre el coste final de la obra proyectada. Para ello se formulan en el modelo de predimensionado cinco niveles de estimación de costes, de menor a mayor definición conceptual y gráfica del proyecto arquitectónico. Los cinco niveles de cálculo son: dos que toman como referencia los valores “exógenos” de venta de las viviendas (promoción inicial y promoción básica) y tres basados en cálculos de costes “endógenos” de la obra proyectada (estudios previos, anteproyecto y proyecto básico). El primer nivel de estimación de carácter “exógeno” (nivel .1), se calcula en base a la valoración de mercado de la promoción inmobiliaria y a su porcentaje de repercusión de suelo sobre el valor de venta de las viviendas. El quinto nivel de valoración, también de carácter “exógeno” (nivel .5), se calcula a partir del contraste entre el valor externo básico de mercado, los costes de construcción y los gastos de promoción estimados de la obra proyectada. Este contraste entre la “repercusión del coste de construcción” y el valor de mercado, supone una innovación respecto a los modelos de predimensionado de costes existentes, como proceso metodológico de verificación y validación extrínseca, de la precisión y validez de las estimaciones resultantes de la aplicación práctica del modelo, que se denomina Pcr.5n (Predimensionado costes de referencia con .5niveles de cálculo según fase de definición proyectual / ideación arquitectónica). Los otros tres niveles de predimensionado de costes de construcción “endógenos”, se estiman mediante cálculos analíticos internos por unidades de obra y cálculos sintéticos por sistemas constructivos y espacios funcionales, lo que se lleva a cabo en las etapas iniciales del proyecto correspondientes a estudios previos (nivel .2), anteproyecto (nivel .3) y proyecto básico (nivel .4). Estos cálculos teóricos internos son finalmente evaluados y validados mediante la aplicación práctica del modelo en obras de edificación residencial, de las que se conocen sus costes reales de liquidación final de obra. Según va evolucionando y se incrementa el nivel de definición y desarrollo del proyecto, desde los estudios previos hasta el proyecto básico, el cálculo se va perfeccionando en su nivel de eficiencia y precisión de la estimación, según la metodología aplicada: [aproximaciones sucesivas en intervalos finitos], siendo la hipótesis básica como anteriormente se ha avanzado, lograr una desviación máxima de una décima parte en el cálculo estimativo del predimensionado del coste real de obra. El cálculo del coste de ejecución material de la obra, se desarrolla en base a parámetros cúbicos funcionales “tridimensionales” del espacio proyectado y parámetros métricos constructivos “bidimensionales” de la envolvente exterior de cubierta/fachada y de la huella del edificio sobre el terreno. Los costes funcionales y constructivos se ponderan en cada fase del proceso de cálculo con sus parámetros “temáticos/específicos” de gestión (Pg), proyecto (Pp) y ejecución (Pe) de la concreta obra presupuestada, para finalmente estimar el coste de construcción por contrata, como resultado de incrementar al coste de ejecución material el porcentaje correspondiente al parámetro temático/especifico de la obra proyectada. El modelo de predimensionado de costes de construcción Pcr.5n, será una herramienta de gran interés y utilidad en el ámbito profesional, para la estimación del coste correspondiente al Proyecto Básico previsto en el marco técnico y legal de aplicación. Según el Anejo I del Código Técnico de la Edificación (CTE), es de obligado cumplimiento que el proyecto básico contenga una “Valoración aproximada de la ejecución material de la obra proyectada por capítulos”, es decir , que el Proyecto Básico ha de contener al menos un “presupuesto aproximado”, por capítulos, oficios ó tecnologías. El referido cálculo aproximado del presupuesto en el Proyecto Básico, necesariamente se ha de realizar mediante la técnica del predimensionado de costes, dado que en esta fase del proyecto arquitectónico aún no se dispone de cálculos de estructura, planos de acondicionamiento e instalaciones, ni de la resolución constructiva de la envolvente, por cuanto no se han desarrollado las especificaciones propias del posterior proyecto de ejecución. Esta estimación aproximada del coste de la obra, es sencilla de calcular mediante la aplicación práctica del modelo desarrollado, y ello tanto para estudiantes como para profesionales del sector de la construcción. Como se contiene y justifica en el presente trabajo, la aplicación práctica del modelo para el cálculo de costes en las fases preliminares del proyecto, es rápida y certera, siendo de sencilla aplicación tanto en vivienda unifamiliar (aisladas y pareadas), como en viviendas colectivas (bloques y manzanas). También, el modelo es de aplicación en el ámbito de la valoración inmobiliaria, tasaciones, análisis de viabilidad económica de promociones inmobiliarias, estimación de costes de obras terminadas y en general, cuando no se dispone del proyecto de ejecución y sea preciso calcular los costes de construcción de las obras proyectadas. Además, el modelo puede ser de aplicación para el chequeo de presupuestos calculados por el método analítico tradicional (estado de mediciones pormenorizadas por sus precios unitarios y costes descompuestos), tanto en obras de iniciativa privada como en obras promovidas por las Administraciones Públicas. Por último, como líneas abiertas a futuras investigaciones, el modelo de “predimensionado costes de referencia 5 niveles de cálculo”, se podría adaptar y aplicar para otros usos y tipologías diferentes a la residencial, como edificios de equipamientos y dotaciones públicas, valoración de edificios históricos, obras de urbanización interior y exterior de parcela, proyectos de parques y jardines, etc….. Estas lineas de investigación suponen trabajos paralelos al aquí desarrollado, y que a modo de avance parcial se recogen en las comunicaciones presentadas en los Congresos internacionales Scieconf/Junio 2013, Rics‐Cobra/Septiembre 2013 y en el IV Congreso nacional de patología en la edificación‐Ucam/Abril 2014. ABSTRACT The aim of this research is to develop a fast, efficient and accurate calculation model to estimate the final costs of construction, during the preliminary stages of the architectural project. It is a tool to be used during the preliminary study process, drafting and basic project. It is not therefore necessary to have the exact, graphic definition of the project in order to be able to calculate the cost‐scaling. It is assumed that no deviation 10% higher than the final cost of the projected work will occur during the implementation. To that purpose five levels of cost estimation are formulated in the scaling model, from a lower to a higher conceptual and graphic definition of the architectural project. The five calculation levels are: two that take as point of reference the ”exogenous” values of house sales (initial development and basic development), and three based on calculation of endogenous costs (preliminary study, drafting and basic project). The first ”exogenous” estimation level (level.1) is calculated over the market valuation of real estate development and the proportion the cost of land has over the value of the houses. The fifth level of valuation, also an ”exogenous” one (level.5) is calculated from the contrast between the basic external market value, the construction costs, and the estimated development costs of the projected work. This contrast between the ”repercussions of construction costs” and the market value is an innovation regarding the existing cost‐scaling models, as a methodological process of extrinsic verification and validation, of the accuracy and validity of the estimations obtained from the implementation of the model, which is called Pcr.5n (reference cost‐scaling with .5calculation levels according to the stage of project definition/ architectural conceptualization) The other three levels of “endogenous” construction cost‐scaling are estimated from internal analytical calculations by project units and synthetic calculations by construction systems and functional spaces. This is performed during the initial stages of the project corresponding to preliminary study process (level.2), drafting (level.3) and basic project (level.4). These theoretical internal calculations are finally evaluated and validated via implementation of the model in residential buildings, whose real costs on final payment of the works are known. As the level of definition and development of the project evolves, from preliminary study to basic project, the calculation improves in its level of efficiency and estimation accuracy, following the applied methodology: [successive approximations at finite intervals]. The basic hypothesis as above has been made, achieving a maximum deviation of one tenth, in the estimated calculation of the true cost of predimensioning work. The cost calculation for material execution of the works is developed from functional “three‐dimensional” cubic parameters for the planned space and constructive “two dimensional” metric parameters for the surface that envelopes around the facade and the building’s footprint on the plot. The functional and building costs are analyzed at every stage of the process of calculation with “thematic/specific” parameters of management (Pg), project (Pp) and execution (Pe) of the estimated work in question, and finally the cost of contractual construction is estimated, as a consequence of increasing the cost of material execution with the percentage pertaining to the thematic/specific parameter of the projected work. The construction cost‐scaling Pcr.5n model will be a useful tool of great interest in the professional field to estimate the cost of the Basic Project as prescribed in the technical and legal framework of application. According to the appendix of the Technical Building Code (CTE), it is compulsory that the basic project contains an “approximate valuation of the material execution of the work, projected by chapters”, that is, that the basic project must contain at least an “approximate estimate” by chapter, trade or technology. This approximate estimate in the Basic Project is to be performed through the cost‐scaling technique, given that structural calculations, reconditioning plans and definitive contruction details of the envelope are still not available at this stage of the architectural project, insofar as specifications pertaining to the later project have not yet been developed. This approximate estimate of the cost of the works is easy to calculate through the implementation of the given model, both for students and professionals of the building sector. As explained and justified in this work, the implementation of the model for cost‐scaling during the preliminary stage is fast and accurate, as well as easy to apply both in single‐family houses (detached and semi‐detached) and collective housing (blocks). The model can also be applied in the field of the real‐estate valuation, official appraisal, analysis of the economic viability of real estate developments, estimate of the cost of finished projects and, generally, when an implementation project is not available and it is necessary to calculate the building costs of the projected works. The model can also be applied to check estimates calculated by the traditional analytical method (state of measurements broken down into price per unit cost details), both in private works and those promoted by Public Authorities. Finally, as potential lines for future research, the “five levels of calculation cost‐scaling model”, could be adapted and applied to purposes and typologies other than the residential one, such as service buildings and public facilities, valuation of historical buildings, interior and exterior development works, park and garden planning, etc… These lines of investigation are parallel to this one and, by way of a preview, can be found in the dissertations given in the International Congresses Scieconf/June 2013, Rics‐Cobra/September 2013 and in the IV Congress on building pathology ‐Ucam/April 2014.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

La heterogeneidad del medio geológico introduce en el proyecto de obra subterránea un alto grado de incertidumbre que debe ser debidamente gestionado a fin de reducir los riesgos asociados, que son fundamentalmente de tipo geotécnico. Entre los principales problemas a los que se enfrenta la Mecánica de Rocas moderna en el ámbito de la construcción subterránea, se encuentran la fluencia de roca en túneles (squeezing) y la rotura de pilares de carbón. Es ampliamente conocido que su aparición causa importantes perjuicios en el coste y la seguridad de los proyectos por lo que su estudio, ha estado tradicionalmente vinculado a la predicción de su ocurrencia. Entre las soluciones existentes para la determinación de estos problemas se encuentran las que se basan en métodos analíticos y numéricos. Estas metodologías son capaces de proporcionar un alto nivel de representatividad respecto del comportamiento geotécnico real, sin embargo, su utilización solo es posible cuando se dispone de una suficiente caracterización geotécnica y por tanto de una detallada definición de los parámetros que alimentan los complejos modelos constitutivos y criterios de rotura que los fenómenos estudiados requieren. Como es lógico, este nivel de definición solo es posible cuando se alcanzan etapas avanzadas de proyecto, incluso durante la propia construcción, a fin de calibrar adecuadamente los parámetros introducidos en los modelos, lo que supone una limitación de uso en etapas iniciales, cuando su predicción tiene verdadero sentido. Por su parte, los métodos empíricos permiten proporcionar soluciones a estos complejos problemas de un modo sencillo, con una baja parametrización y, dado su eminente enfoque observacional, de gran fiabilidad cuando se implementan sobre condiciones de contorno similares a las originales. La sencillez y escasez de los parámetros utilizados permiten a estas metodologías ser utilizadas desde las fases preliminares del proyecto, ya que estos constituyen en general, información habitual de fácil y económica adquisición. Este aspecto permite por tanto incorporar la predicción desde el principio del proceso de diseño, anticipando el riesgo en origen. En esta tesis doctoral, se presenta una nueva metodología empírica que sirve para proporcionar predicciones para la ocurrencia de squeezing y el fallo de pilares de carbón basada en una extensa recopilación de información de casos reales de túneles y minas en las que ambos fenómenos fueron evaluados. Esta información, recogida de referencias bibliográficas de prestigio, ha permitido recopilar una de las más extensas bases de datos existentes hasta la fecha relativa a estos fenómenos, lo que supone en sí mismo una importante contribución sobre el estado del arte. Con toda esta información, y con la ayuda de la teoría de clasificadores estadísticos, se ha implementado sobre las bases de datos un clasificador lineal de tipo regresión logística que permite hacer predicciones sobre la ocurrencia de ambos fenómenos en términos de probabilidad, y por tanto ponderar la incertidumbre asociada a la heterogeneidad incorporada por el medio geológico. Este aspecto del desarrollo es el verdadero valor añadido proporcionado por la tesis y la principal ventaja de la solución propuesta respecto de otras metodologías empíricas. Esta capacidad de ponderación probabilística permite al clasificador constituir una solución muy interesante como metodología para la evaluación de riesgo geotécnico y la toma de decisiones. De hecho, y como ejercicio de validación práctica, se ha implementado la solución desarrollada en un modelo coste-beneficio asociado a la optimización del diseño de pilares involucrados en una de mina “virtual” explotada por tajos largos. La capacidad del clasificador para cuantificar la probabilidad de fallo del diseño, junto con una adecuada cuantificación de las consecuencias de ese fallo, ha permitido definir una ley de riesgo que se ha incorporado al balance de costes y beneficios, que es capaz, a partir del redimensionamiento iterativo del sistema de pilares y de la propia configuración de la mina, maximizar el resultado económico del proyecto minero bajo unas condiciones de seguridad aceptables, fijadas de antemano. Geological media variability introduces to the subterranean project a high grade of uncertainty that should be properly managed with the aim to reduce the associated risks, which are mainly geotechnical. Among the major problems facing the modern Rock Mechanics in the field of underground construction are both, the rock squeezing while tunneling and the failure of coal pillars. Given their harmfulness to the cost and safety of the projects, their study has been traditionally linked to the determination of its occurrence. Among the existing solutions for the determination of these problems are those that are based on analytical and numerical methods. Those methodologies allow providing a high level of reliability of the geotechnical behavior, and therefore a detailed definition of the parameters that feed the complex constitutive models and failure criteria that require the studied phenomena. Obviously, this level of definition is only possible when advanced stages of the project are achieved and even during construction in order to properly calibrate the parameters entered in the models, which suppose a limited use in early stages, when the prediction has true sense. Meanwhile, empirical methods provide solutions to these complex problems in a simple way, with low parameterization and, given his observational scope, with highly reliability when implemented on similar conditions to the original context. The simplicity and scarcity of the parameters used allow these methodologies be applied in the early stages of the project, since that information should be commonly easy and cheaply to get. This aspect can therefore incorporate the prediction from the beginning of the design process, anticipating the risk beforehand. This thesis, based on the extensive data collection of case histories of tunnels and underground mines, presents a novel empirical approach used to provide predictions for the occurrence of both, squeezing and coal pillars failures. The information has been collected from prestigious references, providing one of the largest databases to date concerning phenomena, a fact which provides an important contribution to the state of the art. With all this information, and with the aid of the theory of statistical classifiers, it has been implemented on both databases, a type linear logistic regression classifier that allows predictions about the occurrence of these phenomena in terms of probability, and therefore weighting the uncertainty associated with geological variability. This aspect of the development is the real added value provided by the thesis and the main advantage of the proposed solution over other empirical methodologies. This probabilistic weighting capacity, allows being the classifier a very interesting methodology for the evaluation of geotechnical risk and decision making. In fact, in order to provide a practical validation, we have implemented the developed solution within a cost-benefit analysis associated with the optimization of the design of coal pillar systems involved in a "virtual" longwall mine. The ability of the classifier to quantify the probability of failure of the design along with proper quantification of the consequences of that failure, has allowed defining a risk law which is introduced into the cost-benefits model, which is able, from iterative resizing of the pillar system and the configuration of the mine, maximize the economic performance of the mining project under acceptable safety conditions established beforehand.