935 resultados para Priority queue
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Optical networks provide a new dimension to meet the demands of exponentially growing traffic. Optical packet switching requires a good switch architecture, which eliminates the O/E/O conversion as much as possible. Wavelength Division Multiplexing (WDM) provides a breakthrough to exploit the huge bandwidth of the optical fiber. Different applications have different requirements, which necessitate employing differentiated services. This paper presents the idea of a priority-based λ-scheduler, where the packets are differentiated into different classes and services are provided accordingly. For example, class 0 can correspond to non real time applications like email and ftp, while class 1 can correspond to real-time audio and video communications. The architecture is based on that of the λ-scheduler and hence it has the added advantage of reduced component cost by using WDM internally.
Resumo:
Current studies indicate a need to integrate environmental management with manufacturing strategy, including topics like cross-functional integration, environmental impact, and waste reduction. Nevertheless, such studies are relatively rare, existing still a need for research in specific regional contexts. At the same time, the results found are not unanimous. Due to these gaps, the objective of this article is to analyze if environmental management can be considered a new competitive priority for manufacturing enterprises located in Brazil. A cross-sectional survey was conducted with Brazilian companies certified by ISO 14001. Sixty-five valid questionnaires were analyzed through Structural Equation Modelling (SEM). The first conclusion is that environmental management presents a preventive approach in the sample analyzed, focused on eco-efficiency, what potentially do not to create a competitive advantage. This preventive approach inhibits environmental management from being regarded as a new competitive manufacturing priority, in the full sense as defined by the literature. Another important result is that environmental management, although following a preventive focus, may influence positively the four manufacturing priorities: cost, quality, flexibility and delivery. (C) 2011 Elsevier Ltd. All rights reserved.
Resumo:
[EN] The presence of emerging contaminants has been previously described in reclaimed water and groundwater of Gran Canaria (Spain). Despite of the environmental risk associated to irrigation with reclaimed water (R), this practice is necessary considering sustainability of the hydrological cycle in semiarid zones, especially regarding agricultural activity. The aim of this study was: i) to analyse the evolution during two years of contaminants of emerging concern, priority substances (2008/105/EC) and heavy metals in reclaimed water (R) and in a volcanic aquifer in the NE of Gran Canaria where a golf course has been irrigated with R since 1976 and ii) to relate this presence with physicochemical water properties and hydrogeological media. Reclaimed water and groundwater (GW) were monitoring quarterly from July 2009 to September 2011. Sorption and degradation processes in soil account for more compounds being detected in R. Diazinon and chlorfenvinphos were detected always in R and terbuthylazine, terbutryn and diuron at 90% of frequency. Considering all the samples, the most frequent compounds were chlorpyrifos ethyl, fluorene, phenanthrene and pyrene. Although their concentrations were frequently below 50 ngL-1, some contaminants, were occasionally detected at higher concentrations. Chlorpyrifos ethyl and diuron are priority substances detected frequently and at high concentrations so they must be included in monitoring studies. Geology and location seem to be related to the emerging compounds presence due to occasional contamination events (not related to R irrigation) and therefore not to an existence of a dangerous diffuse contamination level. Thus, it is preferable to select wells with less stable chemical water quality, in order to monitor the risk of emerging compounds presence. Considering the relationship between contaminant presence, chemical water quality, seasonal variation, hydrogeological characteristics and wells location we can conclude that chlorpyrifos ethyl and diuron were the most dangerous priority substances in terms of GW quality so they must be included in all of the monitoring studies, at least in Canary Islands.
Resumo:
OBJECTIVES: To compare the clinical outcomes of standard, cylindrical, screw-shaped to novel tapered, transmucosal (Straumann Dental implants immediately placed into extraction sockets. Material and methods: In this randomized-controlled clinical trial, outcomes were evaluated over a 3-year observation period. This report deals with the need for bone augmentation, healing events, implant stability and patient-centred outcomes up to 3 months only. Nine centres contributed a total of 208 immediate implant placements. All surgical and post-surgical procedures and the evaluation parameters were discussed with representatives of all centres during a calibration meeting. Following careful luxation of the designated tooth, allocation of the devices was randomly performed by a central study registrar. The allocated SLA titanium implant was installed at the bottom or in the palatal wall of the extraction socket until primary stability was reached. If the extraction socket was >or=1 mm larger than the implant, guided bone regeneration was performed simultaneously (Bio Oss and BioGide. The flaps were then sutured. During non-submerged transmucosal healing, everything was done to prevent infection. At surgery, the need for augmentation and the degree of wound closure was verified. Implant stability was assessed clinically and by means of resonance frequency analysis (RFA) at surgery and after 3 months. Wound healing was evaluated after 1, 2, 6 and 12 weeks post-operatively. RESULTS: The demographic data did not show any differences between the patients receiving either standard cylindrical or tapered implants. All implants yielded uneventful healing with 15% wound dehiscences after 1 week. After 2 weeks, 93%, after 6 weeks 96%, and after 12 weeks 100% of the flaps were closed. Ninety percent of both implant designs required bone augmentation. Immediately after implantation, RFA values were 55.8 and 56.7 and at 3 months 59.4 and 61.1 for cylindrical and tapered implants, respectively. Patient-centred outcomes did not differ between the two implant designs. However, a clear preference of the surgeon's perception for the appropriateness of the novel-tapered implant was evident. CONCLUSIONS: This RCT has demonstrated that tapered or standard cylindrical implants yielded clinically equivalent short-term outcomes after immediate implant placement into the extraction socket.
Resumo:
Report presented to the Intergovernmental Committee of the Convention on the Protection and Promotion of the Diversity of Cultural Expressions Seventh Ordinary Session, Paris, December 10-‐13, 2013