996 resultados para Maintenance Decision


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we discuss interesting developments of expert systems for machine diagnosis and condition-based maintenance. We review some elements of condition-based maintenance and its applications, expert systems for machine diagnosis, and an example of machine diagnosis. In the last section we note some problems to be resolved so that expert systems for machine diagnosis may gain wider acceptance in the future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study aims to identify and prioritize the stakeholders involved in making decisions in a sports organization. A multiple linear regression analysis was used to assess the influence of the attributes of power, legitimacy and urgency on the salience of the various stakeholders. The results showed a convergence of external and internal decision makers' perceptions, concerning the three main stakeholder groups: top management, sponsors and member association. Pearson correlations identified four types of stakeholder: definitive, dangerous, demanding and non-stakeholders. A generalized differentiation was also found in stakeholder classification, regarding evaluation of attributes, between external and internal decision makers. In addition, the study suggests the success of organizations' management will depend on correct identification of stakeholders and consequent assessment of their relevance, in order to highlight who should get priority, and how, in strategic decision making.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study aims to be a contribution to a theoretical model that explains the effectiveness of the learning and decision-making processes by means of a feedback and mental models perspective. With appropriate mental models, managers should be able to improve their capacity to deal with dynamically complex contexts, in order to achieve long-term success. We present a set of hypotheses about the influence of feedback information and systems thinking facilitation on mental models and management performance. We explore, under controlled conditions, the role of mental models in terms of structure and behaviour. A test based on a simulation experiment with a system dynamics model was performed. Three out of the four hypotheses were confirmed. Causal diagramming positively influences mental model structure similarity, mental model structure similarity positively influences mental model behaviour similarity, and mental model behaviour similarity positively influences the quality of the decision.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study aims to be a contribution to a theoretical model that explains the effectiveness of the learning and decision-making processes by means of a feedback and mental models perspective. With appropriate mental models, managers should be able to improve their capacity to deal with dynamically complex contexts, in order to achieve long-term success. We present a set of hypotheses about the influence of feedback information and systems thinking facilitation on mental models and management performance. We explore, under controlled conditions, the role of mental models in terms of structure and behaviour. A test based on a simulation experiment with a system dynamics model was performed. Three out of the four hypotheses were confirmed. Causal diagramming positively influences mental model structure similarity, mental model structure similarity positively influences mental model behaviour similarity, and mental model behaviour similarity positively influences the quality of the decision

Relevância:

20.00% 20.00%

Publicador:

Resumo:

No âmbito do Ciclo de Estudos conducente ao grau de Mestre em Engenharia Mecânica, Per-fil de Manutenção e Produção, foi desenvolvida esta Dissertação, que consiste no estudo do estado actual de implementação da “Total Productive Maintenance – TPM” na Área de Pren-sas da Volkswagen Autoeuropa, identificando os benefícios colhidos com a referida imple-mentação, e também algumas dificuldades. No final desta Dissertação, são enunciadas as considerações resultantes do presente estudo e são emitidas algumas sugestões, no sentido de que este trabalho se torne uma mais-valia para a Área de Prensas da Volkswagen Autoeuropa, contribuindo positivamente na busca da melhoria contínua, dos zero defeitos e das zero falhas e dos zero desperdícios e, finalmente propor um plano de melhoria, ou seja, uma adaptação do actual modelo funcional face ao modelo teórico.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Este relatório, escrito no âmbito do estágio profissional realizado no departamento de Manutenção e Engenharia da TAP Portugal, com o tema “Análise do Line Maintenance Manual numa perspectiva de melhoria contínua do Programa de Manutenção Avião”, tem como objectivo descrever a análise efectuada e as oportunidades de melhoria identificadas no Line Maintenance Manual, documento que serve de suporte às actividades da Manutenção de Linha. Espera-se que o trabalho realizado traga benefícios para a TAP Manutenção e Engenharia a médio e longo prazo, tais como a agilização das futuras revisões ao referido documento, a redução de recursos envolvidos nas inspecções de trânsito e, quiçá, a correcção de aspectos com implicações directas na operação segura das aeronaves. O trabalho desenvolvido no estágio implicou um estudo aprofundado do processo que resulta no estabelecimento dos programas de manutenção das aeronaves actuais, bem como dos documentos nele envolvidos, pelo que a análise específica do Line Maintenance Manual foi realizada no contexto muito mais abrangente da teoria da Manutenção Aeronáutica.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A utilização de recursos energéticos renováveis apresenta-se como um caminho vital para a humanidade alcançar um desenvolvimento sustentável. Nesta campanha, a energia eólica surge como um dos principais vectores de orientação tendo evoluído de forma quase exponencial nos últimos anos. No entanto, apesar da sua relativa maturidade, esta tecnologia enfrenta ainda alguns problemas e desafios. Não obstante a experiência empírica da indústria eólica, adquirida nos últimos trinta anos e dos esforços para melhorar a fiabilidade operacional das turbinas, as taxas de falha ainda se apresentam elevadas. Face às correntes práticas de Manutenção das turbinas e parques eólicos e às características de falha, (por vezes catastróficas), existe a necessidade de optimizar as estratégias de manutenção das turbinas eólicas e reduzir os custos durante o ciclo de vida, de modo a maximizar o retorno do investimento. Descreve-se neste trabalho o estado do conhecimento actual face ao objectivo pretendido, a recolha de dados reais da operação e Manutenção, a aplicabilidade dos modelos escolhidos para obtenção da probabilidade de falha, e as consequências e avaliação do risco. Assim, desenvolveu-se uma ferramenta de apoio à decisão, baseada em Modelos de RBI (Risk Based Inspection) e RBIM (Risk Based Inspection and Maintenance) aplicados a turbinas eólicas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Nowadays, the Portuguese insurance industry operates in a market with a much more aggressive structure than a few decades ago. Markets and the economy have become globalised since the last decade of the 20th century. Market forces have gradually shifted – power is now mainly on the demand side. In order to meet the new requirements, the insurance industry must develop a strong strategic ability to respond to constant changes of the new international economic order.One of the basic aspects of this strategic development will focus on the ability to predict the future. We introduce the subject by briefly describing the sector, its organisational structure in the Portuguese market, and challenges arising from the development of the European Union. We then analyse the economic and financial structure of the sector. From this point of view, we aim at the possibility of designing models that could explain the demand for insurance, claims and technical reserves evolution. Such models, (even if based on the past), would resolve, at least partly, one of the greatest difficulties experienced by insurance companies when estimating the budget. Thus, we examine the existence of variables that explain the previous points, which are capable of forming a basis for designing models that are simple but efficient, and can be used for strategic planning.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, a mixed-integer nonlinear approach is proposed to support decision-making for a hydro power producer, considering a head-dependent hydro chain. The aim is to maximize the profit of the hydro power producer from selling energy into the electric market. As a new contribution to earlier studies, a risk aversion criterion is taken into account, as well as head-dependency. The volatility of the expected profit is limited through the conditional value-at-risk (CVaR). The proposed approach has been applied successfully to solve a case study based on one of the main Portuguese cascaded hydro systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A razão atribuída à escolha do tema do T.F.M. em Caminhos-de-ferro, tem a ver com o facto de ser uma via de comunicação específica. Contrariamente ao que acontece na execução de auto-estradas, no caminho-de-ferro, a gestora da infra-estrutura responsabiliza-se pela execução, exploração (sinalização e controlo de circulação), abastecimento de energia fornecida às vias que dispõem de catenária (tracção eléctrica), manutenção e conservação da via. O processo de análise e inspecção de geometria de via, é usado quando e necessário preservar a infra-estrutura. Este processo iniciou-se nos caminhos-de-ferro portugueses, há muitos anos, depois da inauguração do primeiro troco de linha férrea. A primeira viagem ocorre em Outubro de 1856, sendo o início do processo em 1968, com a dresina “Matisa PV-6”. Em 1991 a C.P. adquiriu outro veículo de inspecção de via, tendo sido escolhido o VIV02 EM 120 da marca Plasser & Theurer, para substituir “Matisa PV-6”. O tema Análise dos Métodos de Medição dos Parâmetros Geométricos de Via e Correlação entre os Dados Obtidos está directamente relacionado com a manutenção e conservação de via. Na Unidade Operacional Sul (hoje ROS – Região Operacional Sul), local onde desenvolvi o T.F.M., não existem obras de construção de caminhos-de-ferro que pudesse acompanhar e constituir tema para o meu trabalho. Na realidade, com a falta de investimento que se perspectiva no futuro próximo, a manutenção da infra-estrutura passa a ser a actividade principal desenvolvida pela REFER, de modo a assegurar a comodidade, segurança e rapidez na deslocação de cargas e pessoas. A Analise Geométrica de Via e actualmente uma das principais actividades no âmbito da manutenção, que é feita por diagnóstico, contrariamente ao que acontecia no passado em que a conservação metódica era realizada num determinado ano num troço seleccionado independentemente da necessidade ou não da mesma. Uma ajuda preciosa, no que se refere à decisão de se realizar um determinado trabalho de conservação, e a do veículo VIV02 EM 120 que faz inspeções ao longo de toda a rede ferroviária e permite recolher dados e classificar através do desvio padrão, troços com extensão de 200 metros, obtendo os dados relevantes sobre a necessidade de intervenção. Para além do referido veículo existem também equipamentos ligeiros de inspecção dos parâmetros geométricos de via. Um desses equipamentos designa-se por Trólei, não sendo motorizado, pois o mesmo é movido manualmente por um operador. Obviamente que este equipamento não faz a inspecção a toda a rede pois a operação de medição é morosa, sendo contudo utilizado para análise de defeitos geométricos em pequenos trocos, tornando-se assim uma mais-valia, evitando o deslocar de um equipamento “pesado” como o VIV 02 EM 120. Para atingir os objectivos deste trabalho realizaram-se testes de medição com ambos (veiculo e equipamento ligeiro), no mesmo espaço temporal e com as mesmas características físicas, como a temperatura, humidade etc. Os resultados, de acordo com os objectivos, são a comparação entre as medições de ambos, com vista a comprovar a sua utilidade e necessidade, de acordo com os vários tipos de superstruturas constituintes da rede ferroviária nacional.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the aftermath of a large-scale disaster, agents' decisions derive from self-interested (e.g. survival), common-good (e.g. victims' rescue) and teamwork (e.g. fire extinction) motivations. However, current decision-theoretic models are either purely individual or purely collective and find it difficult to deal with motivational attitudes; on the other hand, mental-state based models find it difficult to deal with uncertainty. We propose a hybrid, CvI-JI, approach that combines: i) collective 'versus' individual (CvI) decisions, founded on the Markov decision process (MDP) quantitative evaluation of joint-actions, and ii)joint-intentions (JI) formulation of teamwork, founded on the belief-desire-intention (BDI) architecture of general mental-state based reasoning. The CvI-JI evaluation explores the performance's improvement

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Electricity markets are complex environments, involving a large number of different entities, playing in a dynamic scene to obtain the best advantages and profits. MASCEM is a multi-agent electricity market simulator to model market players and simulate their operation in the market. Market players are entities with specific characteristics and objectives, making their decisions and interacting with other players. MASCEM is integrated with ALBidS, a system that provides several dynamic strategies for agents’ behavior. This paper presents a method that aims at enhancing ALBidS competence in endowing market players with adequate strategic bidding capabilities, allowing them to obtain the higher possible gains out of the market. This method uses a reinforcement learning algorithm to learn from experience how to choose the best from a set of possible actions. These actions are defined accordingly to the most probable points of bidding success. With the purpose of accelerating the convergence process, a simulated annealing based algorithm is included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The current regulatory framework for maintenance outage scheduling in distribution systems needs revision to face the challenges of future smart grids. In the smart grid context, generation units and the system operator perform new roles with different objectives, and an efficient coordination between them becomes necessary. In this paper, the distribution system operator (DSO) of a microgrid receives the proposals for shortterm (ST) planned outages from the generation and transmission side, and has to decide the final outage plans, which is mandatory for the members to follow. The framework is based on a coordination procedure between the DSO and other market players. This paper undertakes the challenge of optimization problem in a smart grid where the operator faces with uncertainty. The results show the effectiveness and applicability of the proposed regulatory framework in the modified IEEE 34- bus test system.