933 resultados para Gas manufacture and works.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Gasoline coming from refinery fluid catalytic cracking (FCC) unit is a major contributor to the total commercial grade gasoline pool. The contents of the FCC gasoline are primarily paraffins, naphthenes, olefins, aromatics, and undesirables such as sulfur and sulfur containing compounds in low quantities. The proportions of these components in the FCC gasoline invariable determine its quality as well as the performance of the associated downstream units. The increasing demand for cleaner and lighter fuels significantly influences the need not only for novel processing technologies but also for alternative refinery and petrochemical feedstocks. Current and future clean gasoline requirements include increased isoparaffins contents, reduced olefin contents, reduced aromatics, reduced benzene, and reduced sulfur contents. The present study is aimed at investigating the effect of processing an unconventional refinery feedstock, composed of blend of vacuum gas oil (VGO) and low density polyethylene (LDPE) on FCC full range gasoline yields and compositional spectrum including its paraffins, isoparaffins, olefins, napthenes, and aromatics contents distribution within a range of operating variables of temperature (500–700 °C) and catalyst-feed oil ratio (CFR 5–10) using spent equilibrium FCC Y-zeolite based catalyst in a FCC pilot plant operated at the University of Alicante’s Research Institute of Chemical Process Engineering (RICPE). The coprocessing of the oil-polymer blend led to the production of gasoline with very similar yields and compositions as those obtained from the base oil, albeit, in some cases, the contribution of the feed polymer content as well as the processing variables on the gasoline compositional spectrum were appreciated. Carbon content analysis showed a higher fraction of the C9–C12 compounds at all catalyst rates employed and for both feedstocks. The gasoline’s paraffinicity, olefinicity, and degrees of branching of the paraffins and olefins were also affected in various degrees by the scale of operating severity. In the majority of the cases, the gasoline aromatics tended toward the decrease as the reactor temperature was increased. While the paraffins and iso-paraffins gasoline contents were relatively stable at around 5 % wt, the olefin contents on the other hand generally increased with increase in the FCC reactor temperature.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Porous carbon and carbide materials with different structures were characterized using adsorption of nitrogen at 77.4 K before and after preadsorption of n-nonane. The selective blocking of the microporosity with n-nonane shows that ordered mesoporous silicon carbide material (OM-SiC) is almost exclusively mesoporous whereas the ordered mesoporous carbon CMK-3 contains a significant amount of micropores (25%). The insertion of micropores into OM-SiC using selective extraction of silicon by hot chlorine gas leads to the formation of ordered mesoporous carbide-derived carbon (OM-CDC) with a hierarchical pore structure and significantly higher micropore volume as compared to CMK-3, whereas a CDC material from a nonporous precursor is exclusively microporous. Volumes of narrow micropores, calculated by adsorption of carbon dioxide at 273 K, are in linear correlation with the volumes blocked by n-nonane. Argon adsorption measurements at 87.3 K allow for precise and reliable calculation of the pore size distribution of the materials using density functional theory (DFT) methods.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The EU relies to a considerable degree on imports to meet its demand for natural gas. Whereas Norwegian export pipelines are directly connected to the EU gas system, a major share of Russian gas flows through the Ukrainian territory before reaching consumers located other consumers located down in the supply chain (e.g. Slovakia, Hungary or Italy). But is the Ukrainian gas transit route still a risk? Will the construction of the South Stream pipeline further reduce the importance of Ukraine as a transit country? Or is there more at stake here than meets the eye?

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The CEOs of Gazprom and China’s CNPC signed a contract concerning Russian gas supplies to China on 21 May 2014 in Shanghai. The contract had been under negotiation for many years and was signed in the presence of the two countries’ presidents. Under this 30-year deal, ultimately 38 billion m3 of natural gas will be exported annually from eastern Siberian fields (Chayandinskoye and Kovyktinskoye) via the Power of Siberia pipeline planned for construction in 2015–2019. The lengthy negotiation process (initial talks regarding this issue began back in the 1990s), the circumstances surrounding the signing of the contract (it was signed only on the second day of Vladimir Putin’s visit to Shanghai, and the Russian president’s personal engagement in the final phase of the talks turned out to be a key element) and information concerning the provisions of the contract (the clause determining the contract price has not been revealed) all indicate that the terms of the compromise are more favourable for China than for Russia. This contract is at present important to Russia mainly for political reasons (it will use the future diversification of gas export routes as an instrument in negotiations with the EU). However, the impact of this instrument seems to be limited since supplies cannot be redirected from Europe to Asia. It is unclear whether the contract will bring the anticipated long-term economic benefits to Gazprom. The gas price is likely to remain at a level of between US$350 and US$390 per 1000 m3. Given the high costs of gas field operation and production and transport infrastructure development, this may mean that supplies will be carried out at the margin of profitability. The Shanghai contract does not conclude the negotiation process since a legally binding agreement on gas pipeline construction has not been signed and not all of the financial aspects of the project have been agreed upon as yet (such as the issue of possible Chinese prepayments for gas supplies).