783 resultados para Environment factors


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Research Question: What relationships exist between general self efficacy, locus of control and the nursing practice environment and caring efficacy and job satisfaction? Background: Important characteristics of current nursing practice include nurses having the ability to develop and continue therapeutic relationships with patients, nurses having autonomy and control over the practice environment and nurses having more involvement in decision making. In addition, employee satisfaction is enhanced when organisations offer access to authority. Despite this, nurses continue to complain of feeling powerless in their ability to make decisions. Sample: The study population and criteria for selection included Registered Nurses in Australia who were at the time members of an Australian professional and industrial organisation. Methods: A cross-sectional survey was undertaken. Data analysis was conducted using descriptive and bivariate statistics, and structural equation modelling. Results: The model fit the data well (χ² = 2.3594, χ²/df = 2.3594 and CFI = 0.9987). Twenty four percent of variation in caring efficacy (CE) can be accounted for by general self-efficacy (GSE); work locus of control (WLC) and practice environment (PE) and 62% of the variation in job satisfaction (JS) can be accounted for by GSE, WLC and PE. All pathways were found to be significant except PE to CE. GSE positively explained CE (β = 0.38). WLC was negatively related to CE i.e., as CE scores increased WLC scores decreased (β = -0.23). Further testing of the model found CE was positively related to GSE (βZ = 0.38, p < 0.001) and negatively related to WLC (βZ = - 0.23, p = 0.001). PE was not significantly associated with CE (βZ = - 0.01, p = 0.85). JS was explained by PE, which was positively related (βZ = 0.69, p = < 0.001); GSE which was negatively related (βZ - 0 .09, p < 0.001) and WLC, which was also negatively related (βZ = - 0.20, p < 0.001). Implications for Practice Nursing and organisational leaders should ensure the development of strategies for professional development and orientation programmes which may enhance nurses’ ability to develop caring relationships and express caring behaviours to their patients and as a result improve organisational and patient outcomes. Nursing shortages and turnover rates are associated with job satisfaction and the nursing practice environment. Improving the nursing environment can produce benefits to the health system such as better job satisfaction, improved workforce retention and better patient outcomes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Bridges are currently rated individually for maintenance and repair action according to the structural conditions of their elements. Dealing with thousands of bridges and the many factors that cause deterioration, makes this rating process extremely complicated. The current simplified but practical methods are not accurate enough. On the other hand, the sophisticated, more accurate methods are only used for a single or particular bridge type. It is therefore necessary to develop a practical and accurate rating system for a network of bridges. The first most important step in achieving this aim is to classify bridges based on the differences in nature and the unique characteristics of the critical factors and the relationship between them, for a network of bridges. Critical factors and vulnerable elements will be identified and placed in different categories. This classification method will be used to develop a new practical rating method for a network of railway bridges based on criticality and vulnerability analysis. This rating system will be more accurate and economical as well as improve the safety and serviceability of railway bridges.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Knowledge Management (KM) is a process that focuses on knowledge-related activities to facilitate knowledge creation, capture, transformation and use, with the ultimate aim of leveraging organisations’ intellectual capital to achieve organisational objectives. Organisational culture and climate have been identified as major catalysts to knowledge creation and sharing, and hence are considered important dimensions of KM research. The fragmented and hierarchical nature of the construction industry illustrates its difficulties to operate in a co-ordinated and homogeneous way when dealing with knowledge-related issues such as research and development, training and innovation. The culture and climate of organisations operating within the construction industry are profoundly shaped by the long-established characteristics of the industry, whilst also being influenced by the changes within the sector. Meanwhile, the special project-based structure of construction organisations constitutes additional challenges in facing knowledge production. The study this paper reports on addresses the impact of organisational culture and climate on the intensity of KM activities within construction organisations, with specific focus on the managerial activities that help to manage these challenges and to facilitate KM. A series of semi-structured interviews were undertaken to investigate the KM activities of the contractors operating in Hong Kong. The analysis on the qualitative data revealed that leadership on KM, innovation management, communication management and IT development were key factors that impact positively on the KM activities within the organisations under investigation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Unlike most normal construction projects, post-disaster housing projects are diverse in nature, have unique socio-cultural and economical requirements, and are extremely dynamic and thus necessitate a meaningful and dynamic response. Post-disaster reconstruction practices that lack a strategy compatible with the severity of disaster, community culture, socio-economic requirements, environmental condition, government legislations, and technical and technological situations, often fail to operate and respond effectively to the needs of the wider affected population. Factors that frequently pose real threats to the eventual success of reconstruction projects are rarely given appropriate consideration when designing such projects. Research into past reconstruction practices has shown that ignoring these factors altogether or failing to give them meaningful consideration can affect housing reconstruction projects. In other words, they either miss their targets altogether or undergo serious modifications after their occupancy, subsequently resulting in an overall loss of project resources. This article touches upon the common factors that negatively impact the outcome of such projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is an army of bottom of the pyramid entrepreneurs (BOPE) who have the potential to transform developing economies, if they can identify and exploit business opportunities. BOPE could have unidentified resources that could lead to the recognition of radical new opportunities. This study paper asks how environmental factors and identification of resources affect Opportunity Recognition by BOP entrepreneurs in developing economies. To investigate this research question we conduct a literature review and plan semi-structured interviews of existing and nascent entrepreneurs in the largest and arguably the poorest country in Africa, the Democratic Republic of the Congo. In this paper we review the context of BOPE and describe the methodology we will use to gather and analyse data. Finally, we describe our access to suitable respondents for this study and how it will be conducted.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The impacts of online collaboration and networking among consumers on social media (SM) websites which are featuring user generated content in a form of product reviews, ratings and recommendations (PRRR) as an emerging information source is the focus of this research. The proliferation of websites where consumers are able to post the PRRR and share them with other consumers has altered the marketing environment in which companies, marketers and advertisers operate. This cross-sectional study explored consumers’ attitudes and behaviour toward various information sources (IS), used in the information search phase of the purchasing decision-making process. The study was conducted among 300 international consumers. The results were showing that personal and public IS were far more reliable than commercial. The findings indicate that traditional marketing tools are no longer viable in the SM milieu.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this study was to evaluate aspects of participation in a participatory action research project, the Ashgrove Healthy School Environment Project. Participatory action research is a form of research that creates change as an explicit part of the research process and requires the active participation of those by and for whom the research is being conducted. This study arose from concems by this researcher, who is also a co-facilitator of the project, that levels of participation were not as extensive as one might have hoped and that this seemingly low level would have a negative impact on the continuing participation of those already involved. Specifically. this evaluation sought to uncover the reasons that prompted participation, to identify structural barriers to initial involvement and to uncover participants' perceptions of the process, including barriers and opportunities. It also sought to record evidence of any shift in decision making and to draw implications about the findings that could assist the project, the school, other schools and the wider community. This evaluation involved focus group discussions and interviews with participants actively involved in the school project. The purpose was to uncover their views, feelings and perceptions about their participation and the participatory processes in use generally. It also included some examination of school documents and newsletters and as also drawn on the reflections of this 'insider' researcher, based on two years of involvement in facilitating the project. The findings that emerge from this study are heartening. Rather than feeling anxious about the long-term sustainability of the project, this researcher now feels more confident about its achievements, both in terms of the changes that have occurred in the school and about the participatory processes and levels of participation. Whilst the evaluation has identified a number of barriers, both institutional, personal and project related, it has also identified several key factors that serve to promote participation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Emerging sciences, such as conceptual cost estimating, seem to have to go through two phases. The first phase involves reducing the field of study down to its basic ingredients - from systems development to technological development (techniques) to theoretical development. The second phase operates in the direction in building up techniques from theories, and systems from techniques. Cost estimating is clearly and distinctly still in the first phase. A great deal of effort has been put into the development of both manual and computer based cost estimating systems during this first phase and, to a lesser extent, the development of a range of techniques that can be used (see, for instance, Ashworth & Skitmore, 1986). Theoretical developments have not, as yet, been forthcoming. All theories need the support of some observational data and cost estimating is not likely to be an exception. These data do not need to be complete in order to build theories. As it is possible to construct an image of a prehistoric animal such as the brontosaurus from only a few key bones and relics, so a theory of cost estimating may possibly be found on a few factual details. The eternal argument of empiricists and deductionists is that, as theories need factual support, so do we need theories in order to know what facts to collect. In cost estimating, the basic facts of interest concern accuracy, the cost of achieving this accuracy, and the trade off between the two. When cost estimating theories do begin to emerge, it is highly likely that these relationships will be central features. This paper presents some of the facts we have been able to acquire regarding one part of this relationship - accuracy, and its influencing factors. Although some of these factors, such as the amount of information used in preparing the estimate, will have cost consequences, we have not yet reached the stage of quantifying these costs. Indeed, as will be seen, many of the factors do not involve any substantial cost considerations. The absence of any theory is reflected in the arbitrary manner in which the factors are presented. Rather, the emphasis here is on the consideration of purely empirical data concerning estimating accuracy. The essence of good empirical research is to .minimize the role of the researcher in interpreting the results of the study. Whilst space does not allow a full treatment of the material in this manner, the principle has been adopted as closely as possible to present results in an uncleaned and unbiased way. In most cases the evidence speaks for itself. The first part of the paper reviews most of the empirical evidence that we have located to date. Knowledge of any work done, but omitted here would be most welcome. The second part of the paper presents an analysis of some recently acquired data pertaining to this growing subject.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

While scientists continue to explore the level of climate change impact to new weather patterns and our environment in general, there have been some devastating natural disasters worldwide in the last two decades. Indeed natural disasters are becoming a major concern in our society. Yet in many previous examples, our reconstruction efforts only focused on providing short-term necessities. How to develop resilience in the long run is now a highlight for research and industry practice. This paper introduces a research project aimed at exploring the relationship between resilience building and sustainability in order to identify key factors during reconstruction efforts. From extensive literature study, the authors considered the inherent linkage between the two issues as evidenced from past research. They found that sustainability considerations can improve the level of resilience but are not currently given due attention. Reconstruction efforts need to focus on resilience factors but as part of urban development, they must also respond to the sustainability challenge. Sustainability issues in reconstruction projects need to be amplified, identified, processed, and managed properly. On-going research through empirical study aims to establish critical factors (CFs) for stakeholders in disaster prone areas to plan for and develop new building infrastructure through holistic considerations and balanced approaches to sustainability. A questionnaire survey examined a range of potential factors and the subsequent data analysis revealed six critical factors for sustainable Post Natural Disaster Reconstruction that include: considerable building materials and construction methods, good governance, multilateral coordination, appropriate land-use planning and policies, consideration of different social needs, and balanced combination of long-term and short-term needs. Findings from this study should have an influence on policy development towards Post Natural Disaster Reconstruction and help with the achievement of sustainable objectives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

QUT Teaching and Learning Support Services 'Revisiting University Teaching’program for mid-career academics. 'Innovations in Teaching at QUT' presentations. Presentations were part of a 2 day program that provides opportunities for experienced academic staff with responsibilities for teaching to review their current teaching practices and explore innovations in teaching that will assist them to enhance student learning and develop their own scholarship of teaching. The presenter responded to the following: 1.What is the innovation you have incorporated into your teaching? - give a brief overview/ description/ demonstration of the innovation 2.What challenges/issues prompted you to make changes in your approach? Were they discipline specific? Operational? Opportunistic? 3.What factors did you need to consider in implementing these changes? Which factors enabled success or hindered? 4.What has this innovation achieved so far? How have learners responded? How have the broader teaching team and academic staff from other units in your course responded? 5.How could this innovation be used by other academics in their teaching? What do you see as the possibilities for further expansion of this innovation? (NB. This question could be answered as part of a final sharing of group discussion). Presenter: Shannon Satherley

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reports of immoral marketing practices i n the construction industry attract political, media and public but not much academic interest. This paper adopts a behavioural perspective and proposes a model for applying marketing ethics concepts and methods in the study of collusion in the construction contract market. An extensive multidisciplinary review of existing literature identified a lack of adequate conceptualisation of the mechanisms and decision making factors of collusive tendering. The process of developing the model is detailed in this paper. The objectives and methodology of the research project that tested the model are also outlined. The paper concludes with a brief note on the contributions and application of the proposed model.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It is commonly held that the ability of the estimator to apply professional skill and judgement is an important factor in the production of an accurate cost estimate. This chapter identifies these abilities and attributes of the individual estimator that affects estimating accuracy. These human factors are examined under the headings of the role of the estimators, skills of the estimator, characteristics of the estimator, interpretation of data, and the influence of expertise.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Post–disaster reconstruction projects are often considered ineffectual or unproductive because on many occasions in the past they have performed extremely poorly during post-contract occupation, or have failed altogether to deliver acceptable outcomes. In some cases, these projects have already failed even before their completion, leading many sponsor aid organisations to hold these projects up as examples of how not to deliver housing reconstruction. Research into some previous unsuccessful projects has revealed that often the lack of adequate knowledge regarding the context and complexity involved in the implementation of these projects is generally responsible for their failure. Post-disaster reconstruction projects are certainly very complex in nature, often very context-specific and they can vary widely in magnitude. Despite such complexity, reconstruction projects can still have a high likelihood of success if adequate consideration is given to the importance of factors which are known to positively influence reconstruction efforts. Good outcomes can be achieved when planners and practitioners ensure best practices are embedded in the design of reconstruction projects at the time reconstruction projects they are first instigated. This paper outlines and discusses factors that significantly contribute to the successful delivery of post-disaster housing reconstruction projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Completing a PhD on time is a complex process, influenced by many interacting factors. In this paper we take a Bayesian Network approach to analyzing the factors perceived to be important in achieving this aim. Focusing on a single research group in Mathematical Sciences, we develop a conceptual model to describe the factors considered to be important to students and then quantify the network based on five individual perspectives: the students, a supervisor and a university research students centre manager. The resultant network comprised 37 factors and 40 connections, with an overall probability of timely completion of between 0.6 and 0.8. Across all participants, the four factors that were considered to most directly influence timely completion were personal aspects, the research environment, the research project, and incoming skills.