228 resultados para Demolition


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this work is to find a methodology in order to make possible the recycling of fines (0 - 4 mm) in the Construction and Demolition Waste (CDW) process. At the moment this fraction is a not desired by-product: it has high contaminant content, it has to be separated from the coarse fraction, because of its high water absorption which can affect the properties of the concrete. In fact, in some countries the use of fines recycled aggregates is highly restricted or even banned. This work is placed inside the European project C2CA (from Concrete to Cement and Clean Aggregates) and it has been held in the Faculty of Civil Engineering and Geosciences of the Technical University of Delft, in particular, in the laboratory of Resources And Recycling. This research proposes some procedures in order to close the loop of the entire recycling process. After the classification done by ADR (Advanced Dry Recovery) the two fractions "airknife" and "rotor" (that together constitute the fraction 0 - 4 mm) are inserted in a new machine that works at high temperatures. The temperatures analysed in this research are 600 °C and 750 °C, cause at that temperature it is supposed that the cement bounds become very weak. The final goal is "to clean" the coarse fraction (0,250 - 4 mm) from the cement still attached to the sand and try to concentrate the cement paste in the fraction 0 - 0,250 mm. This new set-up is able to dry the material in very few seconds, divide it into two fractions (the coarse one and the fine one) thanks to the air and increase the amount of fines (0 - 0,250 mm) promoting the attrition between the particles through a vibration device. The coarse fraction is then processed in a ball mill in order to improve the result and reach the final goal. Thanks to the high temperature it is possible to markedly reduce the milling time. The sand 0 - 2 mm, after being heated and milled is used to replace 100% of norm sand in mortar production. The results are very promising: the mortar made with recycled sand reaches an early strength, in fact the increment with respect to the mortar made with norm sand is 20% after three days and 7% after seven days. With this research it has been demonstrated that once the temperature is increased it is possible to obtain a clean coarse fraction (0,250 - 4 mm), free from cement paste that is concentrated in the fine fraction 0 - 0,250 mm. The milling time and the drying time can be largely reduced. The recycled sand shows better performance in terms of mechanical properties with respect to the natural one.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Carnegie Museum in downtown Houghton has a pair of Finnish-connected exhibits on display. A photographic exhibit titled “The Last Days of Italian Hall” by local photographer Eric Munch will be open to the public, as well as “Family Ties: Memorials to Those Lost in the 1913 Italian Hall Tragedy” by the Houghton-Keweenaw Genealogical Society. Munch’s photographs were taken in the early and mid 1980s, shortly after he moved to the Copper Country, and consist of both interior and exterior shots of the Hall, including some taken at the time of its demolition. The “Family Ties” exhibit is the result of a project through which HKGS members researched the genealogy of every Italian Hall tragedy victim. Also on exhibit is "From the Old School: Memories from the Old Houghton High School 1923-1989". Exhibit includes oral histories by former students and faculty recorded as a community project by students from the Class of 2013. Winning projects from the Western UP Science Fair (grades 4-8) are also being displayed. Carnegie Museum exhibit information can be obtained by calling (906) 482-7140.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Carnegie Museum in downtown Houghton has a pair of Finnish-connected exhibits on display. A photographic exhibit titled “The Last Days of Italian Hall” by local photographer Eric Munch will be open to the public, as well as “Family Ties: Memorials to Those Lost in the 1913 Italian Hall Tragedy” by the Houghton-Keweenaw Genealogical Society. Munch’s photographs were taken in the early and mid 1980s, shortly after he moved to the Copper Country, and consist of both interior and exterior shots of the Hall, including some taken at the time of its demolition. The “Family Ties” exhibit is the result of a project through which HKGS members researched the genealogy of every Italian Hall tragedy victim. Also on exhibit is "From the Old School: Memories from the Old Houghton High School 1923-1989". Exhibit includes oral histories by former students and faculty recorded as a community project by students from the Class of 2013. Winning projects from the Western UP Science Fair (grades 4-8) are also being displayed. Carnegie Museum exhibit information can be obtained by calling (906) 482-7140.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The article reflects on the difficult relation between community work against domestic violence and local crime prevention under the conditions of the neoliberal state that cuts down on social benefits and promotes self-help, active citizenship and self-responsibility instead while at the same time restoring the punishing state with its strict regime of law-and-order. The author describes a project Tarantula - she started herself while being a social worker in Hamburg, Germany. Tarantula was aimed at strengthening social networks and the neighbours' willingness to get involved in favour of affected women. Although conceptualized as an emancipatory approach referring to community organizing in the tradition of social movements it is questionable whether and how this can really work in the current situation. At present, the field of crime control is being reconfigured as a result of political and administrative decisions, which, for their part, are based on a new structure of social relations and cultural attitudes. The demolition of the 'welfare state' means the re-coding of the security policy that facilitates the development of interventionist techniques that govern and control individuals through their own ability to act.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The multi-BCL-2 homology domain pro-apoptotic BCL-2 family members BAK and BAX have critical roles in apoptosis. They are essential for mitochondrial outer-membrane permeabilization, leading to the release of apoptogenic factors such as cytochrome-c, which promote activation of the caspase cascade and cellular demolition. The BOK protein has extensive amino-acid sequence similarity to BAK and BAX and is expressed in diverse cell types, particularly those of the female reproductive tissues. The BOK-deficient mice have no readily discernible abnormalities, and its function therefore remains unresolved. We hypothesized that BOK may exert functions that overlap with those of BAK and/or BAX and examined this by generating Bok−/−Bak−/− and Bok−/−Bax−/− mice. Combined loss of BOK and BAK did not elicit any noticeable defects, although it remains possible that BOK and BAK have critical roles in developmental cell death that overlap with those of BAX. In most tissues examined, loss of BOK did not exacerbate the abnormalities caused by loss of BAX, such as defects in spermatogenesis or the increase in neuronal populations in the brain and retina. Notably, however, old Bok−/−Bax−/− females had abnormally increased numbers of oocytes from different stages of development, indicating that BOK may have a pro-apoptotic function overlapping with that of BAX in age-related follicular atresia.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The need of the Bourbon monarchy to build a Naval Base in the Bay of Cartagena (Spain) during the eighteenth century, implied performing various actions on the environment which allowed the construction of the new dock. One of the priority actions was the transformation of the watershed of the streams that flowed into Mandaraches´s sea. For this reason, a dike was designed and constructed in the northern part of the city. The design of this great work, which was designed as a fortification of the city, was subject to considerable uncertainties. Its proximity to the city involved the demolition of several buildings in the San Roque´s neighborhood. The greater or lesser number of affected buildings and the value of the just indemnification for the expropriation of them, become decisive factors to determine if the work was viable for the Royal Estate or not.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

La tesis doctoral “Mejoras Tecnológicas en el Reciclado de Residuos de Construcción y Demolición (RCD)” investiga la utilización de los separadores hidráulicos para mejorar la calidad de los áridos reciclados, y se demuestra que es un equipo más eficiente que las técnicas actuales basadas en la simple separación por densidad. En la tesisn se ha realizado inicialmente una revisión de la situación del sector, para a continuación centrarse en los sistemas de separación utilizados en las plantas de valorización españolas. Una vez analizados éstos y en particular los de tipo hidráulico, de los que se resume un estudio comparativo, se ha procedido a ensayar a escala de Laboratorio el comportamiento de un separador hidráulico de aceleración diferencial con diversos materiales procedentes de tres plantas de reciclaje. Adicionalmente fueron probadas otras técnicas, como es la separación magnética para mejorar la calidad de los productos reciclados. En vista de los buenos resultados de la investigación, se procede a escalar los ensayos con equipo piloto y distintas composiciones de naturaleza cerámica y hormigón. El equipo utilizado fue un jig de 3´x 1´ en el que se ensayaron las tres muestras con resultados diferentes. La limpieza de los materiales impropios y el yeso fue positiva en las tres muestras, y únicamente la separación entre sí de los componentes pétreos, resultó dependiente de su proporción en la mezcla, obteniéndose los mejores resultados en las muestras con menor cantidad de materiales cerámicos. Finalmente, se procede a analizar en un laboratorio reconocido las propiedades de los áridos reciclados obtenidos en la separación hidráulica por jig, y constatar las mejoras conseguidas para su utilización como materiales de construcción en usos ligados y no ligados. Todo lo anterior permite afirmar que los equipos de separación hidráulica con aceleración diferencial (jig) presentan una innovación tecnológica en el reciclado de los residuos de construcción y demolición (RCD). ABSTRACT The doctoral thesis “Technological Improvements in Recycling of Construction and Demolition Waste (C&DW)” researches the hydraulic separators utilization in order to improve the recycled aggregates quality, demonstrating that the equipment is more efficient than the current techniques based on the simple density separation. This doctoral thesis has been initially done reviewing the situation of the sector and focusing afterwards on the separation systems used at the Spanish recovery facilities. Once analyzed these and, particularly, the hydraulic type ones, from which a comparative study has been summarized, the behavior of a differential acceleration hydraulic separator with various materials coming from three recycling plants has been tested at laboratory scale. Additionally other techniques have been tested, such as the magnetic separation to improve the quality of recycled products. In view of the good investigation results, the testing process scaled up by using pilot equipment and different ceramics and concrete compositions. The equipment utilized was a jig 3” x 1”, in which the three samples were tested with different results. The unsuitable materials and gypsum cleanliness was positive on the three samples and only the separation among the stony components turned out to be dependent of its proportion in the mixing, obtaining the best results in the samples with less quantity of ceramic materials. Finally, the properties of the recycled aggregates obtained by jig hydraulic separation are analyzed at a recognized laboratory and the improvements gained for their utilization as construction materials, in bounded and unbounded uses, are stated. The facts cited are a basis for affirming that the hydraulic separator equipments with differential acceleration (jig) offer a technological innovation in the Recycling of Construction and Demolition Waste (C&DW).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

El objetivo principal de este trabajo de investigación es estudiar las propiedades del árido reciclado mixto para la fabricación de hormigón reciclado en aplicaciones no estructurales. Se ha realizado la caracterización completa de 35 muestras de áridos reciclados mixtos gruesos de distinta calidad, procedentes de 13 plantas de tratamiento diferentes de la geografía española. Se han estudiado las correlaciones que existen entre las diferentes propiedades, en particular, con la absorción de agua, el contenido de sulfatos y la composición. Se propone una clasificación de los áridos reciclados y se limita de forma indicativa el contenido de yeso para que una muestra de árido reciclado mixto cumpla con la limitación del 0,8% de los sulfatos solubles en ácido de la Instrucción EHE-08. Recycling of construction and demolition waste (CDW) has become a widespread concern in Spain for the last years, as a way to preserve natural resources and achieve a better control of waste disposal sites.Specific applications which make use of mixed recycled aggregates are of great importance, as this types of aggregates constitute the majority of the total production. Structural and non-structural concrete is one of the possible applications, being this the main goal of our study. This paper presents a study on the physical and chemical characteristics of mixed recycled aggregates which have been obtained from different CDW treatment plants of Spain. Correlations between the different properties were investigated in order to find criterions of acceptance for recycled aggregates to be used in concrete. The comparison between the properties offers the possibility of pre-selecting a great quantity of mixed recycled aggregates, these being suitable for either structural and non-structural concrete. The determination of water absorption and the gypsum content are good indicators in order to evaluate the quality of the mixed recycled aggregates for its application in the production of concrete.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Un problema del ferrocarril al paso por las ciudades europeas es el efecto barrera generado, que impide su desarrollo más allá de las vías. Si se salta la barrera lo cierto es que ello se hace sólo en sitios concretos y el efecto psicológico de aislamiento persiste para los habitantes del entorno. Este trabajo presenta de manera sucinta los problemas de concepción, comprobación y vibraciones planteados por la estructura de cubierta de la trinchera ferroviaria de Hendaya, consistente en una losa de hormigón pretensado y luz variable de 20-40 metros, que resuelve el problema de aislamiento entre las dos partes de la ciudad. Su construcción ha sido posible gracias al acuerdo entre la SNCF e inversores privados y está permitiendo la construcción sobre ella de 6 edificios de viviendas y una residencia de turismo, la demolición del antiguo ?Pont-Vieux? y la construcción de un nuevo ?Pont-Vieux?, integrado completamente en la promoción inmobiliaria. An important problem put by the train in its passage by the cities of Europe generally and in France in particular is the effect barrier which builds up, preventing the cities from developing beyond. Even if this barrier is crossed, it is certain that the passage is restricted to concrete places and always acts as psychological barrier for the local residents. This article presents in a brief way the problems of conception, analysis and vibration of the cover structure of the railroad trench of Hendaye. This structure consists of a 20-40 meters span slab of pre-stressed concrete that solves the isolation problem of both parts of the town of Hendaye. Its construction was possible thanks to the agreement of the SNCF (French Railways)and some private investors, and is allowing the investors the construction on top of 6 residential buildings and a holiday residence, with demolition of the ancient “Pont-Vieux” and building of a new “Pont-Vieux”, which is completely integrated into the real-estate development. Special attention is given to the change of transverse cross-section of the slab during construction stages, which originates a redistribution of stresses, and to the long-term equilibrium of horizontal forces.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The famous plan for Toulouse-Le Mirail, by Candilis/Josic/Woods (1961), proposed a radical and hitherto new public space, the dalle, an elevated linear ?stem? that wove the whole urban intervention and concentrated all the commercial, social and cultural activity of the neighbourhood. However, the project is today stigmatized as a total social failure. The dalle has been demolished and a traditional commercial street has been implemented. Was demolition the sole alternative for Le Mirail?s future? This paper aims at identifying certain themes around the conception of the dalle, capable of informing today?s theory and practice in the design of new shopping/public-scapes. It reflects on both the most positive values of the project and on its naiveties and mistakes, conscious of the social unrest that aggrandized them. Ultimately, it calls for a deeper reflection on the urban proposals of the Modern Movement, beyond demolition as the only possible solution.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The goal of this communication is to offer, through computer-aided design tools, a methodology to recover and virtually reconstruct disappeared buildings of our industrial historical heritage. It will be applied to the case of the flour factory "El Puente Colgante" (The Suspended Bridge) in Aranjuez, which was demolished in 2001. The process is as follows: After a historical analysis of the evolution in time of the flour factory, a field work provides data allowing an info graphic reconstruction of the factory. Once this information has been processed, a lifting of the current state is made with AutoCAD, and a three-dimensional model is built with the Rhinoceros application. Then images of the ensemble are obtained with the applications Rhinoceros and V-Ray, ending with a postproduction with Photoshop. The proposed methodology has permitted to obtain a three-dimensional model of the flour factory ?El Puente Colgante? in Aranjuez, with an accurate virtual reconstruction of its original state prior to demolition. The procedure exposed is susceptible to be generalized for any other example of industrial architecture.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The complexity of climate change and its evolution during the last few years has a positive impact on new developments and approaches to reduce the emissions of CO2. Looking for a methodology to evaluate the sustainability of a roadway, a tool has been developed. Life Cycle Assessment (LCA) is being accepted by the road industry to measure and evaluate the environmental impacts of an infrastructure, as the energy consumption and carbon footprint. This paper describes the methodology to calculate the CO2 emissions associated with the energy embodied on a roadway along its life cycle, including construction, operations and demolition. It will assist to find solutions to improve the energy footprint and reduce the amount of CO2 emissions. Details are provided of both, the methodology and the data acquisition. This paper is an application of the methodology to the Spanish highways, using a local database. Two case studies and a practical example are studied to show the model as a decision support for sustainable construction in the road industry.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

En el sector de la edificación, las grandes constructoras comienzan a considerar aspectos medioambientales, no limitándose a lo establecido por la legislación vigente, y buscando la implementación de buenas prácticas. Si bien este hecho es una realidad para las grandes empresas constructoras, todavía falta que la gran mayoría de las empresas del sector (pequeñas y medianas) adopten ésta tendencia. En este sentido, las publicaciones y estadísticas consultadas revelan que el sector de la construcción sigue siendo el sector con menor número de Sistemas de Gestión Ambiental (SGA) certificados en comparación con otros sectores industriales, debido principalmente a las peculiaridades de su actividad. Por otra parte, el sector de la construcción genera grandes cantidades de residuos de construcción y demolición (RCD). Aunque, en los últimos años la actividad de la construcción ha disminuido, debido a la crisis económica del país, no hay que olvidar todos los problemas causados por este tipo de residuos, o mejor dicho, por su gestión. La gestión de los RCD actual está lejos de alcanzar la meta propuesta en la Directiva Marco de Residuos (DMR), la cual exige un objetivo global para el año 2020 en el que el 70% de todos los RCD generados deberán ser reciclados en los países de la UE. Pero, la realidad es que sólo el 50% de la RCD generados en la Unión Europea se recicla. Por este motivo, en los últimos años se ha producido una completa modificación del régimen jurídico aplicable a los RCD, incorporando importantes novedades a nuestro ordenamiento interno como son: la redacción de un Estudio de gestión de RCD (en fase de diseño) y un Plan de gestión de RCD (en fase de ejecución). Entre estas medidas destaca el poder conocer, con la antelación suficiente, la cantidad y el momento en que los RCD son generados, para así poder planificar la gestión más adecuada para cada categoría de RCD. Es por ello que el desarrollo de cualquier instrumento que determine la estimación de RCD así como iniciativas para su control debe ser considerado como una herramienta para dar respuestas reales en el campo de la sostenibilidad en la edificación. Por todo lo anterior, el principal objetivo de la Tesis Doctoral es mejorar la gestión actual de los RCD, a través de la elaboración e implementación en obra de un Sistema de gestión de RCD en fase de ejecución que podrá ser incluido en el Sistema de Gestión Ambiental de las empresas constructoras. Para ello, se ha identificado la actividad que más residuo genera, así como las diferentes categorías de RCD generadas durante su ejecución, a través del análisis de nueve obras de edificación de nueva planta. Posteriormente, se han determinado y evaluado, en función de su eficacia y viabilidad, veinte buenas prácticas encaminadas a reducir la generación de RCD. También, se han identificado y evaluado, en función de su coste económico, cinco alternativas de gestión para cada categoría de RCD generada. Por último, se ha desarrollado e implementado un Sistema de Gestión de RCD en una empresa de construcción real. En definitiva, el Sistema de Gestión de RCD propuesto contiene una herramienta de estimación de RCD y también proporciona una relación de buenas prácticas, según su viabilidad y eficacia, sobre los aspectos más significativos en cuanto a la gestión de RCD se refiere. El uso de este Sistema de gestión de RCD ayudará a los técnicos de la construcción en el desarrollo de los documentos "Estudio de gestión de RCD " y "Plan de gestión de RCD " - requeridos por ley -. Además, el Sistema promueve la gestión ambiental de la empresa, favoreciendo la cohesión del proceso constructivo, estableciendo responsabilidades en el ámbito de RCD y proporcionando un mayor control sobre el proceso. En conclusión, la implementación de un sistema de gestión de RCD en obra ayuda a conseguir una actividad de edificación, cuyo principal objetivo sea la generación de residuos cero. ABSTRACT Currently, in the building sector, the main construction companies are considering environmental issues, not being limited to the current legislation, and seeking the implementation of good practices. While this fact is a reality for large construction companies, still the vast majority of construction companies (small and medium enterprises) need to accept this trend. In this sense, official publications and statistics reveal that the construction sector remains with the lowest number of certified Environmental Management Systems (EMS) compared to other industrial sectors, mainly due to the peculiarities of its activity. Moreover, the construction industry in Spain generates large volumes of construction and demolition waste (CDW) achieving a low recycling rate compared to other European Union countries and to the target set for 2020. Despite the complete change in the legal regime for CDW in Spain, there are still several difficulties for their application at the construction works. Among these difficulties the following can be highlighted: onsite segregation, estimating CDW generation and managing different CDW categories. Despite these difficulties, the proper CDW management must be one of the main aspects considered by construction companies in the EMS. However, at present the EMS used in construction companies consider very superficially CDW management issues. Therefore, current EMS should go a step further and include not only procedures for managing CDW globally, but also specific procedures for each CDW category, taking into account best practices for prevention, minimization and proper CDW management in order to achieve building construction works with zero waste generation. The few scientific studies analysing EMS implementation in construction enterprises focus on studying the benefits and barriers of their implementation. Despite the drawbacks found, implementing an EMS would bring benefits such as improving the corporate image in relation to the environment, ensuring compliance with the law or reducing environmental risks. Also, the international scientific community has shown great interest in defining models to estimate in advance the CDW that will be generated during the building construction or rehabilitation works. These studies analyse the overall waste generation and its different CDW categories. However, despite the many studies found on CDW quantification, analysing its evolution throughout the construction activities is a factor that must be further studied and discussed in greater depth, as results would be of great significance when planning the CDW management. According to the scientific studies analysing the implementation of good environmental practices in construction sites, it seems that, in general, the CDW collection system is done in a decentralized manner by each subcontracted company. In addition, the corporate image generated when poor practices are done may adversely affect the company's reputation and can result in loss of contracts. Finally, although there are numerous guides and manuals of good practices for CDW management, no references have been found implementing these measures in the Environmental Management System of the construction companies. From all the above, this thesis aims to provide answers to reduce the environmental impact caused by CDW generation in building construction works, in order to get a building process with zero waste generation. In this sense, is essential to generate new knowledge in order to implement a system which can carry out comprehensive management of CDW generated onsite, at the design stage until the end of its life cycle, taking into account both technical and economic criteria. Therefore, the main objective of this thesis is to define and implement a CDW management system for residential building construction works, helping construction agents not only to manage the CDW in accordance with current legislation, but also minimizing their generation on site by applying best practices, resulting in achieving the goal of zero waste in building works.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Uno de los retos a los que se enfrenta la humanidad es la demanda de una sociedad con casi cero residuos: la búsqueda de una economía más eficiente en el uso de los recursos teniendo en cuenta el cambio climático y un abastecimiento sostenible de materias primas que permitan satisfacer las necesidades de una población mundial cada vez mayor, dentro de los límites sostenibles de los recursos naturales del planeta. Abordar este desafío implica la recuperación y reciclaje de materiales para reducir consumos de materias primas y, para ello, debe promoverse la innovación en la prevención y gestión de residuos, como estrategia hacia un desarrollo urbano sostenible. Los envases y embalajes forman parte de la cultura actual, relacionándose con el grado de desarrollo de países y regiones; el sector de la construcción no es ajeno a la problemática y genera un importante volumen de embalajes en las obras que no se gestionan de forma adecuada. El modelo de gestión de Residuos de Construcción Demolición (RCD) actual es poco eficaz, ya que los vertederos siguen recibiendo grandes cantidades de residuos valorizables. La normativa ha conseguido minimizar las prácticas ilegales, pero se comprueba que la gestión actual de los RCD en obra deja en manos de las plantas de tratamiento la misión de separar los residuos según su naturaleza y los datos aportados por las distintas plantas no permiten afirmar el grado de alcance de dicho objetivo, ni el destino de los mismos. Los envases y embalajes son un tipo de residuos que por su naturaleza suponen una fuente de recursos valorizables y por ello están presentes en directivas y leyes, dirigidas fundamentalmente al sector de la alimentación. En el ámbito de la construcción, hasta la fecha, no se habían tratado de forma específica, motivo que justifica este trabajo. Esta Tesis Doctoral tiene como objetivo principal mejorar la gestión de residuos de embalajes procedentes de materiales de construcción. Para ello se estudia un importante conjunto de obras de edificación residencial colectiva de 1173 viviendas, análisis que llevará a conocer los patrones de producción de los Residuos de Envases y Embalajes en Construcción (REEC) e identificar los productos o materiales responsables de su generación. La monitorización realizada, permitirá diseñar estrategias específicas que minimicen la generación de estos residuos y optimicen su valorización. Se ha podido comprobar que el tratamiento particularizado de los REEC puede mejorar los resultados de la gestión del conjunto de RCD, debido a que, al no mezclarse, se elimina un importante agente contaminador de los residuos inertes. Las obras analizadas alcanzan un nivel de segregación in situ muy bajo, y los capítulos de cerramientos e instalaciones suman más del 50% del global de REEC. Particularizando en cada tipo de material, el cartón predomina en los trabajos de electricidad, el plástico en las particiones y la madera en fachadas. Se evalúa la opción del eco-­‐rediseño para uno de los embalajes predominantes, y se identifican estrategias para minimizar su impacto. Se comprueba que el ahorro en la gestión de RCD en caso de impulsar la segregación in situ no es muy significativo en las obras estudiadas, si bien se demuestra que la viabilidad económica es el factor más importante para motivar a las empresas constructoras. Las Administraciones Públicas deberían incentivar la gestión responsable, estableciendo medidas de control en las plantas de tratamiento e implementando en sus obras medidas de gestión de RCD ejemplares para el mercado. Una adecuada planificación de la obra, y formación específica para el personal son medidas que facilitan la segregación in situ y mejoran los resultados. Los promotores, mediante su relación contractual con el resto de agentes, tienen la capacidad de establecer objetivos de reducción, planificación y gestión sostenible de los REEC. Por último, se propone un sistema de gestión de REEC, integrable dentro del Sistema de Gestión de la empresa constructora, que permite evitar que residuos valorizables tales como los envases y embalajes se envíen a vertedero, guiando al sector hacia un futuro más respetuoso, alineado con el desarrollo sostenible. ABSTRACT One of the challenges humanity faces is the demand of an almost zero waste society: the search for a more efficient economy in the use of resources, taking into account climate change and a sustainable supply of raw materials, that meet the needs of an increasing world population within the sustainable limits of the planet's natural resources. Addressing this challenge involves the recovery and recycling of materials to reduce consumption of raw materials, so innovation must therefore be promoted in the prevention and management of waste, as a strategy towards a sustainable urban development. Packaging is part of our current culture and is related to the degree of development of countries and regions; the construction sector is no stranger to this problem and generates a significant amount of packaging waste in the site works, which nowadays is not managed properly. The current Construction Demolition Waste (CDW) management model is ineffective, since landfills continue to receive large amounts of recoverable waste. The legislation has managed to minimize illegal practices, but it has been observed that the current management of CDW in the analysed works leaves the mission of separating waste according to their nature to the plants, and data provided by the latter does not allow for checking the scope of this objective, nor the destiny of the waste. Packaging is a type of waste which, by its nature, represents a source of recoverable resources and is therefore present in directives and laws, focused primarily on the food industry. It has not been specifically treated to date in the construction field, hence the reason that justifies this work. This Thesis aims to improve the management of packaging waste from construction materials. An important set of residential building works with 1173 dwellings is analysed, which leads to knowledge on the production patterns of packaging waste (PW) in the construction industry, and the identification of the products responsible for its generation. The monitorization also allows for the design of specific strategies which minimise the generation of waste and optimize recovery. It has been found that the individualized treatment of PW can improve the results of the management of the whole CDW since, when not mixed, a major pollutant of inert waste is removed. The analysed works reached a very low segregation level and the façades and building services phases account for more than 50% of the overall PW. Focusing on each type of material, cardboard predominates electricity works, plastic on partitions and wood on façades. Eco-­‐redesign is evaluated for one of the predominant packages, and strategies are identified to minimise their impact are . There is evidence that the savings in the CDW management in case of promoting segregation on site are not very significant at the studied works, although economic feasibility is the most important factor to motivate the construction companies. Public Administrations should encourage responsible management, establishing control measures in treatment plants and implementing CDW management exemplary measures on their work sites for the market. A proper planning of the works and specific training for the personnel are measures that facilitate in situ segregation and improve outcomes. The developers, through their contractual relationship with the other agents, have the ability to set reduction targets, planning and sustainable management of PW. Finally, a management system for PW is proposed, integrated within the Management System of the construction company, which aims to avoid that recoverable waste such as packaging is sent to landfill, leading the industry towards a more environmentally friendly future, aligned with sustainable development.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

La problemática actual de las canteras en la cercanía de las grandes ciudades, debido a la escasez de yacimientos y a las restricciones medioambientales, están poniendo en graves problemas el abastecimiento de áridos naturales y encareciendo su coste. El proyecto realizado responde a la actual necesidad de los países del mundo desarrollado por buscar soluciones a los problemas de abastecimiento de materias primas para la construcción en las zonas urbanizadas. La dependencia de nuestra sociedad hacia los recursos naturales y la consideración de su importancia hacen que se deban aprovechar al máximo, ya sea reciclando, reutilizando o revalorizando. Este proyecto está centrado en los residuos utilizados en el sector de la construcción y la viabilidad de su reutilización. Hemos evaluado la situación y la legislación acerca de la posibilidad de reciclar los materiales de la construcción para volverlos a introducir en el mercado; llevando a cabo una aplicación práctica en la Comunidad de Madrid. El proyecto se complementa con el diseño y estudio de viabilidad de una instalación de reciclaje de residuos de la construcción y demolición en este micromercado. ABSTRACT The current problems of the quarries in the vicinity of large cities, due to the scarcity of deposits and environmental restrictions are putting in serious trouble supplying natural aggregates and more expensive cost. The project undertaken reflects the current need for developed countries to seek solutions to the problems of supply of raw materials for construction in urbanized areas worldwide. The dependence of our society towards natural resources and consideration of its importance that should be made to maximize either by recycling , reusing or revalued. This project is focused on the waste used in the construction sector and feasibility of reuse. We have assessed the situation and legislation about the possibility of recycling construction materials for re- entering the market ; carrying out a practical application in the Community of Madrid. The project complements the design and feasibility study of a facility for recycling construction waste and demolition in this micro market