953 resultados para Cost Planning
Resumo:
This thesis investigates the role of accounting in planning and control in the Egyptian Iron and Steel Company "Hadisolb". The hypothesis is that there should be planning and control at appropriate levels, with a significant accounting involvement, In an organisation such as the Egyptian Iron and Steel Company "Hadisolb" . Part One of the thesis explains the role of accounting in planning and control, with special emphasis on its role in long-range corporate planning and control. Parts Two and Three review the history of the Egyptian Iron and Steel Company "Hadisolb", its organisation and structure, also the role of accounting in its planning and control arrangements, together with comments and criticisms concerning this. Part Four is mainly recommendations for alterations or improvements in planning and control in Hadisolb. This includes a suggested planning and organisation structure, physical and cost control reporting structures.
Resumo:
This thesis deals with the problems associated with the planning and control of production, with particular reference to a small aluminium die casting company. The main problem areas were identified as: (a) A need to be able to forecast the customers demands upon the company's facilities. (b) A need to produce a manufacturing programme in which the output of the foundry (or die casting section) was balanced with the available capacity in the machine shop. (c) The need to ensure that the resultant system enabled the company's operating budget to have a reasonable chance of being achieved. At the commencement of the research work the major customers were members of the automobile industry and had their own system of forecasting, from which they issued manufacturing schedules to their component suppliers, The errors in the forecast were analysed and the distributions noted. Using these distributions the customer's forecast was capable of being modified to enable his final demand to be met with a known degree of confidence. Before a manufacturing programme could be developed the actual manufacturing system had to be reviewed and it was found that as with many small companies there was a remarkable lack of formal control and written data. Relevant data with regards to the component and the manufacturing process had therefore to be collected and analysed. The foundry process was fixed but the secondary machining operations were analysed by a technique similar to Component Flow Analysis and as a result the machines were arranged in a series of flow lines. A system of manual production control was proposed and for comparison, a local computer bureau was approached and a system proposed incorporating the production of additional management information. These systems are compared and the relative merits discussed and a proposal made for implementation.
Resumo:
Investment in transport infrastructure can be highly sensitive to uncertainty. The scale and lead time of strategic transport programmes are such that they require continuing policy support and accurate forecasting. Delay, cost escalation and abandonment of projects often result if these conditions are not present. In Part One the physical characteristics of infrastructure are identified as a major constraint on planning processes. The extent to which strategies and techniques acknowledge these constraints is examined. A simple simulation model is developed to evaluate the effects on system development of variations in the scale and lead time of investments. In Part Two, two case studies of strategic infrastructure investment are analysed. The absence of a policy consensus for airport location was an important factor in the delayed resolution of the Third London Airport issue. In London itself, the traffic and environmental effects of major highway investment ultimately resulted in the abandonment of plans to construct urban motorways. In both cases, the infrastructure implications of alternative strategies are reviewed with reference to the problems of uncertainty. In conclusion, the scale of infrastructure investment is considered the most important of the constraints on the processes of transport planning. Adequate appraisal of such constraints may best be achieved by evaluation more closely aligned to policy objectives.
Resumo:
This research project has developed a novel decision support system using Geographical Information Systems and Multi Criteria Decision Analysis and used it to develop and evaluate energy-from-waste policy options. The system was validated by applying it to the UK administrative areas of Cornwall and Warwickshire. Different strategies have been defined by the size and number of the facilities, as well as the technology chosen. Using sensitivity on the results from the decision support system, it was found that key decision criteria included those affected by cost, energy efficiency, transport impacts and air/dioxin emissions. The conclusions of this work are that distributed small-scale energy-from-waste facilities score most highly overall and that scale is more important than technology design in determining overall policy impact. This project makes its primary contribution to energy-from-waste planning by its development of a Decision Support System that can be used to assist waste disposal authorities to identify preferred energy-from-waste options that have been tailored specifically to the socio-geographic characteristics of their jurisdictional areas. The project also highlights the potential of energy-from-waste policies that are seldom given enough attention to in the UK, namely those of a smaller-scale and distributed nature that often have technology designed specifically to cater for this market.
Resumo:
The loss of habitat and biodiversity worldwide has led to considerable resources being spent for conservation purposes on actions such as the acquisition and management of land, the rehabilitation of degraded habitats, and the purchase of easements from private landowners. Prioritising these actions is challenging due to the complexity of the problem and because there can be multiple actors undertaking conservation actions, often with divergent or partially overlapping objectives. We use a modelling framework to explore this issue with a study involving two agents sequentially purchasing land for conservation. We apply our model to simulated data using distributions taken from real data to simulate the cost of patches and the rarity and co-occurence of species. In our model each agent attempted to implement a conservation network that met its target for the minimum cost using the conservation planning software Marxan. We examine three scenarios where the conservation targets of the agents differ. The first scenario (called NGO-NGO) models the situation where two NGOs are both are targeting different sets of threatened species. The second and third scenarios (called NGO-Gov and Gov-NGO, respectively) represent a case where a government agency attempts to implement a complementary conservation network representing all species, while an NGO is focused on achieving additional protection for the most endangered species. For each of these scenarios we examined three types of interactions between agents: i) acting in isolation where the agents are attempting to achieve their targets solely though their own actions ii) sharing information where each agent is aware of the species representation achieved within the other agent’s conservation network and, iii) pooling resources where agents combine their resources and undertake conservation actions as a single entity. The latter two interactions represent different types of collaborations and in each scenario we determine the cost savings from sharing information or pooling resources. In each case we examined the utility of these interactions from the viewpoint of the combined conservation network resulting from both agents' actions, as well as from each agent’s individual perspective. The costs for each agent to achieve their objectives varied depending on the order in which the agents acted, the type of interaction between agents, and the specific goals of each agent. There were significant cost savings from increased collaboration via sharing information in the NGO-NGO scenario were the agent’s representation goals were mutually exclusive (in terms of specie targeted). In the NGO-Gov and Gov-NGO scenarios, collaboration generated much smaller savings. If the two agents collaborate by pooling resources there are multiple ways the total cost could be shared between both agents. For each scenario we investigate the costs and benefits for all possible cost sharing proportions. We find that there are a range of cost sharing proportions where both agents can benefit in the NGO-NGO scenarios while the NGO-Gov and Gov-NGO scenarios again showed little benefit. Although the model presented here has a range of simplifying assumptions, it demonstrates that the value of collaboration can vary significantly in different situations. In most cases, collaborating would have associated costs and these costs need to be weighed against the potential benefits from collaboration. The model demonstrates a method for determining the range of collaboration costs that would result in collaboration providing an efficient use of scarce conservation resources.
Resumo:
The loss of habitat and biodiversity worldwide has led to considerable resources being spent on conservation interventions. Prioritising these actions is challenging due to the complexity of the problem and because there can be multiple actors undertaking conservation actions, often with divergent or partially overlapping objectives. We explore this issue with a simulation study involving two agents sequentially purchasing land for the conservation of multiple species using three scenarios comprising either divergent or partially overlapping objectives between the agents. The first scenario investigates the situation where both agents are targeting different sets of threatened species. The second and third scenarios represent a case where a government agency attempts to implement a complementary conservation network representing 200 species, while a non-government organisation is focused on achieving additional protection for the ten rarest species. Simulated input data was generated using distributions taken from real data to model the cost of parcels, and the rarity and co-occurrence of species. We investigated three types of collaborative interactions between agents: acting in isolation, sharing information and pooling resources with the third option resulting in the agents combining their resources and effectively acting as a single entity. In each scenario we determine the cost savings when an agent moves from acting in isolation to either sharing information or pooling resources with the other agent. The model demonstrates how the value of collaboration can vary significantly in different situations. In most cases, collaborating would have associated costs and these costs need to be weighed against the potential benefits from collaboration. Our model demonstrates a method for determining the range of costs that would result in collaboration providing an efficient use of scarce conservation resources.
Resumo:
Biomass is projected to account for approximately half of the new energy production required to achieve the 2020 primary energy target in the UK. Combined heat and power (CHP) bioenergy systems are not only a highly efficient method of energy conversion, at smaller-scales a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost incumbent; a high carbon centralised energy system. Unidentified or unmitigated barriers occurring during the project lifecycle may not only negatively impact on the project but could ultimately lead to project failure. The research develops a decision support system (DSS) for small-scale (500 kWe to 10 MWe) biomass combustion CHP project development and risk management in the early stages of a potential project’s lifecycle. By supporting developers in the early stages of project development with financial, scheduling and risk management analysis, the research aims to reduce the barriers identified and streamline decision-making. A fuzzy methodology is also applied throughout the developed DSS to support developers in handling the uncertain or approximate information often held at the early stages of the project lifecycle. The DSS is applied to a case study of a recently failed (2011) small-scale biomass CHP project to demonstrate its applicability and benefits. The application highlights that the proposed development within the case study was not viable. Moreover, further analysis of the possible barriers with the DSS confirmed that some possible modifications to be project could have improved this, such as a possible change of feedstock to a waste or residue, addressing the unnecessary land lease cost or by increasing heat utilisation onsite. This analysis is further supported by a practitioner evaluation survey that confirms the research contribution and objectives are achieved.
Resumo:
Projects exposed to an uncertain environment must be adapted to deal with the effective integration of various planning elements and the optimization of project parameters. Time, cost, and quality are the prime objectives of a project that need to be optimized to fulfill the owner's goal. In an uncertain environment, there exist many other conflicting objectives that may also need to be optimized. These objectives are characterized by varying degrees of conflict. Moreover, an uncertain environment also causes several changes in the project plan throughout its life, demanding that the project plan be totally flexible. Goal programming (GP), a multiple criteria decision making technique, offers a good solution for this project planning problem. There the planning problem is considered from the owner's perspective, which leads to classifying the project up to the activity level. GP is applied separately at each level, and the formulated models are integrated through information flow. The flexibility and adaptability of the models lies in the ease of updating the model parameters at the required level through changing priorities and/or constraints and transmitting the information to other levels. The hierarchical model automatically provides integration among various element of planning. The proposed methodology is applied in this paper to plan a petroleum pipeline construction project, and its effectiveness is demonstrated.
Resumo:
A cross-country pipeline construction project is exposed to an uncertain environment due to its enormous size (physical, manpower requirement and financial value), complexity in design technology and involvement of external factors. These uncertainties can lead to several changes in project scope during the process of project execution. Unless the changes are properly controlled, the time, cost and quality goals of the project may never be achieved. A methodology is proposed for project control through risk analysis, contingency allocation and hierarchical planning models. Risk analysis is carried out through the analytic hierarchy process (AHP) due to the subjective nature of risks in construction projects. The results of risk analysis are used to determine the logical contingency for project control with the application of probability theory. Ultimate project control is carried out by hierarchical planning model which enables decision makers to take vital decisions during the changing environment of the construction period. Goal programming (GP), a multiple criteria decision-making technique, is proposed for model formulation because of its flexibility and priority-base structure. The project is planned hierarchically in three levels—project, work package and activity. GP is applied separately at each level. Decision variables of each model are different planning parameters of the project. In this study, models are formulated from the owner's perspective and its effectiveness in project control is demonstrated.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT One of the current research trends in Enterprise Resource Planning (ERP) involves examining the critical factors for its successful implementation. However, such research is limited to system implementation, not focusing on the flexibility of ERP to respond to changes in business. Therefore, this study explores a combination system, made up of an ERP and informality, intended to provide organisations with efficient and flexible performance simultaneously. In addition, this research analyses the benefits and challenges of using the system. The research was based on socio-technical system (STS) theory which contains two dimensions: 1) a technical dimension which evaluates the performance of the system; and 2) a social dimension which examines the impact of the system on an organisation. A mixed method approach has been followed in this research. The qualitative part aims to understand the constraints of using a single ERP system, and to define a new system corresponding to these problems. To achieve this goal, four Chinese companies operating in different industries were studied, all of which faced challenges in using an ERP system due to complexity and uncertainty in their business environments. The quantitative part contains a discrete-event simulation study that is intended to examine the impact of operational performance when a company implements the hybrid system in a real-life situation. Moreover, this research conducts a further qualitative case study, the better to understand the influence of the system in an organisation. The empirical aspect of the study reveals that an ERP with pre-determined business activities cannot react promptly to unanticipated changes in a business. Incorporating informality into an ERP can react to different situations by using different procedures that are based on the practical knowledge of frontline employees. Furthermore, the simulation study shows that the combination system can achieve a balance between efficiency and flexibility. Unlike existing research, which emphasises a continuous improvement in the IT functions of an enterprise system, this research contributes to providing a definition of a new system in theory, which has mixed performance and contains both the formal practices embedded in an ERP and informal activities based on human knowledge. It supports both cost-efficiency in executing business transactions and flexibility in coping with business uncertainty.This research also indicates risks of using the system, such as using an ERP with limited functions; a high cost for performing informally; and a low system acceptance, owing to a shift in organisational culture. With respect to practical contribution, this research suggests that companies can choose the most suitable enterprise system approach in accordance with their operational strategies. The combination system can be implemented in a company that needs to operate a medium amount of volume and variety. By contrast, the traditional ERP system is better suited in a company that operates a high-level volume market, while an informal system is more suitable for a firm with a requirement for a high level of variety.
Resumo:
Table illustrates estimated College of Medicine technology costs over a 10-year period. Also includes an outline describing funding and needs for the development of a Medical Library collection.
Resumo:
Choosing between Light Rail Transit (LRT) and Bus Rapid Transit (BRT) systems is often controversial and not an easy task for transportation planners who are contemplating the upgrade of their public transportation services. These two transit systems provide comparable services for medium-sized cities from the suburban neighborhood to the Central Business District (CBD) and utilize similar right-of-way (ROW) categories. The research is aimed at developing a method to assist transportation planners and decision makers in determining the most feasible system between LRT and BRT. ^ Cost estimation is a major factor when evaluating a transit system. Typically, LRT is more expensive to build and implement than BRT, but has significantly lower Operating and Maintenance (OM) costs than BRT. This dissertation examines the factors impacting capacity and costs, and develops cost models, which are a capacity-based cost estimate for the LRT and BRT systems. Various ROW categories and alignment configurations of the systems are also considered in the developed cost models. Kikuchi's fleet size model (1985) and cost allocation method are used to develop the cost models to estimate the capacity and costs. ^ The comparison between LRT and BRT are complicated due to many possible transportation planning and operation scenarios. In the end, a user-friendly computer interface integrated with the established capacity-based cost models, the LRT and BRT Cost Estimator (LBCostor), was developed by using Microsoft Visual Basic language to facilitate the process and will guide the users throughout the comparison operations. The cost models and the LBCostor can be used to analyze transit volumes, alignments, ROW configurations, number of stops and stations, headway, size of vehicle, and traffic signal timing at the intersections. The planners can make the necessary changes and adjustments depending on their operating practices. ^
Resumo:
Rapid population increase and booming economic growth have caused a significant escalation in car ownership in many cities, leading to additional or, multiple traffic problems on congested roadways. The increase of automobiles is generating a significant amount of congestion and pollution in many cities. It has become necessary to find a solution to the ever worsening traffic problems in our cities. Building more roadways is nearly impossible due to the limitations of right-of-way in cities. Studies have shown that guideway transit could provide effective transportation and could stimulate land development. The Medium-Capacity Guideway Transit (MCGT) is one of the alternatives to solve this problem. The objective of this research was to better understand the characteristics of MCGT systems, to investigate the existing MCGT systems around the world and determine the main factors behind the planning of successful systems, and to develop a MCGT planning guide. The factors utilized in this study were determined and were analyzed using Excel. A MCGT Planning Guide was developed using Microsoft Visual Basic. ^ A MCGT was defined as a transit system whose capacity can carry up to 20,000 passengers per hour per direction (pphpd). The results shown that Light Rail Transit (LRT) is favored when peak hour demand is less than 13,000 pphpd. Automated People Mover (APM) is favored when the peak hour demand is more than 18,000 pphpd. APM systems could save up to three times the waiting time cost compared to that of the LRT. If comfort and convenience are important, then using an APM does make sense. However, if cost is the critical factor, then LRT will make more sense because it is reasonable service at a reasonable price. If travel time and safety (accident/crush) costs were included in calculating life-cycle “total” costs, the capital cost advantage of LRT disappeared and APM could become very competitive. The results also included a range of cost-performance criteria for MCGT systems that help planners, engineers, and decision-makers to select the most feasible system for their respective areas. ^
Resumo:
This research addresses the problem of cost estimation for product development in engineer-to-order (ETO) operations. An ETO operation starts the product development process with a product specification and ends with delivery of a rather complicated, highly customized product. ETO operations are practiced in various industries such as engineering tooling, factory plants, industrial boilers, pressure vessels, shipbuilding, bridges and buildings. ETO views each product as a delivery item in an industrial project and needs to make an accurate estimation of its development cost at the bidding and/or planning stage before any design or manufacturing activity starts. ^ Many ETO practitioners rely on an ad hoc approach to cost estimation, with use of past projects as reference, adapting them to the new requirements. This process is often carried out on a case-by-case basis and in a non-procedural fashion, thus limiting its applicability to other industry domains and transferability to other estimators. In addition to being time consuming, this approach usually does not lead to an accurate cost estimate, which varies from 30% to 50%. ^ This research proposes a generic cost modeling methodology for application in ETO operations across various industry domains. Using the proposed methodology, a cost estimator will be able to develop a cost estimation model for use in a chosen ETO industry in a more expeditious, systematic and accurate manner. ^ The development of the proposed methodology was carried out by following the meta-methodology as outlined by Thomann. Deploying the methodology, cost estimation models were created in two industry domains (building construction and the steel milling equipment manufacturing). The models are then applied to real cases; the cost estimates are significantly more accurate than the actual estimates, with mean absolute error rate of 17.3%. ^ This research fills an important need of quick and accurate cost estimation across various ETO industries. It differs from existing approaches to the problem in that a methodology is developed for use to quickly customize a cost estimation model for a chosen application domain. In addition to more accurate estimation, the major contributions are in its transferability to other users and applicability to different ETO operations. ^
Resumo:
Construction projects are complex endeavors that require the involvement of different professional disciplines in order to meet various project objectives that are often conflicting. The level of complexity and the multi-objective nature of construction projects lend themselves to collaborative design and construction such as integrated project delivery (IPD), in which relevant disciplines work together during project conception, design and construction. Traditionally, the main objectives of construction projects have been to build in the least amount of time with the lowest cost possible, thus the inherent and well-established relationship between cost and time has been the focus of many studies. The importance of being able to effectively model relationships among multiple objectives in building construction has been emphasized in a wide range of research. In general, the trade-off relationship between time and cost is well understood and there is ample research on the subject. However, despite sustainable building designs, relationships between time and environmental impact, as well as cost and environmental impact, have not been fully investigated. The objectives of this research were mainly to analyze and identify relationships of time, cost, and environmental impact, in terms of CO2 emissions, at different levels of a building: material level, component level, and building level, at the pre-use phase, including manufacturing and construction, and the relationships of life cycle cost and life cycle CO2 emissions at the usage phase. Additionally, this research aimed to develop a robust simulation-based multi-objective decision-support tool, called SimulEICon, which took construction data uncertainty into account, and was capable of incorporating life cycle assessment information to the decision-making process. The findings of this research supported the trade-off relationship between time and cost at different building levels. Moreover, the time and CO2 emissions relationship presented trade-off behavior at the pre-use phase. The results of the relationship between cost and CO2 emissions were interestingly proportional at the pre-use phase. The same pattern continually presented after the construction to the usage phase. Understanding the relationships between those objectives is a key in successfully planning and designing environmentally sustainable construction projects.