948 resultados para CRC for Construction Innovation
Resumo:
A trip was undertaken to look at concerns of Public Works and Main Roads Departments of Queensland. David Paterson and Wayne Ganther from CSIRO travelled to the Sunshine Coast with Alan Carse of Queensland Department of Main Roads and Michael Ball of Queensland Department of Public Works. We were also joined for part of the visits by Ed Bowers of QBuild which is a commercial unit of Public Works responsible for maintenance of Public Works. During the trip we visited a bridge on the David Low Way at Sunrise Beach near Noosa. This bridge was in a serve marine environment with high salt content in the concrete and corrosion of the galvanised guardrails and barriers. Also the foreshore at Coolum was visited and the use of stainless steel was examined. This is discussed in this report. Most problems stemmed from incorrect specification due to lack of awareness of the severity of the environment. The companion report Visit to Schools Report 2002-059-B No 7. covers the visit to four schools north of Caloundra.
Resumo:
Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.
Resumo:
This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.
Resumo:
This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.
Resumo:
The Queensland Department of Public Works (QDPW) and the Queensland Department of Main Roads (QDMR) have identified a need for industry e-contracting guidelines in the short to medium term. Each of these organisations conducts tenders and contracts for over $600 million annually. This report considers the security and legal issues relating to the shift from a paper-based tendering system to an electronic tendering system. The research objectives derived from the industry partners include: • a review of current standards and e-tendering systems; • a summary of legal requirements impacting upon e-tendering; • an analysis of the threats and requirements for any e-tendering system; • the identification of outstanding issues; • an evaluation of possible e-tendering architectures; • recommendations for e-tendering systems.
Resumo:
This is an internal report of the BRITE Project’s activities for 2003. The goal of the Project is to improve the incidence and quality of innovation in the Australian building and construction industry. The primary aim of the year’s work was to complete six case studies of innovation in the Australian building and construction industry. A secondary aim was to prepare for the Project’s innovation survey to be conducted in 2004. The case study program was undertaken to demonstrate the benefits of innovation and show how businesses successfully implement their innovations. The innovation survey is intended to run every 2nd year over the life of the CRC in order to benchmark innovation performance as a tool for public sector policy development and business strategy development. Appendix A contains a list of papers produced by the BRITE Project in 2003. The remainder of this report focuses on the case study program, which was successfully completed during 2003, with six booklets being produced.
Resumo:
This document reports on an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in NSW, Vic and Qld, covering main contractors, trade contractors, consultants, suppliers and clients. One-third of this population was sampled and a response rate of 30% was achieved. The survey investigates innovation determinants in the industry, comprising various aspects of business strategy and business environment.
Resumo:
The BRITE Project undertook six innovation case studies of building and construction projects in 2005. The purpose of the program was to demonstrate the benefits of innovation and highlight the nature of successful implementation strategies. The cases were selected following a public call in industry magazines across Australia, which resulted in approximately 50 nominations. The six selected case studies resulted in three prominent contributions to knowledge
Resumo:
Trying to innovate or wanting to? Making a start is the most difficult step on any journey. Whether trying to innovate for the first time, or seeking improvements on current performance, organisations are confronted with a plethora of options. Innovate ― Now! makes action easier by presenting some of the key considerations for improving innovation performance. This guide has been based on the outcomes of a survey and case studies conducted between 2003 and 2005 in the Australian property and construction industry and therefore contains unique and up-to-date information, examples and suggestions tailored specifically to your industry needs.
Resumo:
Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course
Resumo:
Partnering has been defined in many ways. It can be considered as an individual project mechanism or can be considered as a long term strategy. Alliancing is normally assumed to be a long term business strategy linking together client, contractor and supply chain. Relational contracting goes further than this and brings in the whole philosophy of the value chain and the linking of the interdependent parts within the construction project as a key business objective. This document aims to review existing definitions of these three concepts and present and overview of the current state of-the-art in terms of their use and implementation. The document should be useful for all of those project team members looking to sharpen their understanding of the various concepts and will also provide a platform for debating the current state of the definitions and implementations being used in Main Roads and Public Works Departments.