917 resultados para Buildings -- Additions


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Application of organic materials to soils to enhance N immobilization into microbial biomass, thereby reducing inorganic N concentrations, was studied as a management option to accelerate the reestablishment of the native vegetation on abandoned arable fields on sandy soils the Kiskunsag National Park, Hungary. Sucrose and sawdust were used at three different topographic sites over 4 years. N availability and extractable inorganic N concentrations were significantly reduced in all sites. Soil microbial biomass C and microbial biomass N increased significantly following C additions, but the microbial C to microbial N ratio remained unaffected. It is concluded that the combined application of the rapidly utilized C source (sucrose) promoted N immobilization, whereas the addition of the slowly utilized C source (sawdust) maintained the elevated microbial biomass C and microbial biomass N in the field.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

These notes have been issued on a small scale in 1983 and 1987 and on request at other times. This issue follows two items of news. First, WaIter Colquitt and Luther Welsh found the 'missed' Mersenne prime M110503 and advanced the frontier of complete Mp-testing to 139,267. In so doing, they terminated Slowinski's significant string of four consecutive Mersenne primes. Secondly, a team of five established a non-Mersenne number as the largest known prime. This result terminated the 1952-89 reign of Mersenne primes. All the original Mersenne numbers with p < 258 were factorised some time ago. The Sandia Laboratories team of Davis, Holdridge & Simmons with some little assistance from a CRAY machine cracked M211 in 1983 and M251 in 1984. They contributed their results to the 'Cunningham Project', care of Sam Wagstaff. That project is now moving apace thanks to developments in technology, factorisation and primality testing. New levels of computer power and new computer architectures motivated by the open-ended promise of parallelism are now available. Once again, the suppliers may be offering free buildings with the computer. However, the Sandia '84 CRAY-l implementation of the quadratic-sieve method is now outpowered by the number-field sieve technique. This is deployed on either purpose-built hardware or large syndicates, even distributed world-wide, of collaborating standard processors. New factorisation techniques of both special and general applicability have been defined and deployed. The elliptic-curve method finds large factors with helpful properties while the number-field sieve approach is breaking down composites with over one hundred digits. The material is updated on an occasional basis to follow the latest developments in primality-testing large Mp and factorising smaller Mp; all dates derive from the published literature or referenced private communications. Minor corrections, additions and changes merely advance the issue number after the decimal point. The reader is invited to report any errors and omissions that have escaped the proof-reading, to answer the unresolved questions noted and to suggest additional material associated with this subject.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis is aimed to initiate implementing sustainable building construction in the kingdom of Bahrain, i.e. Building-Integration PhotoVoltaic (BIPV) or Wind Energy (BIWE). It highlights the main constrains that discourage such modern concept in building and construction. Three groups have been questioned using a questionnaire. These are the policy and decision makers, the leading consultants and the contractors. The main constrains of the dissemination of BIVP and BIWE, according to the policy and decision makers, are: lack of knowledge and awareness of the public in sustainable technology, low cost of electricity, low cost of gas and oil and difficulty in applying local environmental taxes. The consultants had attributed the constrains to ignorance of life cycle cost of PV and Wind turbines systems, lack of education and knowledge in sustainable design, political system, shortage of markets importing sustainable technologies and client worries in profitability and pay-back period. The contractors are found to be very enthusiastic and ready to take over any sustainable building project and prefer to have a construction manger to coordinate between the design and contracting team. Design and Build is found the favorable procurement method in Bahrain for conducting BIPV or BIWE projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Two unique large buildings in the Kingdom of Bahrain were selected for make-over to sustainable buildings. These are the Almoayyed Tower (the first sky scraper) and the Bahrain International Circuit, BIC (The best world Formula 1 Circuit). The amount of electricity extracted from using renewable energy resource (solar and wind), integrated to the buildings-has been studied thoroughly. For the first building, the total solar electricity from the PV installed at the roof and the 4 vertical facades was found 3 017 500 kWh annually (3 million kWh), i.e. daily energy of 8219 kWh (enough to Supply electricity for 171 houses, each is rated as 2 kW house-in Europe the standard is 1.2 kW). This means that the annual solar electricity produced will be nearly 3 million kWh. This correspond to annual CO, reduction of 3000 t (assuming each kWh of energy from natural gas lead to emission of 1 kg of CO2). For the second building (BIC) the solar electricity from PV panels installed at the roof top, fixed at tilt angle of 26 degrees facing south, will provide annual solar electricity of is 2.8 x 10(6) kWh. The solar electricity from PV panels installed on the windows (12,000 m(2)) will be 45.3 x 10(6) kWh. This means that the total annual electrical power from PV panels (windows and roofs) will be nearly 12 MW (32 kW per day). The CO2 reduction will be 48,000 t. Under the carbon trading or CDM scheme the revenue (or the reward) would be (sic)480,000 million annually (the reward is (sic)10 per tonnes of CO2). The BIC circuit can have diversified electricity supply, i.e. from solar radiation (PV), from solar heat (CSP) and from wind (wind turbines), assuring its sustainability as well as reducing the CO2 emission.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main objectives of this paper are to: firstly, identify key issues related to sustainable intelligent buildings (environmental, social, economic and technological factors); develop a conceptual model for the selection of the appropriate KPIs; secondly, test critically stakeholder's perceptions and values of selected KPIs intelligent buildings; and thirdly develop a new model for measuring the level of sustainability for sustainable intelligent buildings. This paper uses a consensus-based model (Sustainable Built Environment Tool- SuBETool), which is analysed using the analytical hierarchical process (AHP) for multi-criteria decision-making. The use of the multi-attribute model for priority setting in the sustainability assessment of intelligent buildings is introduced. The paper commences by reviewing the literature on sustainable intelligent buildings research and presents a pilot-study investigating the problems of complexity and subjectivity. This study is based upon a survey perceptions held by selected stakeholders and the value they attribute to selected KPIs. It is argued that the benefit of the new proposed model (SuBETool) is a ‘tool’ for ‘comparative’ rather than an absolute measurement. It has the potential to provide useful lessons from current sustainability assessment methods for strategic future of sustainable intelligent buildings in order to improve a building's performance and to deliver objective outcomes. Findings of this survey enrich the field of intelligent buildings in two ways. Firstly, it gives a detailed insight into the selection of sustainable building indicators, as well as their degree of importance. Secondly, it tesst critically stakeholder's perceptions and values of selected KPIs intelligent buildings. It is concluded that the priority levels for selected criteria is largely dependent on the integrated design team, which includes the client, architects, engineers and facilities managers.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building refurbishment is key to reducing the carbon footprint and improving comfort in the built environment. However, quantifying the real benefit of a facade change, which can bring advantages to owners (value), occupants (comfort) and the society (sustainability), is not a simple task. At a building physics level, the changes in kWh per m2 of heating / cooling load can be readily quantified. However, there are many subtle layers of operation and mainte-nance below these headline figures which determine how sustainable a building is in reality, such as for example quality of life factors. This paper considers the range of approached taken by a fa/e refurbishment consortium to assess refurbishment solutions for multi-storey, multi-occupancy buildings and how to critically evaluate them. Each of the applued tools spans one or more of the three building parameters of people, product and process. 'De-cision making' analytical network process and parametric building analysis tools are described and their potential impact on the building refurbishment process evaluated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper provides a case study of the City of Manchester Stadium based on relevant literatures, based on a comprehensive description of multidisciplinary, cross-sectoral and future-oriented requirements and operations in the design of modern intelligent sports buildings. The successfulness of the City of Manchester Stadium gives constructive experience and knowledge for the building professions including architecture, building structure, building services, construction, and facilities management, etc. In addition, this paper is valuable for developing intelligent sports buildings in China.

Relevância:

20.00% 20.00%

Publicador: