861 resultados para Best Management Practices


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Rathbun Land and Water Alliance and partners have implemented a unique approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This project application proposes to assist landowners to apply BMPs that will reduce sediment and phosphorus delivery from priority land in two targeted sub-watersheds as part of the Rathbun Lake Special Project Features of this project are: (1) use of geographic information system (GIS) analysis to identify priority land that requires BMPs; (2) assistance for landowners to apply BMPs on more than 2,200 acres that will reduce sediment and phosphorus delivery by 3,300 tons and 13,300 pounds per year respectively; (3) evaluation of the benefits from BMP application using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs for priority land to protect water quality.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Watershed Improvement Review Board (WIRB) Grant will be used to enhance an on-going water quality project in Elk River Watershed. A targeted, locally controlled project has been active in the watershed since 2001. Current funding is being received primarily from the EPA-319 program, administrated by IDNR and the Watershed Protection Fund (WSPF) administrated by IDALS-DSC. Substantial funding is also obtained from the yearly county allocation of the Environmental Quality Incentive Program (EQIP) administrated by the USDA-NRCS. The overall objective of the Elk River Water Quality Project is to improve and restore the water quality in this water body by keying in on the potential sources of the identified impairments, and forging a working partnership between the local residents and the conservation agencies and organizations involved in the project. The major potential sources of the known surface water quality problems were identified during the assessment process and pointed to feedlot runoff and sediment delivery from within priority sub-watersheds. WIRB Funds will be used to cost share the application of Best Management Practices, thus reducing the projects dependency on federal funds. Funds will also be used to overcome a project’s limiting factor associated with insufficient technical assistance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project proposes a unique approach to addressing one of the more challenging issues facing efforts to protect water quality in Rathbun Lake; reducing sediment and phosphorus delivery from land on which best management practices (BMPs) will not be applied. This project will construct ten impoundments at key locations in the watershed to reduce the annual delivery of 2,970 tons of sediment and 12,100 pounds of phosphorus to Rathbun Lake. Features of this approach are: (a) impoundments will be constructed at sites below areas with high concentrations of priority land that has the greatest potential to deliver sediment and phosphorus to Rathbun Lake and on which landowners are unable or unwilling to apply BMPs and (b) strategically placed, large impoundments can be a cost effective means of reducing the sediment and phosphorus delivered to Rathbun Lake from priority land on which BMPs will not be applied. This project will significantly enhance the success of efforts underway in the Rathbun Lake Special Project as it addresses a critical water quality protection need that is not being met by current Special Project activities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Clear Lake, Iowa's third largest natural lake, is located in Cerro Gordo County in north-central Iowa. The lake is a premier natural resource and popular recreational destination in north central Iowa, providing more than $40 million dollars annually to the local economy. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full recreational potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. There are over 68 storm water outlet points in the Clear Lake watershed that allow untreated urban runoff to empty directly into Clear Lake. Local governments have been very active in installing storm water Best Management Practices (BMPs) at as many of the outlets that current funding allows. To date, 11 of the 68 sites (16%) have been protected. These improvements have been very effective in reducing contaminants in the storm water runoff, but the remaining outlets still need protection. The first phase of this grant request is for an investigation of 10 storm water outlet sites to determine the most cost effective BMP for each site. The second phase of the grant request is to implement the BMPs deemed most cost effective at 5 of the 10 sites investigated. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Holiday Lake is included in the Walnut Creek watershed, which is listed on the 303(d) list of impaired water bodies. Research indicates that the causes of impairment are sedimentation and habitat alterations. To improve water quality, the goals of this project are to reduce the sediment delivery into Holiday Lake by 50% and assist in educating watershed residents about cost-effective ways to control sediment and nutrient contaminates. The best management practices will be installed to filter the water, reducing sediment and chemical loading into the lake. When all practices are installed, nearly 100% of the lake’s drainage area will be controlled.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Little Bear Creek is a 21.79 mile Class A1 and B (WW2) warm water stream that encompasses approximately 29,202 acres in northern Poweshiek County. The lower 8.4 mile segment is listed as biologically impaired on both the IDNR 2008 303(d) list and 2010 303(d) draft list. A RASCAL assessment and landowner survey was completed through a development grant in 2011, and these assessments indicate that erosion and sediment delivery from cropland, lack of adequate buffers along the stream channel, and streambank conditions contribute significant sediment delivery to the stream, likely resulting in the impairment. An estimated 36,544 tons of sediment are delivered to the stream annually. A total of 11,075 acres (38%) of the watershed are high priority areas or land with sediment delivery rates greater than one. Our goal over 15 years is to install Best Management Practices (BMPs) and increase public education in order to reduce sediment and phosphorus delivery by 25% and decrease priority areas by 15%. More specific objectives for this WIRB project are to 1) Reduce annual sediment delivery by roughly 16.3% or 1,058 tons and associated phosphorus delivery by 1,375 pounds and 2) Develop an information and education program aimed at producers and residents within the headwaters of Grant and Chester townships, which account for 18% of the watershed's priority areas. The SWCD proposes to utilize 50% EQIP funds and 25% WIRB funds toward rural BMPs, and 75% WIRB funds toward urban BMPs received through this application.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Surface runoff and sediment production from different timber yarding practices, some using Best Management Practices (BMPs) recommended for Honduras, were monitored in experimental plots during the rainy seasons of two consecutive years in pine forest highlands of central Honduras. Different timber yarding systems were applied to pseudo-replicated plots during the rainy seasons of 1999 and 2000. In 1999, two treatments were studied: tractor yarding and skyline cable (a recommended BMP). In 2000, four treatments were evaluated: tractor skidding, skyline cable, animal skidding (another recommended BMP), and undisturbed forest (reference). During the rainy seasons of these years, surface runoff volumes and sediment yield were measured at five 1.5m x 10m erosion plots in each treated area. The results showed significant differences between traditional tractor yarding and the recommended skyline cable and animal skidding methods. Tractor yarding produced six to ten times more erosion during the rainy seasons than cable and animal yarding. The improved soil retention of cable and animal yarding was especially important during September when the highest rainfall occurred in this climate.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

L’implantation répandue de nouveaux quartiers résidentiels sur le territoire de la périphérie urbaine est en partie responsable de la baisse du couvert végétal et de l’augmentation des surfaces imperméables à grande échelle. Les villes sont maintenant aux prises avec une augmentation constante de la production de ruissellement qu'elles doivent gérer au moyen d’un vaste réseau d’égouts et de canalisations. Des données sur les impacts de ces modèles de quartier résidentiel nous révèlent que cette forme d’habitat provoque la dégradation des milieux naturels et aquatiques. La présente étude vise à mettre à l’épreuve la stratégie d’aménagement de l’Open space design en comparant l’effet de trois situations d’aménagement d’ensembles résidentiels sur le coefficient de ruissellement pondéré (Cp). Les trois situations étudiées sont 1 : le développement actuel tel que conçu par le promoteur, 2 : un scénario de quartier visant la préservation des cours d’eau existants ainsi qu’une réduction des lots et des surfaces imperméables et 3 : un quartier avec des types d’habitation plus denses. Les coefficients pondérés obtenus sont respectivement de 0,50 pour le quartier actuel, de 0,40 pour le scénario 1 et de 0,34 pour le scénario 2. Au terme de cet exercice, il apparaît, d’une part, que la densification du bâti, la nature des surfaces et l’organisation spatiale peuvent concourir à diminuer la production de ruissellement d’un quartier. Cette étude permet de situer l’importance de la gestion du ruissellement dans la planification et l’aménagement du territoire.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Há tempo busca-se um aperfeiçoamento do aparelho estatal no Brasil e, ao longo dos anos. os governos que se sucedem no poder vêm buscando alternativas para melhorar a eficiência do Estado. Mais recentemente, no Governo do Presidente Luiz Inácio Lula da Silva, foi instituído o Programa Nacional de Gestão Pública e Desburocratização (Gespública), que incentiva órgãos públicos a implementarem sistemas de gestão, participando de um processo de avaliação com premiações para as melhores práticas gerenciais voltadas à qualidade dos serviços aos cidadãos. No âmbito da Marinha do Brasil o Programa foi adaptado às peculiaridade da Força e nasceu, assim, o Programa Netuno que visa à institucionalização de boas práticas de gestão, permitindo que as organizações da Marinha do Brasil busquem a melhoria contínua dos processos inerentes a suas atividades. Uma das ferramentas que se pretende incorporar ao Programa é o Balanced Scorecard, geralmente utilizado na gestão estratégica e na avaliação do desempenho de organizações. Portanto, com a finalidade de contribuir para o aprimoramento da eficiência da gestão das Organizações Militares da Marinha do Brasil, este trabalho tem como objetivo identificar as vantagens, desvantagens e dificuldades da implementação do Modelo de Gestão Balanced Scorecard (BSC), tomando como base as experiências bem sucedidas de outras organizações da iniciativa privada e pública, bem como do Exército Brasileiro, que já implementaram e utilizam o modelo.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

No atual cenário empresarial, em consequência da velocidade das mudanças e do dinamismo das informações no mundo contemporâneo, vem sendo amplamente discutido como as organizações podem responder de forma célere a esses movimentos e, assim, construir uma vantagem competitiva para assegurar a sustentabilidade dos negócios. Não obstante o caráter social e não-lucrativo das empresas do Terceiro Setor, esse segmento também caminha na busca de práticas de gestão baseadas em resultados. Nessa perspectiva, pensando em como a gestão por projetos pode promover mudanças positivas pela potencialização de ações e recursos, este trabalho tem como objetivo explorar, por meio de um estudo de caso, os fatores críticos de sucesso dos projetos em uma empresa do Terceiro Setor do ramo da saúde, especializada em oncologia, em um horizonte temporal de vinte e dois (22) meses. Foram utilizadas múltiplas fontes de evidências: análise da documentação histórica de quatro (04) projetos de média e alta complexidades, observação e acompanhamento de cinco (05) profissionais na fase de execução de um projeto de alta complexidade, verificação dos resultados da pesquisa qualitativa de maturidade em projetos e investigação do portfólio de projetos, através do relato de vinte (20) profissionais de saúde e administrativos. Na área acadêmica, diversos estudos tiveram como objeto os fatores críticos de sucesso dos projetos. No entanto, existe a necessidade de exploração do tema no ramo da saúde.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The eutrophication (cultural or anthropogenic) is induced by man and can have different origins, such as domestic sewage, industrial and agricultural activities, including the effluent still breeding systems of aquatic organisms. The expansion of aquaculture, with production of biomass and increase of nutrients in water may cause acceleration of productivity of algae, changing the ecology of aquatic systems. In addition, these waste water may present a risk to health through the transfer of pathogens from manure, plant residues, composted material, among others that are major sources of organic waste in some farming systems. Depending on the trophic level of fish ponds, which are dynamic environments, different planktonic species with short reproductive cycle and adapted to the changes contained in these systems can appear in high abundance. Water quality in the systems for raising fish is related to several factors, such as water source, management (liming, fertilizing, cleaning), cultivated species and quantity and composition of exogenous food. In order to minimize environmental impacts, there are techniques to improve the quality of water in fish farming systems and thus satisfactory answers can be obtained through the application of management practices. This paper aims to review the subject that deals with changes in water quality resulting from the activity of freshwater fish culture in Brazil. Search also recommend techniques of good management practices to minimize the impact generated by the activity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Current challenges of humanity require a new paradigm for animal production, and invest time and attention to the development of new production techniques that take into account the principles of sustainability and animal welfare science. To do this, we must be committed to promoting animal welfare and health, ensure environmental sustainability, consumer satisfaction and profitability for producers. To change our relationship with animals there is no need for changes in market conditions or large investments, it is enough to know better the needs of the animals we raise, the management system adapted to its characteristics. Even in the most favorable management conditions, on farms that have technological resources and trained personnel, there is much to change, especially in the daily management of the animals. Some of the risks more evident in the traditional systems of beef production are: problems during parturition, morbidity and mortality of calves, lack of shade in the pastures, improper handling of animals, risk of injury, inadequate infrastructure, poor management practices during routine processing (marking, castration, vaccination, dehorning), poor welfare during loading, transport, unloading and slaughter. To remedy this, you can adopt good management practices, which have been shown to reduce risk and improve the welfare of cattle in different stages of the production chain. The objective of this review is to show some of the risks that reduce the welfare of cattle and examples of how the adoption of best management practices impact on improving the productivity of these production systems. Finally, some indicators for assessing welfare in production systems are shown.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The information tecnology (IT) has, over the years, gaining prominence as a strategic element and competitive edge in organizations, public or private. In the judiciary, with the implementation of actions related to Judiciário Eletrônico, information technology (IT), definitely earns its status as a strategic element and significantly raises the level of dependence of the organs of their services and products. Increasingly, the quality of services provided by IT has direct impact on the quality of services provided by the agency as a whole. The Ministério Público do Estado do Rio Grande do Norte (MPRN) deployments shares of Electronic Government, along with an administrative reform, beyond these issues raised, caused a large increase in institutional demand for products and services provided by the Diretoria de Tecnologia da Informação (DTI), a sector responsible for the provision of IT services. Taking as starting point strategic goal set by MPRN to reach a 85% level of user satisfaction in four years, we seek to propose a method that assists in meeting the goal, respecting the capacity constraints of the IT sector. To achieve the proposed objective, we conducted a work in two distinct and complementary stages. In the first step we conducted a case study in MPRN, in which, through an internal and external diagnosis of DTI, accomplished by an action of internal consulting and one research of the user satisfaction, we seek to identify opportunities of change seeking to raise the quality perceived of the services provided by the DTI , from the viewpoint of their customers. The situational report, drawn from the data collected, fostered changes in DTI, which were then evaluated with the managers. In the second stage, with the results obtained in the initial process, empirical observation, evaluation of side projects of quality improvement in the sector, and validation with the managers, of the initial model, we developed an improved process, gazing beyond the identification of gaps in service a strategy for the selection of best management practices and deployment of these, in a incremental and adaptive way, allowing the application of the process in organs with little staff allocated to the provision of information technology services

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work aimed to evaluate some aspects of construction and operation of full-scale best management practices and their effects on infiltration loading rate. Two systems were studied: i) filter-swale-trench (FST) and ii) infiltration well (IW). In these units, field essays and full-scale measurements were made in order to assess the soil permeability. Further, the fine particles transportation and the geotextile blanket permeability were determined before and after operation. The results pointed out that there were soil transportation to inside the FST and IW systems, despite of the installed protections, and that these material were responsible for diminishing the geotextile (reduction from 30 to 90% for FST and 40 to 70% for IW) and the full-scale infiltration loading rates (varying from 4,7 x 10-6 to 10-5 m.s-1).