915 resultados para BIM Manuals


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The emergence of Twenty20 cricket at the elite level has been marketed on the excitement of the big hitter, where it seems that winning is a result of the muscular batter hitting boundaries at will. This version of the game has captured the imagination of many young players who all want to score runs with “big hits”. However, in junior cricket, boundary hitting is often more difficult due to size limitations of children and games played on outfields where the ball does not travel quickly. As a result, winning is often achieved via a less spectacular route – by scoring more singles than your opponents. However, most standard coaching texts only describe how to play boundary scoring shots (e.g. the drives, pulls, cuts and sweeps) and defensive shots to protect the wicket. Learning to bat appears to have been reduced to extremes of force production, i.e. maximal force production to hit boundaries or minimal force production to stop the ball from hitting the wicket. Initially, this is not a problem because the typical innings of a young player (<12 years) would be based on the concept of “block” or “bash” – they “block” the good balls and “bash” the short balls. This approach works because there are many opportunities to hit boundaries off the numerous inaccurate deliveries of novice bowlers. Most runs are scored behind the wicket by using the pace of the bowler’s delivery to re-direct the ball, because the intrinsic dynamics (i.e. lack of strength) of most children means that they can only create sufficient power by playing shots where the whole body can contribute to force production. This method works well until the novice player comes up against more accurate bowling when they find they have no way of scoring runs. Once batters begin to face “good” bowlers, batters have to learn to score runs via singles. In cricket coaching manuals (e.g. ECB, n.d), running between the wickets is treated as a separate task to batting, and the “basics” of running, such as how to “back- up”, carry the bat, calling and turning and sliding the bat into the crease are “drilled” into players. This task decomposition strategy focussing on techniques is a common approach to skill acquisition in many highly traditional sports, typified in cricket by activities where players hit balls off tees and receive “throw-downs” from coaches. However, the relative usefulness of these approaches in the acquisition of sporting skills is increasingly being questioned (Pinder, Renshaw & Davids, 2009). We will discuss why this is the case in the next section.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Imperial roads. The Italian colonial routes and their relationship with 1920-40 manuals

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Once melanoma metastasizes, no effective treatment modalities prolong survival in most patients. This notorious refractoriness to therapy challenges investigators to identify agents that overcome melanoma resistance to apoptosis. Whereas many survival pathways contribute to the death-defying phenotype in melanoma, a defect in apoptotic machinery previously highlighted inactivation of Apaf-1, an apoptosome component engaged after mitochondrial damage. During studies involving Notch signaling in melanoma, we observed a gamma-secretase tripeptide inhibitor (GSI; z-Leu-Leu-Nle-CHO), selected from a group of compounds originally used in Alzheimer's disease, induced apoptosis in nine of nine melanoma lines. GSI only induced G2-M growth arrest (but not killing) in five of five normal melanocyte cultures tested. Effective killing of melanoma cells by GSI involved new protein synthesis and a mitochondrial-based pathway mediated by up-regulation of BH3-only members (Bim and NOXA). p53 activation was not necessary for up-regulation of NOXA in melanoma cells. Blocking GSI-induced NOXA using an antisense (but not control) oligonucleotide significantly reduced the apoptotic response. GSI also killed melanoma cell lines with low Apaf-1 levels. We conclude that GSI is highly effective in killing melanoma cells while sparing normal melanocytes. Direct enhancement of BH3-only proteins executes an apoptotic program overcoming resistance of this lethal tumor. Identification of a p53-independent apoptotic pathway in melanoma cells, including cells with low Apaf-1, bypasses an impediment to current cytotoxic therapy and provides new targets for future therapeutic trials involving chemoresistant tumors.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Building Information Modeling (BIM) is a modern approach to the design, documentation, delivery, and life cycle management of buildings through the use of project information databases coupled with object-based parametric modeling. BIM has the potential to revolutionize the Architecture, Engineering and Construction (AEC) industry in terms of the positive impact it may have on information flows, working relationships between project participants from different disciplines and the resulting benefits it may achieve through improvements to conventional methods. This chapter reviews the development of BIM, the extent to which BIM has been implemented in Australia, and the factors which have affected the up-take of BIM. More specifically, the objectives of this chapter are to investigate the adoption of BIM in the Australian AEC industry and factors that contribute towards the uptake (or non uptake) of BIM. These objectives are met by a review of the related literature in the first instance, followed by the presentation of the results of a 2007 postal questionnaire survey and telephone interviews of a random sample of professionals in the Australian AEC industry. The responses suggest that less than 25 percent of the sample had been involved in BIM – rather less than might be expected from reading the literature. Also, of those who have been involved with BIM, there has been very little interdisciplinary collaboration. The main barriers impeding the implementation of BIM widely across the Australian AEC industry are also identified. These were found to be primarily a lack of BIM expertise, lack of awareness and resistance to change. The benefits experienced as a result of using BIM are also discussed. These include improved design consistency, better coordination, cost savings, higher quality work, greater productivity and increased speed of delivery. In terms of conclusion, some suggestions are made concerning the underlying practical reasons for the slow up-take of BIM and the successes for those early adopters. Prospects for future improvement are discussed and proposals are also made for a large scale worldwide comparative study covering industry-wide participants

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report provides an overview of findings of qualitative research comprising three case studies undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. These case studies (see Parts 2, 3 and 4 of this suite of reports) were undertaken to illustrate the nature of past R&D investments in Australia. This was done to complement: (i) the audit and analysis of past R&D investment undertaken by Thomas Barlow (2011); and (ii) the Construction 2030 roadmap being developed by Swinburne University of Technology and Professor Göran Roos from VTT Technical Research Centre of Finland. These documents will be the basis for the final phase of the present project - developing policy guidelines for future R&D investment in the Australian built environment. Refer also Parts 1, 2 and 3 for detail findings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A building information model (BIM) is an electronic repository of structured, three-dimensional data that captures both the physical and dynamic functional characteristics of a facility. In addition to its more traditional function as a tool to aid design and construction, a BIM can be used throughout the life cycle of a facility, functioning as a living database that places resources contained within the building in their spatial and temporal context. Through its comprehension of spatial relationships, a BIM can meaningfully represent and integrate previously isolated control and management systems and processes, and thereby provide a more intuitive interface to users. By placing processes in a spatial context, decision-making can be improved, with positive flow-on effects for security and efficiency. In this article, we systematically analyse the authorization requirements involved in the use of BIMs. We introduce the concept of using a BIM as a graphical tool to support spatial access control configuration and management (including physical access control). We also consider authorization requirements for regulating access to the structured data that exists within a BIM as well as to external systems and data repositories that can be accessed via the BIM interface. With a view to addressing these requirements we present a survey of relevant spatiotemporal access control models, focusing on features applicable to BIMs and highlighting capability gaps. Finally, we present a conceptual authorization framework that utilizes BIMs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The growing awareness of sustainability issues around the world has put extensive pressure on the construction industry to improve its sustainable practice. Sustainability principles need to be applied to not just during design and construction phase but the entire life cycle of a construction project. Compared to sustainability endeavours on earlier development phases, the pace to implement sustainability agenda during the operation and maintenance phase has not been as fast during past practices of facilities management (FM). Literature study suggests that sustainable practices in FM activities can bring substantial benefits such as reducing energy consumptions and waste, while increasing productivity, financial return and standing in the community. It also suggests several barriers which inhibit the implementation of sustainability in FM practices, including the lack of knowledge, discrepancy between capability and skills, and unwillingness of the FM personnel and organizations to adapt to new routines in order to implement sustainability in their business. The capabilities of FM personnel and organizations were regarded as the key enablers in managing sustainability knowledge. In a sustainable development context, capabilities are vital to the fostering of competency in an organization to innovate in a more sustainable way and support the agenda in an organization. Additionally, research which focused on people’s capabilities and skills is still lagging behind the efforts to develop guidelines, technical manuals and knowledge portals. Therefore, it is beneficial to explore the issues of capabilities in dealing with the implementation of sustainable practices in FM. This paper introduces a research project which is aimed at establishing a knowledge capabilities framework for promoting sustainability measures in FM practices. It will explore and highlight challenges to integrate sustainability as well as the personnel and organizational capabilities that are vital in dealing with knowledge issues in implementing sustainability agenda in FM practices. The expected outcome of this research has the potential to further sustainability endeavours in FM practices, while providing a useful source of knowledge to the FM personnel and organizations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Building Information Modelling (BIM) appears to be the next evolutionary link in project delivery within the AEC (Architecture, Engineering and Construction) Industry. There have been several surveys of implementation at the local level but to date little is known of the international context. This paper is a preliminary report of a large scale electronic survey of the implementation of BIM and the impact on AEC project delivery and project stakeholders in Australia and internationally. National and regional patterns of BIM usage will be identified. These patterns will include disciplinary users, project lifecycle stages, technology integration–including software compatibility—and organisational issues such as human resources and interoperability. Also considered is the current status of the inclusion of BIM within tertiary level curricula and potential for the creation of a new discipline.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

What is the contribution of innovation brokers in leveraging research and development (R&D) investment to enhance industry-wide capabilities? The case of the Australian Cooperative Research Centre for Construction Innovation (CRC CI) is considered in the context of motivating supply chain firms to improve their organizational capabilities in order to acquire, assimilate, transfer and exploit R&D outcomes to their advantage, and to create broader industry and national benefits. A previous audit and analysis has shown an increase in business R&D investment since 2001. The role of the CRC CI in contributing to growth in the absorptive capacity of the Australian construction industry as a whole is illustrated through two programmes: digital modelling building information modelling (BIM) and construction site safety. Numerous positive outcomes in productivity, quality, improved safety and competitiveness were achieved between 2001 and 2009.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A building information model (BIM) provides a rich representation of a building's design. However, there are many challenges in getting construction-specific information from a BIM, limiting the usability of BIM for construction and other downstream processes. This paper describes a novel approach that utilizes ontology-based feature modeling, automatic feature extraction based on ifcXML, and query processing to extract information relevant to construction practitioners from a given BIM. The feature ontology generically represents construction-specific information that is useful for a broad range of construction management functions. The software prototype uses the ontology to transform the designer-focused BIM into a construction-specific feature-based model (FBM). The formal query methods operate on the FBM to further help construction users to quickly extract the necessary information from a BIM. Our tests demonstrate that this approach provides a richer representation of construction-specific information compared to existing BIM tools.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The design and construction community has shown increasing interest in adopting building information models (BIMs). The richness of information provided by BIMs has the potential to streamline the design and construction processes by enabling enhanced communication, coordination, automation and analysis. However, there are many challenges in extracting construction-specific information out of BIMs. In most cases, construction practitioners have to manually identify the required information, which is inefficient and prone to error, particularly for complex, large-scale projects. This paper describes the process and methods we have formalized to partially automate the extraction and querying of construction-specific information from a BIM. We describe methods for analyzing a BIM to query for spatial information that is relevant for construction practitioners, and that is typically represented implicitly in a BIM. Our approach integrates ifcXML data and other spatial data to develop a richer model for construction users. We employ custom 2D topological XQuery predicates to answer a variety of spatial queries. The validation results demonstrate that this approach provides a richer representation of construction-specific information compared to existing BIM tools.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In recent years, there has been a growing interest from the design and construction community to adopt Building Information Models (BIM). BIM provides semantically-rich information models that explicitly represent both 3D geometric information (e.g., component dimensions), along with non-geometric properties (e.g., material properties). While the richness of design information offered by BIM is evident, there are still tremendous challenges in getting construction-specific information out of BIM, limiting the usability of these models for construction. In this paper, we describe our approach for extracting construction-specific design conditions from a BIM model based on user-defined queries. This approach leverages an ontology of features we are developing to formalize the design conditions that affect construction. Our current implementation analyzes the component geometry and topological relationships between components in a BIM model represented using the Industry Foundation Classes (IFC) to identify construction features. We describe the reasoning process implemented to extract these construction features, and provide a critique of the IFC’s to support the querying process. We use examples from two case studies to illustrate the construction features, the querying process, and the challenges involved in deriving construction features from an IFC model.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

An evolution in the use of digital modelling has occurred in the Queensland Department of Public Works Division of Project Services over the last 20 years from: the initial implementation of computer aided design and documentation (CADD); to experimentation with building information modelling (BIM); to embedding integrated practice (IP); to current steps towards integrated project delivery (IPD) including the active involvement of consultants and contractors in the design/delivery process. This case study is one of three undertaken through the Australian Sustainable Built Environment National Research Centre investigating past R&D investment. The intent of these cases is to inform the development of policy guidelines for future investment in the construction industry in Australia. This research is informing the activities of CIB Task Group 85 R&D Investment and Impact. The uptake of digital modelling by Project Services has been approached through an incremental learning approach. This has been driven by a strong and clear vision with a focus on developing more efficient delivery mechanisms through the use of new technology coupled with process change. Findings reveal an organisational focus on several areas including: (i) strategic decision making including the empowerment of innovation leaders and champions; (ii) the acquisition and exploitation of knowledge; (iii) product and process development (with a focus on efficiency and productivity); (iv) organisational learning; (v) maximising the use of technology; and (vi) supply chain integration. Key elements of this approach include pilot projects, researcher engagement, industry partnerships and leadership.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Social media tools are often the result of innovations in Information Technology and developed by IT professionals and innovators. Nevertheless, IT professionals, many of whom are responsible for designing and building social media technologies, have not been investigated on how they themselves use or experience social media for professional purposes. This study will use Information Grounds Theory (Pettigrew, 1998) as a framework to study IT professionals’ experience in using social media for professional purposes. Information grounds facilitates the opportunistic discovery of information within social settings created temporarily at a place where people gather for a specific purpose (e.g., doctors’ waiting rooms, office tea rooms etc.), but the social atmosphere stimulates spontaneous sharing of information (Pettigrew, 1999). This study proposes that social media has the qualities that make it a rich information grounds; people participate from separate “places” in cyberspace in a synchronous manner in real-time, making it almost as dynamic and unplanned as physical information grounds. There is limited research on how social media platforms are perceived as a “place,” (a place to go to, a place to gather, or a place to be seen in) that is comparable to physical spaces. There is also no empirical study on how IT professionals use or “experience” social media. The data for this study is being collected through a study of IT professionals who currently use Twitter. A digital ethnography approach is being taken wherein the researcher uses online observations and “follows” the participants online and observes their behaviours and interactions on social media. Next, a sub-set of participants will be interviewed on their experiences with and within social media and how social media compares with traditional methods of information grounds, information communication, and collaborative environments. An Evolved Grounded Theory (Glaser, 1992) approach will be used to analyse tweets data and interviews and to map the findings against the Information Ground Theory. Findings from this study will provide foundational understanding of IT professionals’ experiences within social media, and can help both professionals and researchers understand this fast-evolving method of communications.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Epstein Barr virus (EBV) is a common γ-herpes virus, infecting approximately 90% of the world‟s population. It is also one of the first known viruses known to be oncogenic, and is associated with a number of tumour types, primarily lymphomas. MicroRNAs (miRNAs) are post-transcriptional regulators of gene expression and many human miRNAs have been associated with the development of malignancies including cancer. EBV was the first human virus identified to express miRNAs and encodes more than 40 miRNAs within its genome. Yet, an understanding of the targets of EBV-miRNAs, and thereby the function of them in pathogenesis remains sadly limited. This study identifies a potential novel target of EBV-miRNAs, MECP2 and characterises the miRNA:mRNA interactions between two previously identified novel targets; Bim and EBF1. In particular, this study focuses upon the interaction between EBF1 and the EBV-miRNA BART11-5p, demonstrating a 151bp region of the EBF1 3‟UTR that is capable of mediating the silencing of luciferase expression by BART11-5p but is not capable of silencing a full length EBF1-3‟UTR luciferase construct. This study provides evidence that EBF1 may be a target of one or more EBV-miRNAs.