881 resultados para Aggregate production planning


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Definitions and measures of supply chain integration (SCI) are diverse. More empirical research, with clear definition and appropriate measures are needed. The purpose of this article is to identify dimensions and variables for SCI and develop an integrated framework to facilitate this. A literature review of the relevant academic papers in international journals in Logistics, Supply Chain Management and Operations Management for the period 1995-2009 has been undertaken. This study reveals that information integration, coordination and resource sharing and organisational relationship linkage are three major dimensions for SCI. The proposed framework helps integrate both upstream suppliers and downstream customers with the focal organisation. It also allows measuring SCI using both qualitative and quantitative approach. This study encourages researchers and practitioners to identify dimensions and variables for SCI and analyses how it affects the overall supply chain (SC) performance in terms of efficiency and responsiveness. Although there is extensive research in the area of SCI, a comprehensive and integrated approach is missing. This study bridges the gap by developing a framework for measuring SCI, which enables any organisation to identify critical success factors for integrating their SC, measures the degree of integration qualitatively and quantitatively and suggest improvement measures. © 2013 Copyright Taylor and Francis Group, LLC.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper identifies inter- and intra-organisational management resources that determine the level of execution of inter-firm alliance supply chain management (SCM). By drawing on network and resource-based view theories, a conceptual model proposes the effects of SCM resources and capabilities as influencing factors on SCM execution. The model was tested using survey data from studies conducted in two European supply chain environments. Variance-based structural equation modelling confirmed the hypothesised hierarchical order of three proposed antecedents: internal SCM resources affect joint SCM resources, which in turn influence collaborative SCM-related processes and finally SCM execution. An importance-performance analysis for both settings shows that providing and investing in internal SCM resources should be a priority when aiming to increase SCM execution. The theoretical contribution of this paper lies in confirming that the improvement of SCM execution follows a clear pathway featuring internal supply chain resources as one of the main drivers. The practical implications of this research include the development of a prioritisation list of measures that elevate SCM execution in the two country settings. © 2014 © 2014 Taylor & Francis.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Decision making and technical decision analysis demand computer-aided techniques and therefore more and more support by formal techniques. In recent years fuzzy decision analysis and related techniques gained importance as an efficient method for planning and optimization applications in fields like production planning, financial and economical modeling and forecasting or classification. It is also known, that the hierarchical modeling of the situation is one of the most popular modeling method. It is shown, how to use the fuzzy hierarchical model in complex with other methods of Multiple Criteria Decision Making. We propose a novel approach to overcome the inherent limitations of Hierarchical Methods by exploiting multiple criteria decision making.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The manufacturing industry faces many challenges such as reducing time-to-market and cutting costs. In order to meet these increasing demands, effective methods are need to support the early product development stages by bridging the gap of communicating early design ideas and the evaluation of manufacturing performance. This paper introduces methods of linking design and manufacturing domains using disparate technologies. The combined technologies include knowledge management supporting for product lifecycle management systems, Enterprise Resource Planning (ERP) systems, aggregate process planning systems, workflow management and data exchange formats. A case study has been used to demonstrate the use of these technologies, illustrated by adding manufacturing knowledge to generate alternative early process plan which are in turn used by an ERP system to obtain and optimise a rough-cut capacity plan. Copyright © 2010 Inderscience Enterprises Ltd.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper explores and rationalises the process of servitization adoption across manufacturing firms. A Delphi research methodology has been applied to capture evidence and opinion from 33 senior executives, in 28 different sized organisations, from a cross section of British industry. The findings focus on five areas: (1) servitization and advanced services, (2) transformation: stimulus, drivers and organisational change, (3) impact on the customer and manufacturer, (4) enablers and inhibitors and (5) potential for business and the economy. Six findings are presented and collectively these contribute to our understanding of the broader change management processes that transform manufacturers to compete through advanced services.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This research is motivated by the need for considering lot sizing while accepting customer orders in a make-to-order (MTO) environment, in which each customer order must be delivered by its due date. Job shop is the typical operation model used in an MTO operation, where the production planner must make three concurrent decisions; they are order selection, lot size, and job schedule. These decisions are usually treated separately in the literature and are mostly led to heuristic solutions. The first phase of the study is focused on a formal definition of the problem. Mathematical programming techniques are applied to modeling this problem in terms of its objective, decision variables, and constraints. A commercial solver, CPLEX is applied to solve the resulting mixed-integer linear programming model with small instances to validate the mathematical formulation. The computational result shows it is not practical for solving problems of industrial size, using a commercial solver. The second phase of this study is focused on development of an effective solution approach to this problem of large scale. The proposed solution approach is an iterative process involving three sequential decision steps of order selection, lot sizing, and lot scheduling. A range of simple sequencing rules are identified for each of the three subproblems. Using computer simulation as the tool, an experiment is designed to evaluate their performance against a set of system parameters. For order selection, the proposed weighted most profit rule performs the best. The shifting bottleneck and the earliest operation finish time both are the best scheduling rules. For lot sizing, the proposed minimum cost increase heuristic, based on the Dixon-Silver method performs the best, when the demand-to-capacity ratio at the bottleneck machine is high. The proposed minimum cost heuristic, based on the Wagner-Whitin algorithm is the best lot-sizing heuristic for shops of a low demand-to-capacity ratio. The proposed heuristic is applied to an industrial case to further evaluate its performance. The result shows it can improve an average of total profit by 16.62%. This research contributes to the production planning research community with a complete mathematical definition of the problem and an effective solution approach to solving the problem of industry scale.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The design of reverse logistics networks has now emerged as a major issue for manufacturers, not only in developed countries where legislation and societal pressures are strong, but also in developing countries where the adoption of reverse logistics practices may offer a competitive advantage. This paper presents a new model for partner selection for reverse logistic centres in green supply chains. The model offers three advantages. Firstly, it enables economic, environment, and social factors to be considered simultaneously. Secondly, by integrating fuzzy set theory and artificial immune optimization technology, it enables both quantitative and qualitative criteria to be considered simultaneously throughout the whole decision-making process. Thirdly, it extends the flat criteria structure for partner selection evaluation for reverse logistics centres to the more suitable hierarchy structure. The applicability of the model is demonstrated by means of an empirical application based on data from a Chinese electronic equipment and instruments manufacturing company.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Increased complexity in large design and manufacturing organisations requires improvements at the operations management (OM)–applied service (AS) interface areas to improve project effectiveness. The aim of this paper is explore the role of Lean in improving the longitudinal efficiency of the OM–AS interface within a large aerospace organisation using Lean principles and boundary spanning theory. The methodology was an exploratory longitudinal case approach including exploratory interviews (n = 21), focus groups (n = 2), facilitated action-research workshops (n = 2) and two trials or experiments using longitudinal data involving both OM and AS personnel working at the interface. The findings draw upon Lean principles and boundary spanning theory to guide and interpret the findings. It was found that misinterpretation, and forced implementation, of OM-based Lean terminology and practice in the OM–AS interface space led to delays and misplaced resources. Rather both OM and AS staff were challenged to develop a cross boundary understanding of Lean-based boundary (knowledge) objects in interpreting OM requests. The longitudinal findings from the experiments showed that the development of Lean Performance measurements and lean Value Stream constructs was more successful when these Lean constructs were treated as boundary (knowledge) objects requiring transformation over time to orchestrate improved effectiveness and in leading to consistent terminology and understanding between the OM–AS boundary spanning team.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Empirical validity of the claim that overhead costs are driven not by production volume but by transactions resulting from production complexity is examined using data from 32 manufacturing plants from the electronics, machinery, and automobile components industries. Transactions are measured using number of engineering change orders, number of purchasing and production planning personnel, shop- floor area per part, and number of quality control and improvement personnel. Results indicate a strong positive relation between manufacturing overhead costs and both manufacturing transactions and production volume. Most of the variation in overhead costs, however, is explained by measures of manufacturing transactions, not volume.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Atualmente o sector industrial está inserido num mercado cada vez mais competitivo, onde é exigida uma estratégia empresarial que possa garantir a sua permanência e destaque no atual mercado. Por esta razão, um planeamento e controlo da produção adequado torna-se essencial para o bom funcionamento de uma empresa. Através destes sistemas é possível atuar de forma positiva na produção, rentabilizando-se o sector produtivo da empresa que contribui para o aumento da qualidade de serviço e também para o crescimento económico da empresa. Com um planeamento da produção adequado, uma organização dispondo das mesmas capacidades, é capaz de produzir quantidades iguais num menor intervalo de tempo. Por outro lado, um controlo da produção preciso é imprescindível para o fornecimento da informação correta quando necessária. No sentido de otimização, uma empresa apresentou algumas sugestões de melhoria a nível do planeamento e controlo da produção. Este trabalho surge assim com o intuito de dar resposta às propostas apresentadas. Para tal, no desenvolvimento desta dissertação, criou-se uma ferramenta dotada de dois algoritmos e um sistema de controlo para aquisição de informação de forma automatizada. Em suma, o sistema proposto apresenta a capacidade de construção de boas soluções para o planeamento, conciliada com um sistema de aquisição de dados bastante prático e e caz. Mantendo sempre a exibilidade necessária para um sistema deste género.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Supply chains have become an important focus for competitive advantage. The performance of a company increasingly depends on its ability to maintain effective and efficient relationships with its suppliers and customers. The extended enterprise (i.e. composed of several partners) needs to be dynamically formed in order to be agile and adaptable. According to the Digital Manufacturing paradigm, companies have to be able to quickly share and disseminate information regarding planning, designing and manufacturing of products. Additionally, they must be responsive to all technical and business determinants, as well as be assessed and certified for guaranteed performance. The current research intends to present a solution for the dynamic composition of the extended enterprise, formed to take advantage of market opportunities quickly and efficiently. A construction model was developed. This construction model consists of: information model, protocol model and process model. The information model has been defined based on the concepts of Supply Chain Operations Reference model (SCOR®). In this model is defined information for negotiating the participation of candidate companies in the dynamic establishment of a network for responding to a given demand for developing and manufacturing products, in seven steps as follows: request for information; request for qualification; alignment of strategy; request for proposal; request for quotation; compatibility of process; and compatibility of system. The protocol model has been elaborated and inspired in the OSI, this model provides a framework for linking customers and suppliers, indicates a sequence to be followed, in order to selecte companies to become suppliers. The process model has been implemented by means of process modeling according to the BPMN standard and, in turn, implemented as a web-based application that runs the process through its several steps, which uses forms to gather data. An application example in the context of the oil and gas industry is used for demonstrating the solution concept.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Atualmente, uma organização industrial com vista a singrar no mercado global é fortemente influenciada por pressões que visam o aumento da eficiência global e consequente redução de custos operacionais. O desafio para as mesmas passa, portanto, por expurgar do produto tudo aquilo que não lhe acrescenta valor percetível pelo cliente e por maximizar a utilização dos vários recursos industriais instalados. No seguimento deste desafio, surge o Problema de Planeamento e Programação da Produção, ao qual é necessário dar uma resposta eficiente. Este projeto tem como objetivo estudar o problema da Programação da Produção numa indústria de pavimentos e revestimentos cerâmicos, desenvolvendo uma heurística construtiva capaz de traduzir com fiabilidade a realidade do processo produtivo da mesma e, se possível, auxiliar na sua resolução. O problema da programação da produção em estudo visa responder às questões: o quê, em que quantidade, quando e em que linha produzir, por forma a satisfazer as necessidades dos clientes num prazo previamente estipulado como admissível, garantindo o enchimento dos fornos ligados. Sem grandes constrangimentos ao normal lavor da Produção, pretende obter-se com a heurística planos de produção viáveis, que minimizem o tempo necessário para a conclusão do conjunto de referências com necessidades produtivas. O problema é também abordado através de um modelo exato como um problema de máquinas paralelas idênticas capacitado, com matriz de compatibilidades, setups de família e de subfamília e com lotes mínimos de produção. Quer a heurística quer o modelo de programação inteira mista desenvolvidos permitem obter planos de produção válidos, equivalentes aos obtidos atualmente pela empresa através dos meios de programação atuais, embora com um dispêndio de tempo muito inferior.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Objectives and study method: The objective of this study is to develop exact algorithms that can be used as management tools for the agricultural production planning and to obtain exact solutions for two of the most well known twodimensional packing problems: the strip packing problem and the bin packing problem. For the agricultural production planning problem we propose a new hierarchical scheme of three stages to improve the current agricultural practices. The objective of the first stage is to delineate rectangular and homogeneous management zones into the farmer’s plots considering the physical and chemical soil properties. This is an important task because the soil properties directly affect the agricultural production planning. The methodology for this stage is based on a new method called “Positions and Covering” that first generates all the possible positions in which the plot can be delineated. Then, we use a mathematical model of linear programming to obtain the optimal physical and chemical management zone delineation of the plot. In the second stage the objective is to determine the optimal crop pattern that maximizes the farmer’s profit taken into account the previous management zones delineation. In this case, the crop pattern is affected by both management zones delineation, physical and chemical. A mixed integer linear programming is used to solve this stage. The objective of the last stage is to determine in real-time the amount of water to irrigate in each crop. This stage takes as input the solution of the crop planning stage, the atmospheric conditions (temperature, radiation, etc.), the humidity level in plots, and the physical management zones of plots, just to name a few. This procedure is made in real-time during each irrigation period. A linear programming is used to solve this problem. A breakthrough happen when we realize that we could propose some adaptations of the P&C methodology to obtain optimal solutions for the two-dimensional packing problem and the strip packing. We empirically show that our methodologies are efficient on instances based on real data for both problems: agricultural and two-dimensional packing problems. Contributions and conclusions: The exact algorithms showed in this study can be used in the making-decision support for agricultural planning and twodimensional packing problems. For the agricultural planning problem, we show that the implementation of the new hierarchical approach can improve the farmer profit between 5.27% until 8.21% through the optimization of the natural resources. An important characteristic of this problem is that the soil properties (physical and chemical) and the real-time factors (climate, humidity level, evapotranspiration, etc.) are incorporated. With respect to the two-dimensional packing problems, one of the main contributions of this study is the fact that we have demonstrate that many of the best solutions founded in literature by others approaches (heuristics approaches) are the optimal solutions. This is very important because some of these solutions were up to now not guarantee to be the optimal solutions.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In aircraft components maintenance shops, components are distributed amongst repair groups and their respective technicians based on the type of repair, on the technicians skills and workload, and on the customer required dates. This distribution planning is typically done in an empirical manner based on the group leader’s past experience. Such a procedure does not provide any performance guarantees, leading frequently to undesirable delays on the delivery of the aircraft components. Among others, a fundamental challenge faced by the group leaders is to decide how to distribute the components that arrive without customer required dates. This paper addresses the problems of prioritizing the randomly arriving of aircraft components (with or without pre-assigned customer required dates) and of optimally distributing them amongst the technicians of the repair groups. We proposed a formula for prioritizing the list of repairs, pointing out the importance of selecting good estimators for the interarrival times between repair requests, the turn-around-times and the man hours for repair. In addition, a model for the assignment and scheduling problem is designed and a preliminary algorithm along with a numerical illustration is presented.