993 resultados para vacant lot


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose - This research note aims to present a summary of research concerning economic-lot scheduling problem (ELSP). Design/methodology/approach - The paper's approach is to review over 100 selected studies published in the last 15 years (1997-2012), which are then grouped under different research themes. Findings - Five research themes are identified and insights for future studies are reported at the end of this paper. Research limitations/implications - The motivation of preparing this research note is to summarize key research studies in this field since 1997, when the ELSP problems have been verified as NP-hard. Originality/value - ELSP is an important scheduling problem that has been studied since the 1950s. Because of its complexity in delivering a feasible analytical closed form solution, many studies in the last two decades employed heuristic algorithms in order to come up with good and acceptable solutions. As a consequence, the solution approaches are quite diversified. The major contribution of this paper is to provide researchers who are interested in this area with a quick reference guide on the reviewed studies. © Emerald Group Publishing Limited.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Firms worldwide are taking major initiatives to reduce the carbon footprint of their supply chains in response to the growing governmental and consumer pressures. In real life, these supply chains face stochastic and non-stationary demand but most of the studies on inventory lot-sizing problem with emission concerns consider deterministic demand. In this paper, we study the inventory lot-sizing problem under non-stationary stochastic demand condition with emission and cycle service level constraints considering carbon cap-and-trade regulatory mechanism. Using a mixed integer linear programming model, this paper aims to investigate the effects of emission parameters, product- and system-related features on the supply chain performance through extensive computational experiments to cover general type business settings and not a specific scenario. Results show that cycle service level and demand coefficient of variation have significant impacts on total cost and emission irrespective of level of demand variability while the impact of product's demand pattern is significant only at lower level of demand variability. Finally, results also show that increasing value of carbon price reduces total cost, total emission and total inventory and the scope of emission reduction by increasing carbon price is greater at higher levels of cycle service level and demand coefficient of variation. The analysis of results helps supply chain managers to take right decision in different demand and service level situations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent decades, a number of sustainable strategies and polices have been created to protect and preserve our water environments from the impacts of growing communities. The Australian approach, Water Sensitive Urban Design (WSUD), defined as the integration of urban planning and design with the urban water cycle management, has made considerable advances on design guidelines since 2000. WSUD stormwater management systems (e.g. wetlands, bioretentions, porous pavement etc), also known as Best Management Practices (BMPs) or Low Impact Development (LID), are slowly gaining popularity across Australia, the USA and Europe. There have also been significant improvements in how to model the performance of the WSUD technologies (e.g. MUSIC software). However, the implementation issues of these WSUD practices are mainly related to ongoing institutional capacity. Some of the key problems are associated with a limited awareness of urban planners and designers; in general, they have very little knowledge of these systems and their benefits to the urban environments. At the same time, hydrological engineers should have a better understanding of building codes and master plans. The land use regulations are equally as important as the physical site conditions for determining opportunities and constraints for implementing WSUD techniques. There is a need for procedures that can make a better linkage between urban planners and WSUD engineering practices. Thus, this paper aims to present the development of a general framework for incorporating WSUD technologies into the site planning process. The study was applied to lot-scale in the Melbourne region, Australia. Results show the potential space available for fitting WSUD elements, according to building requirements and different types of housing densities. © 2011 WIT Press.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research is motivated by the need for considering lot sizing while accepting customer orders in a make-to-order (MTO) environment, in which each customer order must be delivered by its due date. Job shop is the typical operation model used in an MTO operation, where the production planner must make three concurrent decisions; they are order selection, lot size, and job schedule. These decisions are usually treated separately in the literature and are mostly led to heuristic solutions. The first phase of the study is focused on a formal definition of the problem. Mathematical programming techniques are applied to modeling this problem in terms of its objective, decision variables, and constraints. A commercial solver, CPLEX is applied to solve the resulting mixed-integer linear programming model with small instances to validate the mathematical formulation. The computational result shows it is not practical for solving problems of industrial size, using a commercial solver. The second phase of this study is focused on development of an effective solution approach to this problem of large scale. The proposed solution approach is an iterative process involving three sequential decision steps of order selection, lot sizing, and lot scheduling. A range of simple sequencing rules are identified for each of the three subproblems. Using computer simulation as the tool, an experiment is designed to evaluate their performance against a set of system parameters. For order selection, the proposed weighted most profit rule performs the best. The shifting bottleneck and the earliest operation finish time both are the best scheduling rules. For lot sizing, the proposed minimum cost increase heuristic, based on the Dixon-Silver method performs the best, when the demand-to-capacity ratio at the bottleneck machine is high. The proposed minimum cost heuristic, based on the Wagner-Whitin algorithm is the best lot-sizing heuristic for shops of a low demand-to-capacity ratio. The proposed heuristic is applied to an industrial case to further evaluate its performance. The result shows it can improve an average of total profit by 16.62%. This research contributes to the production planning research community with a complete mathematical definition of the problem and an effective solution approach to solving the problem of industry scale.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Programa de doctorado: Nuevas perspectivas cognitivas en los estudios de lengua, literatura y traducción. La fecha de publicación es la fecha de lectura

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Imagine being told that your wage was going to be cut in half. Well, that’s what’s soon going to happen to those who make money from Bitcoin mining, the process of earning the online currency Bitcoin. The current expected date for this change is 11 July 2016. Many see this as the day when Bitcoin prices will rocket and when Bitcoin owners could make a great deal of money. Others see it as the start of a Bitcoin crash. At present no one quite knows which way it will go. Bitcoin was created in 2009 by someone known as Satoshi Nakamoto, borrowing from a whole lot of research methods. It is a cryptocurrency, meaning it uses digital encryption techniques to create bitcoins and secure financial transactions. It doesn’t need a central government or organisation to regulate it, nor a broker to manage payments. Conventional currencies usually have a central bank that creates money and controls its supply. Bitcoin is instead created when individuals “mine” for it by using their computers to perform complex calculations through special software. The algorithm behind Bitcoin is designed to limit the number of bitcoins that can ever be created. All Bitcoin transactions are recorded on a public database known as a blockchain. Every time someone mines for Bitcoin, it is recorded with a new block that is transmitted to every Bitcoin app across the network, like a bank updating its online records.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cadastral map showing lot lines, property-owners' names, and planned streets.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A method for estimating the dimensions of non-delimited free parking areas by using a static surveillance camera is proposed. The proposed method is specially designed to tackle the main challenges of urban scenarios (multiple moving objects, outdoor illumination conditions and occlusions between vehicles) with no training. The core of this work is the temporal analysis of the video frames to detect the occupancy variation of the parking areas. Two techniques are combined: background subtraction using a mixture of Gaussians to detect and track vehicles and the creation of a transience map to detect the parking and leaving of vehicles. The authors demonstrate that the proposed method yields satisfactory estimates on three real scenarios while being a low computational cost solution that can be applied in any kind of parking area covered by a single camera.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVES AND STUDY METHOD: There are two subjects in this thesis: “Lot production size for a parallel machine scheduling problem with auxiliary equipment” and “Bus holding for a simulated traffic network”. Although these two themes seem unrelated, the main idea is the optimization of complex systems. The “Lot production size for a parallel machine scheduling problem with auxiliary equipment” deals with a manufacturing setting where sets of pieces form finished products. The aim is to maximize the profit of the finished products. Each piece may be processed in more than one mold. Molds must be mounted on machines with their corresponding installation setup times. The key point of our methodology is to solve the single period lot-sizing decisions for the finished products together with the piece-mold and the mold-machine assignments, relaxing the constraint that a single mold may not be used in two machines at the same time. For the “Bus holding for a simulated traffic network” we deal with One of the most annoying problems in urban bus operations is bus bunching, which happens when two or more buses arrive at a stop nose to tail. Bus bunching reflects an unreliable service that affects transit operations by increasing passenger-waiting times. This work proposes a linear mathematical programming model that establishes bus holding times at certain stops along a transit corridor to avoid bus bunching. Our approach needs real-time input, so we simulate a transit corridor and apply our mathematical model to the data generated. Thus, the inherent variability of a transit system is considered by the simulation, while the optimization model takes into account the key variables and constraints of the bus operation. CONTRIBUTIONS AND CONCLUSIONS: For the “Lot production size for a parallel machine scheduling problem with auxiliary equipment” the relaxation we propose able to find solutions more efficiently, moreover our experimental results show that most of the solutions verify that molds are non-overlapping even if they are installed on several machines. We propose an exact integer linear programming, a Relax&Fix heuristic, and a multistart greedy algorithm to solve this problem. Experimental results on instances based on real-world data show the efficiency of our approaches. The mathematical model and the algorithm for the lot production size problem, showed in this research, can be used for production planners to help in the scheduling of the manufacturing. For the “Bus holding for a simulated traffic network” most of the literature considers quadratic models that minimize passenger-waiting times, but they are harder to solve and therefore difficult to operate by real-time systems. On the other hand, our methodology reduces passenger-waiting times efficiently given our linear programming model, with the characteristic of applying control intervals just every 5 minutes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Physarum can form a higher efficient and stronger robust network in the processing of foraging. The vacant-particle model with shrinkage (VP-S model), which captures the relationship between the movement of Physarum and the process of network formation, can construct a network with a good balance between exploration and exploitation. In this paper, the VP-S model is applied to design a transport network. We compare the performance of the network designed based on the VP-S model with the real-world transport network in terms of average path length, network efficiency and topology robustness. Experimental results show that the network designed based on the VP-S model has better performance than the real-world transport network in all measurements. Our study indicates that the Physarum-inspired model can provide useful suggestions to the real-world transport network design.