In moving from lowest cost adversarial based traditional procurement towards value driven methodologies the challenges range from re-engineering the process, to metrics and team alignment. This paper describes research into methodologies which encourage alignment of project partners towards achieving mutually beneficial goals. The research identifies nine variables which influence the achievement of successful projects delivering value. Results from case studies illustrate that not all parties can achieve value for themselves which directs attention to the balance between deliverables and the interests of team members. Re- valuing construction demands refocusing towards the delivery of operational assets and their place in the value system whilst recognising the need to manage the delivery process and the team to align the value to the parties. The objective of the project was to develop tools and recommendations for reform of project delivery in the building and construction industry to transform business-as-usual performance into exceptional performance. Benefits flow not only to the construction industry, but to the community as a whole because a more sophisticated industry can deliver more effective use of assets, financing, operating and maintenance of facilities to suit the community’s needs. This research was funded by the Australian Cooperative Research Centre for Construction Innovation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper discusses the issues with sharing information between different disciplines in collaborative projects. The focus is on the information itself rather than the wider issues of collaboration. A range of projects carried out by the Cooperative Research Centre for Construction Innovation (CRC CI) in Australia is used to illustrate the issues.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Joint ventures can take many forms and can be formed for different reasons, from sharing resources to creating future business opportunities. At the same time, there is increasing interest and discussion of alternative procurement methods, moving away from traditional procurement systems to relational approaches. Business systems and strategies need to be redefined and move from a short-term project to project culture to a more strategic, long-term perspective. Joint ventures of construction organisations, global and local, have become increasingly popular to deliver large-scale infrastructure construction projects. However, successful strategic collaborations require project organisations to formulate a fit between contractual and operational arrangements for each situation. This study reviews the movement from traditional procurement methods towards relational contracting approaches in Queensland, Australia. The study examines the organisational factors that facilitates sustainable relationship between project organisations and hence, lead to long-term business success. This paper reports on initial findings captured from a survey undertaken with construction contracting organisations in Australia, focusing on the supply chain relationships. Contractors’ perceptions of the relationship management process and the engagement of the supply chain are also presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

PPP (Public Private Partnerships) is a new operation mode of infrastructure projects, which usually undergo long periods and have various kinds of risks in technology, market, politics, policy, finance, society, natural conditions and cooperation. So the government and the private agency should establish the risk-sharing mechanism to ensure the successful implementation of the project. As an important branch of the new institutional economics, transaction cost economics and its analysis method have been proved to be beneficial to the proper allocation of risks between the two parts in PPP projects and the improvement of operation efficiency of PPP risk-sharing mechanism. This paper analyzed the transaction cost of the projects risk-sharing method and the both risk carriers. It pointed out that the risk-sharing method of PPP projects not only reflected the spirit of cooperation between public sector and private agency, but also minimized the total transaction cost of the risk sharing mechanism itself. Meanwhile, the risk takers had to strike a balance between the beforehand cost and the afterwards cost so as to control the cost of risk management. The paper finally suggested three ways which might be useful to reduce the transaction cost: to choose appropriate type of contract of PPP risk-sharing mechanism, to prevent information asymmetry and to establish mutual trust between the two participants.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

3D Virtual Environments (VE) are real; they exist as digital worlds with the advantage of having none of the constraints of the real world. As such they are the perfect training ground for design students who can create, build and experiment with design solutions without the constraint of real world projects. This paper reports on an educational setting used to explore a model for using VE such as Second Life (SL) developed by Linden Labs in California, as a collaborative environment for design education. A postgraduate landscape architecture learning environment within a collaborative design unit was developed to integrate this model where the primary focus was the application of three-dimensional tools within design, not as a presentation tool, but rather as a design tool. The focus of the unit and its aims and objectives will be outlined before describing the use of SL in the unit. Attention is focused on the collaboration and learning experience before discussing the outcomes, student feedback, future projects using this model and potential for further research. The outcome of this study aims to contribute to current research on teaching and learning design in interactive VE’s. We present a case study of our first application of this model.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Successful project delivery of construction projects depends on many factors. With regard to the construction of a facility, selecting a competent contractor for the job is paramount. As such, various approaches have been advanced to facilitate tender award decisions. Essentially, this type of decision involves the prediction of a bidderÕs performance based on information available at the tender stage. A neural network based prediction model was developed and presented in this paper. Project data for the study were obtained from the Hong Kong Housing Department. Information from the tender reports was used as input variables and performance records of the successful bidder during construction were used as output variables. It was found that the networks for the prediction of performance scores for Works gave the highest hit rate. In addition, the two most sensitive input variables toward such prediction are ‘‘Difference between Estimate’’ and ‘‘Difference between the next closest bid’’. Both input variables are price related, thus suggesting the importance of tender sufficiency for the assurance of quality production.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Abstract: Purpose – Several major infrastructure projects in the Hong Kong Special Administrative Region (HKSAR) have been delivered by the build-operate-transfer (BOT) model since the 1960s. Although the benefits of using BOT have been reported abundantly in the contemporary literature, some BOT projects were less successful than the others. This paper aims to find out why this is so and to explore whether BOT is the best financing model to procure major infrastructure projects. Design/methodology/approach – The benefits of BOT will first be reviewed. Some completed BOT projects in Hong Kong will be examined to ascertain how far the perceived benefits of BOT have been materialized in these projects. A highly profiled project, the Hong Kong-Zhuhai-Macau Bridge, which has long been promoted by the governments of the People's Republic of China, Macau Special Administrative Region and the HKSAR that BOT is the preferred financing model, but suddenly reverted back to the traditional financing model to be funded primarily by the three governments with public money instead, will be studied to explore the true value of the BOT financial model. Findings – Six main reasons for this radical change are derived from the analysis: shorter take-off time for the project; difference in legal systems causing difficulties in drafting BOT agreements; more government control on tolls; private sector uninterested due to unattractive economic package; avoid allegation of collusion between business and the governments; and a comfortable financial reserve possessed by the host governments. Originality/value – The findings from this paper are believed to provide a better understanding to the real benefits of BOT and the governments' main decision criteria in delivering major infrastructure projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Road and highway infrastructure provides the backbone for a nation's economic growth. The versatile dispersion of population in Australia, from sparsely settled communities in remote areas to regenerated inner city suburbs with high density living in metropolitans, calls for continuing development and improvement on roads infrastructure under the current federal government policies and state governments' strategic plans. As road infrastructure projects involve large resources and mechanism, achieving sustainability not only in economic scales but also through environmental and social responsibility becomes a crucial issue. Current efforts are often impeded by different interpretation on sustainability agenda by stakeholders involved in these types of projects. As a result, sustainability deliverables at the project level is not often as transparent and measurable, compared to promises in project briefs and designs. This paper reviews the past studies on sustainable infrastructure construction, focusing on roads and highway projects. Through literature study and consultation with the industry, key sustainability indicators specific to road infrastructure projects have been identified. Based on these findings, this paper introduces an on-going research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, and issues that impact on the gap between sustainability foci and its actual realization at project end level. The exploration helps generate an integrated decision-making model for sustainable road infrastructure projects. The research will promote to the industry more systematic and integrated approaches to decision-making on the implementation of sustainability strategies to achieve deliverable goals throughout the development and delivery process of road infrastructure projects in Australia.