989 resultados para stochastic load factor


Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the photovoltaic field, the back contact solar cells technology has appeared as an alternative to the traditional silicon modules. This new type of cells places both positive and negative contacts on the back side of the cells maximizing the exposed surface to the light and making easier the interconnection of the cells in the module. The Emitter Wrap-Through solar cell structure presents thousands of tiny holes to wrap the emitter from the front surface to the rear surface. These holes are made in a first step over the silicon wafers by means of a laser drilling process. This step is quite harmful from a mechanical point of view since holes act as stress concentrators leading to a reduction in the strength of these wafers. This paper presents the results of the strength characterization of drilled wafers. The study is carried out testing the samples with the ring on ring device. Finite Element models are developed to simulate the tests. The stress concentration factor of the drilled wafers under this load conditions is determined from the FE analysis. Moreover, the material strength is characterized fitting the fracture stress of the samples to a three-parameter Weibull cumulative distribution function. The parameters obtained are compared with the ones obtained in the analysis of a set of samples without holes to validate the method employed for the study of the strength of silicon drilled wafers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

I. GENERALIDADES 1.1. Introducción Entre los diversos tipos de perturbaciones eléctricas, los huecos de tensión son considerados el problema de calidad de suministro más frecuente en los sistemas eléctricos. Este fenómeno es originado por un aumento extremo de la corriente en el sistema, causado principalmente por cortocircuitos o maniobras inadecuadas en la red. Este tipo de perturbación eléctrica está caracterizado básicamente por dos parámetros: tensión residual y duración. Típicamente, se considera que el hueco se produce cuando la tensión residual alcanza en alguna de las fases un valor entre 0.01 a 0.9 pu y tiene una duración de hasta 60 segundos. Para un usuario final, el efecto más relevante de un hueco de tensión es la interrupción o alteración de la operación de sus equipos, siendo los dispositivos de naturaleza electrónica los principalmente afectados (p. ej. ordenador, variador de velocidad, autómata programable, relé, etc.). Debido al auge tecnológico de las últimas décadas y a la búsqueda constante de automatización de los procesos productivos, el uso de componentes electrónicos resulta indispensable en la actualidad. Este hecho, lleva a que los efectos de los huecos de tensión sean más evidentes para el usuario final, provocando que su nivel de exigencia de la calidad de energía suministrada sea cada vez mayor. De forma general, el estudio de los huecos de tensión suele ser abordado bajo dos enfoques: en la carga o en la red. Desde el punto de vista de la carga, se requiere conocer las características de sensibilidad de los equipos para modelar su respuesta ante variaciones súbitas de la tensión del suministro eléctrico. Desde la perspectiva de la red, se busca estimar u obtener información adecuada que permita caracterizar su comportamiento en términos de huecos de tensión. En esta tesis, el trabajo presentado se encuadra en el segundo aspecto, es decir, en el modelado y estimación de la respuesta de un sistema eléctrico de potencia ante los huecos de tensión. 1.2. Planteamiento del problema A pesar de que los huecos de tensión son el problema de calidad de suministro más frecuente en las redes, hasta la actualidad resulta complejo poder analizar de forma adecuada este tipo de perturbación para muchas compañías del sector eléctrico. Entre las razones más comunes se tienen: - El tiempo de monitorización puede llegar a ser de varios años para conseguir una muestra de registros de huecos estadísticamente válida. - La limitación de recursos económicos para la adquisición e instalación de equipos de monitorización de huecos. - El elevado coste operativo que implica el análisis de los datos de los medidores de huecos de tensión instalados. - La restricción que tienen los datos de calidad de energía de las compañías eléctricas. Es decir, ante la carencia de datos que permitan analizar con mayor detalle los huecos de tensión, es de interés de las compañías eléctricas y la academia poder crear métodos fiables que permitan profundizar en el estudio, estimación y supervisión de este fenómeno electromagnético. Los huecos de tensión, al ser principalmente originados por eventos fortuitos como los cortocircuitos, son el resultado de diversas variables exógenas como: (i) la ubicación de la falta, (ii) la impedancia del material de contacto, (iii) el tipo de fallo, (iv) la localización del fallo en la red, (v) la duración del evento, etc. Es decir, para plantear de forma adecuada cualquier modelo teórico sobre los huecos de tensión, se requeriría representar esta incertidumbre combinada de las variables para proveer métodos realistas y, por ende, fiables para los usuarios. 1.3. Objetivo La presente tesis ha tenido como objetivo el desarrollo diversos métodos estocásticos para el estudio, estimación y supervisión de los huecos de tensión en los sistemas eléctricos de potencia. De forma específica, se ha profundizado en los siguientes ámbitos: - En el modelado realista de las variables que influyen en la caracterización de los huecos. Esto es, en esta Tesis se ha propuesto un método que permite representar de forma verosímil su cuantificación y aleatoriedad en el tiempo empleando distribuciones de probabilidad paramétricas. A partir de ello, se ha creado una herramienta informática que permite estimar la severidad de los huecos de tensión en un sistema eléctrico genérico. - Se ha analizado la influencia la influencia de las variables de entrada en la estimación de los huecos de tensión. En este caso, el estudio se ha enfocado en las variables de mayor divergencia en su caracterización de las propuestas existentes. - Se ha desarrollado un método que permite estima el número de huecos de tensión de una zona sin monitorización a través de la información de un conjunto limitado de medidas de un sistema eléctrico. Para ello, se aplican los principios de la estadística Bayesiana, estimando el número de huecos de tensión más probable de un emplazamiento basándose en los registros de huecos de otros nudos de la red. - Plantear una estrategia para optimizar la monitorización de los huecos de tensión en un sistema eléctrico. Es decir, garantizar una supervisión del sistema a través de un número de medidores menor que el número de nudos de la red. II. ESTRUCTURA DE LA TESIS Para plantear las propuestas anteriormente indicadas, la presente Tesis se ha estructurado en seis capítulos. A continuación, se describen brevemente los mismos. A manera de capítulo introductorio, en el capítulo 1, se realiza una descripción del planteamiento y estructura de la presente tesis. Esto es, se da una visión amplia de la problemática a tratar, además de describir el alcance de cada capítulo de la misma. En el capítulo 2, se presenta una breve descripción de los fundamentos y conceptos generales de los huecos de tensión. Los mismos, buscan brindar al lector de una mejor comprensión de los términos e indicadores más empleados en el análisis de severidad de los huecos de tensión en las redes eléctricas. Asimismo, a manera de antecedente, se presenta un resumen de las principales características de las técnicas o métodos existentes aplicados en la predicción y monitorización óptima de los huecos de tensión. En el capítulo 3, se busca fundamentalmente conocer la importancia de las variables que determinen la frecuencia o severidad de los huecos de tensión. Para ello, se ha implementado una herramienta de estimación de huecos de tensión que, a través de un conjunto predeterminado de experimentos mediante la técnica denominada Diseño de experimentos, analiza la importancia de la parametrización de las variables de entrada del modelo. Su análisis, es realizado mediante la técnica de análisis de la varianza (ANOVA), la cual permite establecer con rigor matemático si la caracterización de una determinada variable afecta o no la respuesta del sistema en términos de los huecos de tensión. En el capítulo 4, se propone una metodología que permite predecir la severidad de los huecos de tensión de todo el sistema a partir de los registros de huecos de un conjunto reducido de nudos de dicha red. Para ello, se emplea el teorema de probabilidad condicional de Bayes, el cual calcula las medidas más probables de todo el sistema a partir de la información proporcionada por los medidores de huecos instalados. Asimismo, en este capítulo se revela una importante propiedad de los huecos de tensión, como es la correlación del número de eventos de huecos de tensión en diversas zonas de las redes eléctricas. En el capítulo 5, se desarrollan dos métodos de localización óptima de medidores de huecos de tensión. El primero, que es una evolución metodológica del criterio de observabilidad; aportando en el realismo de la pseudo-monitorización de los huecos de tensión con la que se calcula el conjunto óptimo de medidores y, por ende, en la fiabilidad del método. Como una propuesta alternativa, se emplea la propiedad de correlación de los eventos de huecos de tensión de una red para plantear un método que permita establecer la severidad de los huecos de todo el sistema a partir de una monitorización parcial de dicha red. Finalmente, en el capítulo 6, se realiza una breve descripción de las principales aportaciones de los estudios realizados en esta tesis. Adicionalmente, se describen diversos temas a desarrollar en futuros trabajos. III. RESULTADOS En base a las pruebas realizadas en las tres redes planteadas; dos redes de prueba IEEE de 24 y 118 nudos (IEEE-24 e IEEE-118), además del sistema eléctrico de la República del Ecuador de 357 nudos (EC-357), se describen los siguientes puntos como las observaciones más relevantes: A. Estimación de huecos de tensión en ausencia de medidas: Se implementa un método estocástico de estimación de huecos de tensión denominado PEHT, el cual representa con mayor realismo la simulación de los eventos de huecos de un sistema a largo plazo. Esta primera propuesta de la tesis, es considerada como un paso clave para el desarrollo de futuros métodos del presente trabajo, ya que permite emular de forma fiable los registros de huecos de tensión a largo plazo en una red genérica. Entre las novedades más relevantes del mencionado Programa de Estimación de Huecos de Tensión (PEHT) se tienen: - Considerar el efecto combinado de cinco variables aleatorias de entrada para simular los eventos de huecos de tensión en una pseudo-monitorización a largo plazo. Las variables de entrada modeladas en la caracterización de los huecos de tensión en el PEHT son: (i) coeficiente de fallo, (ii) impedancia de fallo, (iii) tipo de fallo, (iv) localización del fallo y (v) duración. - El modelado estocástico de las variables de entrada impedancia de fallo y duración en la caracterización de los eventos de huecos de tensión. Para la parametrización de las variables mencionadas, se realizó un estudio detallado del comportamiento real de las mismas en los sistemas eléctricos. Asimismo, se define la función estadística que mejor representa la naturaleza aleatoria de cada variable. - Considerar como variables de salida del PEHT a indicadores de severidad de huecos de uso común en las normativas, como es el caso de los índices: SARFI-X, SARFI-Curve, etc. B. Análisis de sensibilidad de los huecos de tensión: Se presenta un estudio causa-efecto (análisis de sensibilidad) de las variables de entrada de mayor divergencia en su parametrización entre las referencias relacionadas a la estimación de los huecos de tensión en redes eléctricas. De forma específica, se profundiza en el estudio de la influencia de la parametrización de las variables coeficiente de fallo e impedancia de fallo en la predicción de los huecos de tensión. A continuación un resumen de las conclusiones más destacables: - La precisión de la variable de entrada coeficiente de fallo se muestra como un parámetro no influyente en la estimación del número de huecos de tensión (SARFI-90 y SARFI-70) a largo plazo. Es decir, no se requiere de una alta precisión del dato tasa de fallo de los elementos del sistema para obtener una adecuada estimación de los huecos de tensión. - La parametrización de la variable impedancia de fallo se muestra como un factor muy sensible en la estimación de la severidad de los huecos de tensión. Por ejemplo, al aumentar el valor medio de esta variable aleatoria, se disminuye considerablemente la severidad reportada de los huecos en la red. Por otra parte, al evaluar el parámetro desviación típica de la impedancia de fallo, se observa una relación directamente proporcional de este parámetro con la severidad de los huecos de tensión de la red. Esto es, al aumentar la desviación típica de la impedancia de fallo, se evidencia un aumento de la media y de la variación interanual de los eventos SARFI-90 y SARFI-70. - En base al análisis de sensibilidad desarrollado en la variable impedancia de fallo, se considera muy cuestionable la fiabilidad de los métodos de estimación de huecos de tensión que omiten su efecto en el modelo planteado. C. Estimación de huecos de tensión en base a la información de una monitorización parcial de la red: Se desarrolla un método que emplea los registros de una red parcialmente monitorizada para determinar la severidad de los huecos de todo el sistema eléctrico. A partir de los casos de estudio realizados, se observa que el método implementado (PEHT+MP) posee las siguientes características: - La metodología propuesta en el PEHT+MP combina la teoría clásica de cortocircuitos con diversas técnicas estadísticas para estimar, a partir de los datos de los medidores de huecos instalados, las medidas de huecos de los nudos sin monitorización de una red genérica. - El proceso de estimación de los huecos de tensión de la zona no monitorizada de la red se fundamenta en la aplicación del teorema de probabilidad condicional de Bayes. Es decir, en base a los datos observados (los registros de los nudos monitorizados), el PEHT+MP calcula de forma probabilística la severidad de los huecos de los nudos sin monitorización del sistema. Entre las partes claves del procedimiento propuesto se tienen los siguientes puntos: (i) la creación de una base de datos realista de huecos de tensión a través del Programa de Estimación de Huecos de Tensión (PEHT) propuesto en el capítulo anterior; y, (ii) el criterio de máxima verosimilitud empleado para estimar las medidas de huecos de los nudos sin monitorización de la red evaluada. - Las predicciones de medidas de huecos de tensión del PEHT+MP se ven potenciadas por la propiedad de correlación de los huecos de tensión en diversas zonas de un sistema eléctrico. Esta característica intrínseca de las redes eléctricas limita de forma significativa la respuesta de las zonas fuertemente correlacionadas del sistema ante un eventual hueco de tensión. Como el PEHT+MP está basado en principios probabilísticos, la reducción del rango de las posibles medidas de huecos se ve reflejado en una mejor predicción de las medidas de huecos de la zona no monitorizada. - Con los datos de un conjunto de medidores relativamente pequeño del sistema, es posible obtener estimaciones precisas (error nulo) de la severidad de los huecos de la zona sin monitorizar en las tres redes estudiadas. - El PEHT+MP se puede aplicar a diversos tipos de indicadores de severidad de los huecos de tensión, como es el caso de los índices: SARFI-X, SARFI-Curve, SEI, etc. D. Localización óptima de medidores de huecos de tensión: Se plantean dos métodos para ubicar de forma estratégica al sistema de monitorización de huecos en una red genérica. La primera propuesta, que es una evolución metodológica de la localización óptima de medidores de huecos basada en el criterio de observabilidad (LOM+OBS); y, como segunda propuesta, un método que determina la localización de los medidores de huecos según el criterio del área de correlación (LOM+COR). Cada método de localización óptima de medidores propuesto tiene un objetivo concreto. En el caso del LOM+OBS, la finalidad del método es determinar el conjunto óptimo de medidores que permita registrar todos los fallos que originen huecos de tensión en la red. Por otro lado, en el método LOM+COR se persigue definir un sistema óptimo de medidores que, mediante la aplicación del PEHT+MP (implementado en el capítulo anterior), sea posible estimar de forma precisa las medidas de huecos de tensión de todo el sistema evaluado. A partir del desarrollo de los casos de estudio de los citados métodos de localización óptima de medidores en las tres redes planteadas, se describen a continuación las observaciones más relevantes: - Como la generación de pseudo-medidas de huecos de tensión de los métodos de localización óptima de medidores (LOM+OBS y LOM+COR) se obtienen mediante la aplicación del algoritmo PEHT, la formulación del criterio de optimización se realiza en base a una pseudo-monitorización realista, la cual considera la naturaleza aleatoria de los huecos de tensión a través de las cinco variables estocásticas modeladas en el PEHT. Esta característica de la base de datos de pseudo-medidas de huecos de los métodos LOM+OBS y LOM+COR brinda una mayor fiabilidad del conjunto óptimo de medidores calculado respecto a otros métodos similares en la bibliografía. - El conjunto óptimo de medidores se determina según la necesidad del operador de la red. Esto es, si el objetivo es registrar todos los fallos que originen huecos de tensión en el sistema, se emplea el criterio de observabilidad en la localización óptima de medidores de huecos. Por otra parte, si se plantea definir un sistema de monitorización que permita establecer la severidad de los huecos de tensión de todo el sistema en base a los datos de un conjunto reducido de medidores de huecos, el criterio de correlación resultaría el adecuado. De forma específica, en el caso del método LOM+OBS, basado en el criterio de observabilidad, se evidenciaron las siguientes propiedades en los casos de estudio realizados: - Al aumentar el tamaño de la red, se observa la tendencia de disminuir el porcentaje de nudos monitorizados de dicho sistema. Por ejemplo, para monitorizar los fallos que originan huecos en la red IEEE-24, se requiere monitorizar el 100\% de los nudos del sistema. En el caso de las redes IEEE-118 y EC-357, el método LOM+OBS determina que con la monitorización de un 89.5% y 65.3% del sistema, respectivamente, se cumpliría con el criterio de observabilidad del método. - El método LOM+OBS permite calcular la probabilidad de utilización del conjunto óptimo de medidores a largo plazo, estableciendo así un criterio de la relevancia que tiene cada medidor considerado como óptimo en la red. Con ello, se puede determinar el nivel de precisión u observabilidad (100%, 95%, etc.) con el cual se detectarían los fallos que generan huecos en la red estudiada. Esto es, al aumentar el nivel de precisión de detección de los fallos que originan huecos, se espera que aumente el número de medidores requeridos en el conjunto óptimo de medidores calculado. - El método LOM+OBS se evidencia como una técnica aplicable a todo tipo de sistema eléctrico (radial o mallado), el cual garantiza la detección de los fallos que originan huecos de tensión en un sistema según el nivel de observabilidad planteado. En el caso del método de localización óptima de medidores basado en el criterio del área de correlación (LOM+COR), las diversas pruebas realizadas evidenciaron las siguientes conclusiones: - El procedimiento del método LOM+COR combina los métodos de estimación de huecos de tensión de capítulos anteriores (PEHT y PEHT+MP) con técnicas de optimización lineal para definir la localización óptima de los medidores de huecos de tensión de una red. Esto es, se emplea el PEHT para generar los pseudo-registros de huecos de tensión, y, en base al criterio planteado de optimización (área de correlación), el LOM+COR formula y calcula analíticamente el conjunto óptimo de medidores de la red a largo plazo. A partir de la información registrada por este conjunto óptimo de medidores de huecos, se garantizaría una predicción precisa de la severidad de los huecos de tensión de todos los nudos del sistema con el PEHT+MP. - El método LOM+COR requiere un porcentaje relativamente reducido de nudos del sistema para cumplir con las condiciones de optimización establecidas en el criterio del área de correlación. Por ejemplo, en el caso del número total de huecos (SARFI-90) de las redes IEEE-24, IEEE-118 y EC-357, se calculó un conjunto óptimo de 9, 12 y 17 medidores de huecos, respectivamente. Es decir, solamente se requeriría monitorizar el 38\%, 10\% y 5\% de los sistemas indicados para supervisar los eventos SARFI-90 en toda la red. - El método LOM+COR se muestra como un procedimiento de optimización versátil, el cual permite reducir la dimensión del sistema de monitorización de huecos de redes eléctricas tanto radiales como malladas. Por sus características, este método de localización óptima permite emular una monitorización integral del sistema a través de los registros de un conjunto pequeño de monitores. Por ello, este nuevo método de optimización de medidores sería aplicable a operadores de redes que busquen disminuir los costes de instalación y operación del sistema de monitorización de los huecos de tensión. ABSTRACT I. GENERALITIES 1.1. Introduction Among the various types of electrical disturbances, voltage sags are considered the most common quality problem in power systems. This phenomenon is caused by an extreme increase of the current in the network, primarily caused by short-circuits or inadequate maneuvers in the system. This type of electrical disturbance is basically characterized by two parameters: residual voltage and duration. Typically, voltage sags occur when the residual voltage, in some phases, reaches a value between 0.01 to 0.9 pu and lasts up to 60 seconds. To an end user, the most important effect of a voltage sags is the interruption or alteration of their equipment operation, with electronic devices the most affected (e.g. computer, drive controller, PLC, relay, etc.). Due to the technology boom of recent decades and the constant search for automating production processes, the use of electronic components is essential today. This fact makes the effects of voltage sags more noticeable to the end user, causing the level of demand for a quality energy supply to be increased. In general, the study of voltage sags is usually approached from one of two aspects: the load or the network. From the point of view of the load, it is necessary to know the sensitivity characteristics of the equipment to model their response to sudden changes in power supply voltage. From the perspective of the network, the goal is to estimate or obtain adequate information to characterize the network behavior in terms of voltage sags. In this thesis, the work presented fits into the second aspect; that is, in the modeling and estimation of the response of a power system to voltage sag events. 1.2. Problem Statement Although voltage sags are the most frequent quality supply problem in electrical networks, thistype of disturbance remains complex and challenging to analyze properly. Among the most common reasons for this difficulty are: - The sag monitoring time, because it can take up to several years to get a statistically valid sample. - The limitation of funds for the acquisition and installation of sag monitoring equipment. - The high operating costs involved in the analysis of the voltage sag data from the installed monitors. - The restrictions that electrical companies have with the registered power quality data. That is, given the lack of data to further voltage sag analysis, it is of interest to electrical utilities and researchers to create reliable methods to deepen the study, estimation and monitoring of this electromagnetic phenomenon. Voltage sags, being mainly caused by random events such as short-circuits, are the result of various exogenous variables such as: (i) the number of faults of a system element, (ii) the impedance of the contact material, (iii) the fault type, (iv) the fault location, (v) the duration of the event, etc. That is, to properly raise any theoretical model of voltage sags, it is necessary to represent the combined uncertainty of variables to provide realistic methods that are reliable for users. 1.3. Objective This Thesis has been aimed at developing various stochastic methods for the study, estimation and monitoring of voltage sags in electrical power systems. Specifically, it has deepened the research in the following areas: - This research furthers knowledge in the realistic modeling of the variables that influence sag characterization. This thesis proposes a method to credibly represent the quantification and randomness of the sags in time by using parametric probability distributions. From this, a software tool was created to estimate the severity of voltage sags in a generic power system. - This research also analyzes the influence of the input variables in the estimation of voltage sags. In this case, the study has focused on the variables of greatest divergence in their characterization of the existing proposals. - A method was developed to estimate the number of voltage sags of an area without monitoring through the information of a limited set of sag monitors in an electrical system. To this end, the principles of Bayesian statistics are applied, estimating the number of sags most likely to happen in a system busbar based in records of other sag network busbars. - A strategy was developed to optimize the monitorization of voltage sags on a power system. Its purpose is to ensure the monitoring of the system through a number of monitors lower than the number of busbars of the network assessed. II. THESIS STRUCTURE To describe in detail the aforementioned proposals, this Thesis has been structured into six chapters. Below is are brief descriptions of them: As an introductory chapter, Chapter 1, provides a description of the approach and structure of this thesis. It presents a wide view of the problem to be treated, in addition to the description of the scope of each chapter. In Chapter 2, a brief description of the fundamental and general concepts of voltage sags is presented to provide to the reader a better understanding of the terms and indicators used in the severity analysis of voltage sags in power networks. Also, by way of background, a summary of the main features of existing techniques or methods used in the prediction and optimal monitoring of voltage sags is also presented. Chapter 3 essentially seeks to know the importance of the variables that determine the frequency or severity of voltage sags. To do this, a tool to estimate voltage sags is implemented that, through a predetermined set of experiments using the technique called Design of Experiments, discusses the importance of the parameters of the input variables of the model. Its analysis is interpreted by using the technique of analysis of variance (ANOVA), which provides mathematical rigor to establish whether the characterization of a particular variable affects the system response in terms of voltage sags or not. In Chapter 4, a methodology to predict the severity of voltage sags of an entire system through the sag logs of a reduced set of monitored busbars is proposed. For this, the Bayes conditional probability theorem is used, which calculates the most likely sag severity of the entire system from the information provided by the installed monitors. Also, in this chapter an important property of voltage sags is revealed, as is the correlation of the voltage sags events in several zones of a power system. In Chapter 5, two methods of optimal location of voltage sag monitors are developed. The first one is a methodological development of the observability criteria; it contributes to the realism of the sag pseudo-monitoring with which the optimal set of sag monitors is calculated and, therefore, to the reliability of the proposed method. As an alternative proposal, the correlation property of the sag events of a network is used to raise a method that establishes the sag severity of the entire system from a partial monitoring of the network. Finally, in Chapter 6, a brief description of the main contributions of the studies in this Thesis is detailed. Additionally, various themes to be developed in future works are described. III. RESULTS. Based on tests on the three networks presented, two IEEE test networks of 24 and 118 busbars (IEEE-24 and IEEE-118) and the electrical system of the Republic of Ecuador (EC-357), the following points present the most important observations: A. Estimation of voltage sags in the absence of measures: A stochastic estimation method of voltage sags, called PEHT, is implemented to represent with greater realism the long-term simulation of voltage sags events in a system. This first proposal of this thesis is considered a key step for the development of future methods of this work, as it emulates in a reliable manner the voltage sag long-term records in a generic network. Among the main innovations of this voltage sag estimation method are the following: - Consideration of the combined effect of five random input variables to simulate the events of voltage sags in long-term monitoring is included. The input variables modeled in the characterization of voltage sags on the PEHT are as follows: (i) fault coefficient, (ii) fault impedance, (iii) type of fault, (iv) location of the fault, and (v) fault duration. - Also included is the stochastic modeling of the input variables of fault impedance and duration in the characterization of the events of voltage sags. For the parameterization of these variables, a detailed study of the real behavior in power systems is developed. Also, the statistical function best suited to the random nature of each variable is defined. - Consideration of sag severity indicators used in standards as PEHT output variables, including such as indices as SARFI-X, SARFI-Curve, etc. B. Sensitivity analysis of voltage sags: A cause-effect study (sensitivity analysis) of the input variables of greatest divergence between reference parameterization related to the estimation of voltage sags in electrical networks is presented. Specifically, it delves into the study of the influence of the parameterization of the variables fault coefficient and fault impedance in the voltage sag estimation. Below is a summary of the most notable observations: - The accuracy of the input variable fault coefficient is shown as a non-influential parameter in the long-term estimation of the number of voltage sags (SARFI-90 and SARFI-70). That is, it does not require a high accuracy of the fault rate data of system elements for a proper voltage sag estimation. - The parameterization of the variable fault impedance is shown to be a very sensitive factor in the estimation of the voltage sag severity. For example, by increasing the average value of this random variable, the reported sag severity in the network significantly decreases. Moreover, in assessing the standard deviation of the fault impedance parameter, a direct relationship of this parameter with the voltage sag severity of the network is observed. That is, by increasing the fault impedance standard deviation, an increase of the average and the interannual variation of the SARFI-90 and SARFI-70 events is evidenced. - Based on the sensitivity analysis developed in the variable fault impedance, the omission of this variable in the voltage sag estimation would significantly call into question the reliability of the responses obtained. C. Voltage sag estimation from the information of a network partially monitored: A method that uses the voltage sag records of a partially monitored network for the sag estimation of all the power system is developed. From the case studies performed, it is observed that the method implemented (PEHT+MP) has the following characteristics: - The methodology proposed in the PEHT+MP combines the classical short-circuit theory with several statistical techniques to estimate, from data the of the installed sag meters, the sag measurements of unmonitored busbars of a generic power network. - The estimation process of voltage sags of the unmonitored zone of the network is based on the application of the conditional probability theorem of Bayes. That is, based on the observed data (monitored busbars records), the PEHT+MP calculates probabilistically the sag severity at unmonitored system busbars. Among the key parts of the proposed procedure are the following: (i) the creation of a realistic data base of voltage sags through of the sag estimation program (PEHT); and, (ii) the maximum likelihood criterion used to estimate the sag indices of system busbars without monitoring. - The voltage sag measurement estimations of PEHT+MP are potentiated by the correlation property of the sag events in power systems. This inherent characteristic of networks significantly limits the response of strongly correlated system zones to a possible voltage sag. As the PEHT+MP is based on probabilistic principles, a reduction of the range of possible sag measurements is reflected in a better sag estimation of the unmonitored area of the power system. - From the data of a set of monitors representing a relatively small portion of the system, to obtain accurate estimations (null error) of the sag severity zones without monitoring is feasible in the three networks studied. - The PEHT+MP can be applied to several types of sag indices, such as: SARFI-X, SARFI-Curve, SEI, etc. D. Optimal location of voltage sag monitors in power systems: Two methods for strategically locating the sag monitoring system are implemented for a generic network. The first proposal is a methodological development of the optimal location of sag monitors based on the observability criterion (LOM + OBS); the second proposal is a method that determines the sag monitor location according to the correlation area criterion (LOM+COR). Each proposed method of optimal location of sag monitors has a specific goal. In the case of LOM+OBS, the purpose of the method is to determine the optimal set of sag monitors to record all faults that originate voltage sags in the network. On the other hand, the LOM+COR method attempts to define the optimal location of sag monitors to estimate the sag indices in all the assessed network with the PEHT+MP application. From the development of the case studies of these methods of optimal location of sag monitors in the three networks raised, the most relevant observations are described below: - As the generation of voltage sag pseudo-measurements of the optimal location methods (LOM+OBS and LOM+COR) are obtained by applying the algorithm PEHT, the formulation of the optimization criterion is performed based on a realistic sag pseudo-monitoring, which considers the random nature of voltage sags through the five stochastic variables modeled in PEHT. This feature of the database of sag pseudo-measurements of the LOM+OBS and LOM+COR methods provides a greater reliability of the optimal set of monitors calculated when compared to similar methods in the bibliography. - The optimal set of sag monitors is determined by the network operator need. That is, if the goal is to record all faults that originate from voltage sags in the system, the observability criterion is used to determine the optimal location of sag monitors (LOM+OBS). Moreover, if the objective is to define a monitoring system that allows establishing the sag severity of the system from taken from information based on a limited set of sag monitors, the correlation area criterion would be appropriate (LOM+COR). Specifically, in the case of the LOM+OBS method (based on the observability criterion), the following properties were observed in the case studies: - By increasing the size of the network, there was observed a reduction in the percentage of monitored system busbars required. For example, to monitor all the faults which cause sags in the IEEE-24 network, then 100% of the system busbars are required for monitoring. In the case of the IEEE-118 and EC-357 networks, the method LOM+OBS determines that with monitoring 89.5 % and 65.3 % of the system, respectively, the observability criterion of the method would be fulfilled. - The LOM+OBS method calculates the probability of using the optimal set of sag monitors in the long term, establishing a relevance criterion of each sag monitor considered as optimal in the network. With this, the level of accuracy or observability (100%, 95%, etc.) can be determined, with which the faults that caused sags in the studied network are detected. That is, when the accuracy level for detecting faults that cause sags in the system is increased, a larger number of sag monitors is expected when calculating the optimal set of monitors. - The LOM + OBS method is demonstrated to be a technique applicable to any type of electrical system (radial or mesh), ensuring the detection of faults that cause voltage sags in a system according to the observability level raised. In the case of the optimal localization of sag monitors based on the criterion of correlation area (LOM+COR), several tests showed the following conclusions: - The procedure of LOM+COR method combines the implemented algorithms of voltage sag estimation (PEHT and PEHT+MP) with linear optimization techniques to define the optimal location of the sag monitors in a network. That is, the PEHT is used to generate the voltage sag pseudo-records, and, from the proposed optimization criterion (correlation area), the LOM+COR formulates and analytically calculates the optimal set of sag monitors of the network in the long term. From the information recorded by the optimal set of sag monitors, an accurate prediction of the voltage sag severity at all the busbars of the system is guaranteed with the PEHT+MP. - The LOM + COR method is shown to be a versatile optimization procedure, which reduces the size of the sag monitoring system both at radial as meshed grids. Due to its characteristics, this optimal location method allows emulation of complete system sag monitoring through the records of a small optimal set of sag monitors. Therefore, this new optimization method would be applicable to network operators that looks to reduce the installation and operation costs of the voltage sag monitoring system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nucleolar dominance is an epigenetic phenomenon in which one parental set of ribosomal RNA (rRNA) genes is silenced in an interspecific hybrid. In natural Arabidopsis suecica, an allotetraploid (amphidiploid) hybrid of Arabidopsis thaliana and Cardaminopsis arenosa, the A. thaliana rRNA genes are repressed. Interestingly, A. thaliana rRNA gene silencing is variable in synthetic Arabidopsis suecica F1 hybrids. Two generations are needed for A. thaliana rRNA genes to be silenced in all lines, revealing a species-biased direction but stochastic onset to nucleolar dominance. Backcrossing synthetic A. suecica to tetraploid A. thaliana yielded progeny with active A. thaliana rRNA genes and, in some cases, silenced C. arenosa rRNA genes, showing that the direction of dominance can be switched. The hypothesis that naturally dominant rRNA genes have a superior binding affinity for a limiting transcription factor is inconsistent with dominance switching. Inactivation of a species-specific transcription factor is argued against by showing that A. thaliana and C. arenosa rRNA genes can be expressed transiently in the other species. Transfected A. thaliana genes are also active in A. suecica protoplasts in which chromosomal A. thaliana genes are repressed. Collectively, these data suggest that nucleolar dominance is a chromosomal phenomenon that results in coordinate or cooperative silencing of rRNA genes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In cell culture, type alpha transforming growth factor (TGF-alpha) stimulates epithelial cell growth, whereas TGF-beta 1 overrides this stimulatory effect and is growth inhibitory. Transgenic mice that overexpress TGF-alpha under control of the mouse mammary tumor virus (MMTV) promoter/enhancer exhibit mammary ductal hyperplasia and stochastic development of mammary carcinomas, a process that can be accelerated by administration of the chemical carcinogen 7,12-dimethylbenz[a]anthracene. MMTV-TGF-beta 1 transgenic mice display mammary ductal hypoplasia and do not develop mammary tumors. We report that in crossbreeding experiments involving the production of mice carrying both the MMTV-TGF-beta 1 and MMTV-TGF-alpha transgenes, there is marked suppression of mammary tumor formation and that MMTV-TGF-beta 1 transgenic mice are resistant to 7,12-dimethylbenz[a]anthracene-induced mammary tumor formation. These data demonstrate that overexpression of TGF-beta 1 in vivo can markedly suppress mammary tumor development.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Experimental and theoretical studies have shown the importance of stochastic processes in genetic regulatory networks and cellular processes. Cellular networks and genetic circuits often involve small numbers of key proteins such as transcriptional factors and signaling proteins. In recent years stochastic models have been used successfully for studying noise in biological pathways, and stochastic modelling of biological systems has become a very important research field in computational biology. One of the challenge problems in this field is the reduction of the huge computing time in stochastic simulations. Based on the system of the mitogen-activated protein kinase cascade that is activated by epidermal growth factor, this work give a parallel implementation by using OpenMP and parallelism across the simulation. Special attention is paid to the independence of the generated random numbers in parallel computing, that is a key criterion for the success of stochastic simulations. Numerical results indicate that parallel computers can be used as an efficient tool for simulating the dynamics of large-scale genetic regulatory networks and cellular processes

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper is concerned with evaluating the performance of loss networks. Accurate determination of loss network performance can assist in the design and dimensioning of telecommunications networks. However, exact determination can be difficult and generally cannot be done in reasonable time. For these reasons there is much interest in developing fast and accurate approximations. We develop a reduced load approximation which improves on the famous Erlang fixed point approximation (EFPA) in a variety of circumstances. We illustrate our results with reference to a range of networks for which the EFPA may be expected to perform badly.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Several axi-symmetric EN3B steel components differing in shape and size were forged on a 100 ton joint knuckle press. A load cell fitted under the lower die inserts recorded the total deformation forces. Job parameters were measured off the billets and the forged parts. Slug temperatures were varied and two lubricants - aqueous colloidal graphite and oil - were used. An industrial study was also conducted to check the results of the laboratory experiments. Loads were measured (with calibrated extensometers attached to the press frames) when adequately heated mild steel slugs were being forged in finishing dies. Geometric parameters relating to the jobs and the dies were obtained from works drawings. All the variables considered in the laboratory study could not, however, be investigated without disrupting production. In spite of this obvious limitation, the study confirmed that parting area is the most significant geometric factor influencing the forging load. Multiple regression analyses of the laboratory and industrial results showed that die loads increase significantly with the weights and parting areas of press forged components, and with the width to thickness ratios of the flashes formed, but diminish with increasing slug temperatures and higher billet diameter to height ratios. The analyses also showed that more complicated parts require greater loads to forge them. Die stresses, due to applied axial loads, were investigated by the photoelastic method. The three dimensional frozen stress technique was employed. Model dies were machined from cast araldite cylinders, and the slug material was simulated with plasticene. Test samples were cut from the centres of the dies after the stress freezing. Examination of the samples, and subsequent calculations, showed that the highest stresses were developed in die outer corners. This observation partly explains why corner cracking occurs frequently in industrial forging dies. Investigation of die contact during the forging operation revealed the development of very high stresses.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The current state of knowledge and understanding of the long fatigue crack propagation behavior of nickel-base superalloys are reviewed, with particular emphasis on turbine disk materials. The data are presented in the form of crack growth rate versus stress intensity factor range curves, and the effects of such variables as microstructure, load ratio, and temperature in the near-threshold and Paris regimes of the curves, are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this article is to draw attention to calculations on the environmental effects of agriculture and to the definition of marginal agricultural yield. When calculating the environmental impacts of agricultural activities, the real environmental load generated by agriculture is not revealed properly through ecological footprint indicators, as the type of agricultural farming (thus the nature of the pollution it creates) is not incorporated in the calculation. It is commonly known that extensive farming uses relatively small amounts of labor and capital. It produces a lower yield per unit of land and thus requires more land than intensive farming practices to produce similar yields, so it has a larger crop and grazing footprint. However, intensive farms, to achieve higher yields, apply fertilizers, insecticides, herbicides, etc., and cultivation and harvesting are often mechanized. In this study, the focus is on highlighting the differences in the environmental impacts of extensive and intensive farming practices through a statistical analysis of the factors determining agricultural yield. A marginal function is constructed for the relation between chemical fertilizer use and yield per unit fertilizer input. Furthermore, a proposal is presented for how calculation of the yield factor could possibly be improved. The yield factor used in the calculation of biocapacity is not the marginal yield for a given area, but is calculated from the real and actual yields, and this way biocapacity and the ecological footprint for cropland are equivalent. Calculations for cropland biocapacity do not show the area needed for sustainable production, but rather the actual land area used for agricultural production. The proposal the authors present is a modification of the yield factor and also the changed biocapacity is calculated. The results of statistical analyses reveal the need for a clarification of the methodology for calculating marginal yield, which could clearly contribute to assessing the real environmental impacts of agriculture.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this article is to draw attention to calculations on the environmental effects of agriculture and to the definition of marginal agricultural yield. When calculating the environmental impacts of agricultural activities, the real environmental load generated by agriculture is not revealed properly through ecological footprint indicators, as the type of agricultural farming (thus the nature of the pollution it creates) is not incorporated in the calculation. It is commonly known that extensive farming uses relatively small amounts of labor and capital. It produces a lower yield per unit of land and thus requires more land than intensive farming practices to produce similar yields, so it has a larger crop and grazing footprint. However, intensive farms, to achieve higher yields, apply fertilizers, insecticides, herbicides, etc., and cultivation and harvesting are often mechanized. In this study, the focus is on highlighting the differences in the environmental impacts of extensive and intensive farming practices through a statistical analysis of the factors determining agricultural yield. A marginal function is constructed for the relation between chemical fertilizer use and yield per unit fertilizer input. Furthermore, a proposal is presented for how calculation of the yield factor could possibly be improved. The yield factor used in the calculation of biocapacity is not the marginal yield for a given area, but is calculated from the real and actual yields, and this way biocapacity and the ecological footprint for cropland are equivalent. Calculations for cropland biocapacity do not show the area needed for sustainable production, but rather the actual land area used for agricultural production. The proposal the authors present is a modification of the yield factor and also the changed biocapacity is calculated. The results of statistical analyses reveal the need for a clarification of the methodology for calculating marginal yield, which could clearly contribute to assessing the real environmental impacts of agriculture.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research is based on the premises that teams can be designed to optimize its performance, and appropriate team coordination is a significant factor to team outcome performance. Contingency theory argues that the effectiveness of a team depends on the right fit of the team design factors to the particular job at hand. Therefore, organizations need computational tools capable of predict the performance of different configurations of teams. This research created an agent-based model of teams called the Team Coordination Model (TCM). The TCM estimates the coordination load and performance of a team, based on its composition, coordination mechanisms, and job’s structural characteristics. The TCM can be used to determine the team’s design characteristics that most likely lead the team to achieve optimal performance. The TCM is implemented as an agent-based discrete-event simulation application built using JAVA and Cybele Pro agent architecture. The model implements the effect of individual team design factors on team processes, but the resulting performance emerges from the behavior of the agents. These team member agents use decision making, and explicit and implicit mechanisms to coordinate the job. The model validation included the comparison of the TCM’s results with statistics from a real team and with the results predicted by the team performance literature. An illustrative 26-1 fractional factorial experimental design demonstrates the application of the simulation model to the design of a team. The results from the ANOVA analysis have been used to recommend the combination of levels of the experimental factors that optimize the completion time for a team that runs sailboats races. This research main contribution to the team modeling literature is a model capable of simulating teams working on complex job environments. The TCM implements a stochastic job structure model capable of capturing some of the complexity not capture by current models. In a stochastic job structure, the tasks required to complete the job change during the team execution of the job. This research proposed three new types of dependencies between tasks required to model a job as a stochastic structure. These dependencies are conditional sequential, single-conditional sequential, and the merge dependencies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Lateral load distribution factor is a key factor for designing and analyzing curved steel I-girder bridges. In this dissertation, the effects of various parameters on moment and shear distribution for curved steel I-girder bridges were studied using the Finite Element Method (FEM). The parameters considered in the study were: radius of curvature, girder spacing, overhang, span length, number of girders, ratio of girder stiffness to overall bridge stiffness, slab thickness, girder longitudinal stiffness, cross frame spacing, and girder torsional inertia. The variations of these parameters were based on the statistical analysis of the real bridge database, which was created by extracting data from existing or newly designed curved steel I-girder bridge plans collected all over the nation. A hypothetical bridge superstructure model that was made of all the mean values of the data was created and used for the parameter study. ^ The study showed that cross frame spacing and girder torsional inertia had negligible effects. Other parameters had been identified as key parameters. Regression analysis was conducted based on the FEM analysis results and simplified formulas for predicting positive moment, negative moment, and shear distribution factors were developed. Thirty-three real bridges were analyzed using FEM to verify the formulas. The ratio of the distribution factor obtained from the formula to the one obtained from the FEM analysis, which was referred to as the g-ratio, was examined. The results showed that the standard deviation of the g-ratios was within 0.04 to 0.06 and the mean value of the g-ratios was greater than unity by one standard deviation. This indicates that the formulas are conservative in most cases but not overly conservative. The final formulas are similar in format to the current American Association of State Highway and Transportation Officials (AASHTO) Load Resistance and Factor Design (LRFD) specifications. ^ The developed formulas were compared with other simplified methods. The outcomes showed that the proposed formulas had the most accurate results among all methods. ^ The formulas developed in this study will assist bridge engineers and researchers in predicting the actual live load distribution in horizontally curved steel I-girder bridges. ^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Implicit in current design practice of minimum uplift capacity, is the assumption that the connection's capacity is proportional to the number of fasteners per connection joint. This assumption may overestimate the capacity of joints by a factor of two or more and maybe the cause of connection failures in extreme wind events. The current research serves to modify the current practice by proposing a realistic relationship between the number of fasteners and the capacity of the joint. The research is also aimed at further development of non-intrusive continuous load path (CLP) connection system using Glass Fiber Reinforced Polymer (GFRP) and epoxy. Suitable designs were developed for stud to top plate and gable end connections and tests were performed to evaluate the ultimate load, creep and fatigue behavior. The objective was to determine the performance of the connections under simulated sustained hurricane conditions. The performance of the new connections was satisfactory.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this dissertation, we develop a novel methodology for characterizing and simulating nonstationary, full-field, stochastic turbulent wind fields.

In this new method, nonstationarity is characterized and modeled via temporal coherence, which is quantified in the discrete frequency domain by probability distributions of the differences in phase between adjacent Fourier components.

The empirical distributions of the phase differences can also be extracted from measured data, and the resulting temporal coherence parameters can quantify the occurrence of nonstationarity in empirical wind data.

This dissertation (1) implements temporal coherence in a desktop turbulence simulator, (2) calibrates empirical temporal coherence models for four wind datasets, and (3) quantifies the increase in lifetime wind turbine loads caused by temporal coherence.

The four wind datasets were intentionally chosen from locations around the world so that they had significantly different ambient atmospheric conditions.

The prevalence of temporal coherence and its relationship to other standard wind parameters was modeled through empirical joint distributions (EJDs), which involved fitting marginal distributions and calculating correlations.

EJDs have the added benefit of being able to generate samples of wind parameters that reflect the characteristics of a particular site.

Lastly, to characterize the effect of temporal coherence on design loads, we created four models in the open-source wind turbine simulator FAST based on the \windpact turbines, fit response surfaces to them, and used the response surfaces to calculate lifetime turbine responses to wind fields simulated with and without temporal coherence.

The training data for the response surfaces was generated from exhaustive FAST simulations that were run on the high-performance computing (HPC) facilities at the National Renewable Energy Laboratory.

This process was repeated for wind field parameters drawn from the empirical distributions and for wind samples drawn using the recommended procedure in the wind turbine design standard \iec.

The effect of temporal coherence was calculated as a percent increase in the lifetime load over the base value with no temporal coherence.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Energy efficiency improvement has been a key objective of China’s long-term energy policy. In this paper, we derive single-factor technical energy efficiency (abbreviated as energy efficiency) in China from multi-factor efficiency estimated by means of a translog production function and a stochastic frontier model on the basis of panel data on 29 Chinese provinces over the period 2003–2011. We find that average energy efficiency has been increasing over the research period and that the provinces with the highest energy efficiency are at the east coast and the ones with the lowest in the west, with an intermediate corridor in between. In the analysis of the determinants of energy efficiency by means of a spatial Durbin error model both factors in the own province and in first-order neighboring provinces are considered. Per capita income in the own province has a positive effect. Furthermore, foreign direct investment and population density in the own province and in neighboring provinces have positive effects, whereas the share of state-owned enterprises in Gross Provincial Product in the own province and in neighboring provinces has negative effects. From the analysis it follows that inflow of foreign direct investment and reform of state-owned enterprises are important policy handles.