187 resultados para hydropower


Relevância:

10.00% 10.00%

Publicador:

Resumo:

For over 100 years, water policy and man­ agement in Spain have been instruments of economic and social transformation. Sig­ nificant public and private investments in water supply infrastructures have equipped Spain with over 1,200 major dams, 20 major desalination plants ? with more under construction ? and several inter­basin water transfers. The system has been apparently very successful, with an increase in overall water availability, strong associated eco­ nomic development and few urban water supply shortages. This success has been supported by a widespread consensus among a strong and largely closed water policy community made up of water manag­ ers, irrigators, electric (hydropower) utilities and developers.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Esta tesis realiza una contribución metodológica al problema de la gestión óptima de embalses hidroeléctricos durante eventos de avenidas, considerando un enfoque estocástico y multiobjetivo. Para ello se propone una metodología de evaluación de estrategias de laminación en un contexto probabilístico y multiobjetivo. Además se desarrolla un entorno dinámico de laminación en tiempo real con pronósticos que combina un modelo de optimización y algoritmos de simulación. Estas herramientas asisten a los gestores de las presas en la toma de decisión respecto de cuál es la operación más adecuada del embalse. Luego de una detallada revisión de la bibliografía, se observó que los trabajos en el ámbito de la gestión óptima de embalses en avenidas utilizan, en general, un número reducido de series de caudales o hidrogramas para caracterizar los posibles escenarios. Limitando el funcionamiento satisfactorio de un modelo determinado a situaciones hidrológicas similares. Por otra parte, la mayoría de estudios disponibles en este ámbito abordan el problema de la laminación en embalses multipropósito durante la temporada de avenidas, con varios meses de duración. Estas características difieren de la realidad de la gestión de embalses en España. Con los avances computacionales en materia de gestión de información en tiempo real, se observó una tendencia a la implementación de herramientas de operación en tiempo real con pronósticos para determinar la operación a corto plazo (involucrando el control de avenidas). La metodología de evaluación de estrategias propuesta en esta tesis se basa en determinar el comportamiento de éstas frente a un espectro de avenidas características de la solicitación hidrológica. Con ese fin, se combina un sistema de evaluación mediante indicadores y un entorno de generación estocástica de avenidas, obteniéndose un sistema implícitamente estocástico. El sistema de evaluación consta de tres etapas: caracterización, síntesis y comparación, a fin de poder manejar la compleja estructura de datos resultante y realizar la evaluación. En la primera etapa se definen variables de caracterización, vinculadas a los aspectos que se quieren evaluar (seguridad de la presa, control de inundaciones, generación de energía, etc.). Estas variables caracterizan el comportamiento del modelo para un aspecto y evento determinado. En la segunda etapa, la información de estas variables se sintetiza en un conjunto de indicadores, lo más reducido posible. Finalmente, la comparación se lleva a cabo a partir de la comparación de esos indicadores, bien sea mediante la agregación de dichos objetivos en un indicador único, o bien mediante la aplicación del criterio de dominancia de Pareto obteniéndose un conjunto de soluciones aptas. Esta metodología se aplicó para calibrar los parámetros de un modelo de optimización de embalse en laminación y su comparación con otra regla de operación, mediante el enfoque por agregación. Luego se amplió la metodología para evaluar y comparar reglas de operación existentes para el control de avenidas en embalses hidroeléctricos, utilizando el criterio de dominancia. La versatilidad de la metodología permite otras aplicaciones, tales como la determinación de niveles o volúmenes de seguridad, o la selección de las dimensiones del aliviadero entre varias alternativas. Por su parte, el entorno dinámico de laminación al presentar un enfoque combinado de optimización-simulación, permite aprovechar las ventajas de ambos tipos de modelos, facilitando la interacción con los operadores de las presas. Se mejoran los resultados respecto de los obtenidos con una regla de operación reactiva, aun cuando los pronósticos se desvían considerablemente del hidrograma real. Esto contribuye a reducir la tan mencionada brecha entre el desarrollo teórico y la aplicación práctica asociada a los modelos de gestión óptima de embalses. This thesis presents a methodological contribution to address the problem about how to operate a hydropower reservoir during floods in order to achieve an optimal management considering a multiobjective and stochastic approach. A methodology is proposed to assess the flood control strategies in a multiobjective and probabilistic framework. Additionally, a dynamic flood control environ was developed for real-time operation, including forecasts. This dynamic platform combines simulation and optimization models. These tools may assist to dam managers in the decision making process, regarding the most appropriate reservoir operation to be implemented. After a detailed review of the bibliography, it was observed that most of the existing studies in the sphere of flood control reservoir operation consider a reduce number of hydrographs to characterize the reservoir inflows. Consequently, the adequate functioning of a certain strategy may be limited to similar hydrologic scenarios. In the other hand, most of the works in this context tackle the problem of multipurpose flood control operation considering the entire flood season, lasting some months. These considerations differ from the real necessity in the Spanish context. The implementation of real-time reservoir operation is gaining popularity due to computational advances and improvements in real-time data management. The methodology proposed in this thesis for assessing the strategies is based on determining their behavior for a wide range of floods, which are representative of the hydrological forcing of the dam. An evaluation algorithm is combined with a stochastic flood generation system to obtain an implicit stochastic analysis framework. The evaluation system consists in three stages: characterizing, synthesizing and comparing, in order to handle the complex structure of results and, finally, conduct the evaluation process. In the first stage some characterization variables are defined. These variables should be related to the different aspects to be evaluated (such as dam safety, flood protection, hydropower, etc.). Each of these variables characterizes the behavior of a certain operating strategy for a given aspect and event. In the second stage this information is synthesized obtaining a reduced group of indicators or objective functions. Finally, the indicators are compared by means of an aggregated approach or by a dominance criterion approach. In the first case, a single optimum solution may be achieved. However in the second case, a set of good solutions is obtained. This methodology was applied for calibrating the parameters of a flood control model and to compare it with other operating policy, using an aggregated method. After that, the methodology was extent to assess and compared some existing hydropower reservoir flood control operation, considering the Pareto approach. The versatility of the method allows many other applications, such as determining the safety levels, defining the spillways characteristics, among others. The dynamic framework for flood control combines optimization and simulation models, exploiting the advantages of both techniques. This facilitates the interaction between dam operators and the model. Improvements are obtained applying this system when compared with a reactive operating policy, even if the forecasts deviate significantly from the observed hydrograph. This approach contributes to reduce the gap between the theoretical development in the field of reservoir management and its practical applications.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

En los últimos años ha aumentado el interés en el desarrollo de proyectos en el ámbito de las centrales hidroeléctricas y en concreto en las centrales reversibles. Estas centrales están diseñadas para grandes caudales y saltos, lo cual conlleva túneles de gran diámetro y alta presión y a menudo son esquemas subterráneos. Por ello, los estudios relativos a revestimientos de túneles en presión y los referentes a los blindajes de acero han cobrado una mayor relevancia. En las décadas de los 60 y 70 se realizó una importante labor de investigación coincidiendo con el desarrollo hidroeléctrico en Europa y Norteamérica, que sin embargo ha quedado sin continuidad hasta esta década, en la que se ha experimentado un impulso debido al desarrollo de nuevos proyectos hidroeléctricos de gran magnitud. La adecuación de los métodos de cálculo de blindajes supone una herramienta imprescindible en el correcto desarrollo técnico de los nuevos proyectos hidroeléctricos, así como para la evaluación de la seguridad de los saltos hidroeléctricos existentes en operación. En la presente Tesis se realiza un análisis del comportamiento estructural de las galerías en presión de saltos hidroeléctricos, así como una discusión y revisión de los métodos de cálculo existentes. En concreto se analizan los siguientes aspectos: •Descripción y comparación de las formulaciones existentes para el cálculo de blindajes tanto a presión exterior como interior. •Aplicación del Método de Elementos Finitos para la modelización y cálculo resistente y frente a inestabilidad de blindajes sometidos a presión exterior. •Análisis de un caso real, en el que se ha producido un fallo estructural en un blindaje sometido a presión exterior. Discusión sobre el comportamiento de blindajes con rigidizadores. Estudio paramétrico de la capacidad resistente y de la estabilidad de los blindajes con rigidizadores. •Estudio del comportamiento diferenciado entre un rigidizador y un conector. •Detalles constructivos y de durabilidad de las galerías en presión. •Desarrollo de una metodología para el cálculo de blindajes y tuberías forzadas a fatiga derivada de las variaciones de presión de la conducción. •Análisis de un caso real de una tubería forzada sometida a procesos de variación de carga, evaluando su seguridad frente a la fatiga. El cálculo de blindajes en galerías forzadas presenta una serie de aspectos complejos, y que no permiten la definición del problema con exactitud, tales como las características del macizo rocoso y su permeabilidad, la determinación del nivel freático, la holgura existente entre el blindaje y el revestimiento del trasdós y sus posibles defectos geométricos. Por estas incertidumbres, el cálculo de blindajes supone una materia compleja y que debe ser abordada desde la cautela y el análisis de otros trabajos y/o análisis realizados con anterioridad. En cualquier caso, debe realizarse un análisis de sensibilidad de los diversos parámetros que intervienen en el cálculo. En esta tesis se han descrito las principales formulaciones de cálculo de blindajes de galerías forzadas sometidas a presión interior y exterior; se ha constatado que existe una gran diversidad y que de su aplicación no se llega a resultados concluyentes. Las formulaciones clásicas utilizadas en el cálculo de blindajes lisos y con rigidizadores sometidos a presión exterior (Amstutz y Jacobsen) no resultan del todo adecuadas ni son de aplicación general. Además, pueden arrojar resultados no conservadores o conducir a un sobredimensionamiento del blindaje en otros casos. En las formulaciones tradicionales de diseño se han tenido en cuenta como imperfecciones la holgura del blindaje y la ovalidad del mismo. En la presente tesis, se han analizado imperfecciones de tipo ondulatorio derivadas de los procesos de soldadura y la existencia de espesores reducidos en zonas de corrosión. En el caso práctico analizado sometido a presión exterior, se ha comprobado el funcionamiento real del blindaje mediante los modelos realizados con elementos finitos. Se desprende que los rigidizadores no han funcionado como tales, puesto que para blindajes lisos se obtienen presiones más bajas de pandeo y para el caso de funcionamiento correcto de los rigidizadores se habría obtenido un coeficiente de seguridad suficiente. Por este motivo, se ha analizado el posible funcionamiento de los rigidizadores, que en determinados casos pueden actuar como conectores. En estos casos deben dimensionarse de forma adecuada las soldaduras para soportar las tensiones entre chapa y conector. Por otra parte, tradicionalmente no se han tenido en cuenta los efectos de fatiga que pueden ocasionar los golpes de ariete y las pulsaciones de presión debidas a la regulación secundaria de la red. En esta tesis se ha establecido un procedimiento de comprobación de tuberías forzadas y blindajes sometidos a procesos de fatiga. Adicionalmente, se ha estudiado el caso real de las tuberías forzadas de una central reversible real (Bolarque II) en funcionamiento de regulación secundaria. Se ha concluido, como en otros casos analizados en la bibliografía, que las pulsaciones derivadas de la regulación secundaria no son significativas como para tener en cuenta la fatiga del acero. Por otra parte, las maniobras de arranque y parada (golpe de ariete) suponen una variación importante de la presión en la conducción. Sin embargo, el moderado número de ciclos permite asegurar la integridad de la tubería frente a fenómenos de fatiga. Nowadays, there is a significant concern in the development of projects in the field of hydroelectric power plants, particularly in the pump-storage projects. These plants are designed for high flow rates and heads, which entails large-diameter tunnels and high pressure ratios), and often as underground schemes. Therefore, this concern has reactivated studies about penstocks and in particular those related to steel liners. During the 1960s and 1970s due to hydropower-engineering development in Europe and North America, a major research effort was done. However, the increasing development of new large-scale hydropower projects has involved a renewed research effort during this decade. The adequacy of steel liner calculation methods is a very important issue in the proper technical development of new hydroelectric projects, and for the safety assessment of existing hydroelectric power plants in operation. In this work, an analysis of the structural behavior of pressure galleries in hydroelectric schemes was carried out. Also, a discussion and a review of existing calculation methods are included. In particular, the following issues have been considered: •Description and comparison of existing formulations for calculating the liner response to both external and internal pressure. •Analysis of an actual case study of a steel liner which failed due to external pressure. •Application of the Finite Element Method to liner modeling and analysis subjected to external pressure. •A parametric study of the shielding with stiffeners and discussion about the behavior of liner with stiffeners. •Constructive aspects and durability of pressure galleries. •Development of a methodology for estimating fatigue effects on penstocks and liners sue to pressure changes. •Analysis of an actual case study of a penstock under varying load and assessment of its safety against fatigue. The project of a hydropower penstock is a complex issue, due to the uncertainties in the definition of the problem data, such as the characteristics of the rock mass and its permeability, the determination of the water table, the existing gap between the steel liner and the concrete of the backfill, the geometric imperfections... Hence, the design and analysis of a steel liner must be addressed cautiously and take into account a review of previous studies performed. Ever, a sensitivity analysis of the various parameters involved in the calculation should be performed. In this work, some of the most relevant formulations for liner design subjected to inside and outside pressure have been studied. As a whole, there is a wide variety and its application does not lead to conclusive results. The classical formulations used in the steel liner calculation either with or without stiffeners under external pressure (Amstutz and Jacobsen) are not entirely adequate Also, those can yield both conservative and non-conservative results in large ranges of application. Traditionally design approaches only considered initial gap and ovality as the most relevant geometric imperfections. Thus, little attention was paid to those caused either by welding or by thickness loss in corroded areas. In the case study analyzed in this thesis, the actual working of the liner under external pressure has been simulated by the Finite Element Method. Results show that the stiffeners have not performed as such, since for unstiffened liner lower buckling pressures are obtained and for proper performance of the stiffeners would give a sufficient safety factor. Hence, it must be pointed out that stiffeners may perform either as such or as connectors. For the latter, welding must be designed to properly withstand stresses between the shell and the stiffener. Likewise, the potential fatigue effects due to both water hammer and pressure pulsations due to secondary regulation of the network have not been considered in many studies. It has been included in this work a procedure for checking penstocks and liners under fatigue processes. Additionally, the penstock fatigue response of an actual pump storage project (Bolarque II, Spain) subjected to secondary control operation has been assessed. As in other cases discussed in the literature, pulsations derived from the secondary control are not significant to account for fatigue of steel. Moreover, the start and stop manoeuvres (water hammer) cause a significant change in penstock pressure. However, the moderate number of cycles ensures the integrity of the penstock against fatigue phenomena.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Europe needs to restructure its energy system. The aim to decrease the reliance on fossil fuels to a higher dependence on renewable energy has now been imposed by The European Commission. In order to achieve this goal there is a great interest in Norway to become "The Green Battery of Europe". In the pursuit of this goal a GIS-tool was created to investigate the pump storage potential in Norway. The tool searches for possible connections between existing reservoirs and dams with the criteria selected by the user. The aim of this thesis was to test the tool and see if the results suggested were plausible, develop a cost calculation method for the PSH lines, and make suggestions for further development of the tool. During the process the tool presented many non-feasible pumped storage hydropower (PSH) connections. The area of Telemark was chosen for the more detailed study. The results were discussed and some improvements were suggested for further development of the tool. Also a sensitivity test was done to see which of the parameters set by the user are the most relevant for the PSH connection suggestion. From a range of the most promising PSH plants suggested by the tool, the one between Songavatn and Totak was chosen for a case study, where there already exists a power plant between both reservoirs. A new Pumped Storage Plant was designed with a power production of 1200 MW. There are still many topics open to discussion, such as how to deal with environmental restrictions, or how to deal with inflows and outflows of the reservoirs from the existing power plants. Consequently the GIS-tool can be a very useful tool to establish the best possible connections between existing reservoirs and dams, but it still needs a deep study and the creation of new parameters for the user.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The recognition of the relevance of energy, especially of the renewable energies generated by the sun, water, wind, tides, modern biomass or thermal is growing significantly in the global society based on the possibility it has to improve societies′ quality of life, to support poverty reduction and sustainable development. Renewable energy, and mainly the energy generated by large hydropower generation projects that supply most of the renewable energy consumed by developing countries, requires many technical, legal, financial and social complex processes sustained by innovations and valuable knowledge. Besides these efforts, renewable energy requires a solid infrastructure to generate and distribute the energy resources needed to solve the basic needs of society. This demands a proper construction performance to deliver the energy projects planned according to specifications and respecting environmental and social concerns, which implies the observance of sustainable construction guidelines. But construction projects are complex and demanding and frequently face time and cost overruns that may cause negative impacts on the initial planning and thus on society. The renewable energy issue and the large renewable energy power generation and distribution projects are particularly significant for developing countries and for Latin America in particular, as this region concentrates an important hydropower potential and installed capacity. Using as references the performance of Venezuelan large hydropower generation projects and the Guri dam construction, this research evaluates the tight relationship existing between sustainable construction and knowledge management and their impact to achieve sustainability goals. The knowledge management processes are proposed as a basic strategy to allow learning from successes and failures obtained in previous projects and transform the enhancement opportunites into actions to improve the performance of the renewable energy power generation and distribution projects.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

En el artículo se discute el papel de la energía hidroeléctrica en el marco del sistema eléctrico español, donde existe una elevada penetración de energías no gestionables con una tendencia clara a aumentar en los próximos años. El desarrollo de nuevas centrales hidroeléctricas se basará probablemente en centrales reversibles. La energía hidroeléctrica es una tecnología madura y eficiente para el almacenamiento de energía a gran escala y contribuye por tanto de manera decisiva a la integración de fuentes renovables no gestionables. Los beneficios obtenidos con la operación punta-valle pueden ser insuficientes para compensar el coste de una nueva central. Sin embargo, los ingresos obtenidos pueden incrementarse sustancialmente mediante su participación en los servicios de ajuste del sistema. Ello requeriría un diseño apropiado del mercado eléctrico. La contribución de las centrales hidráulicas reversibles al balance producción-consumo puede extenderse a las horas valle utilizando, bien bombeo en velocidad variable o bien una configuración de cortocircuito hidráulico. La necesidad de mitigar los efectos hidrológicos aguas abajo de las centrales hidroeléctricas puede introducir algunas restricciones en la operación que limitaría de algún modo los servicios descritos más arriba. Sin embargo, cabe esperar que los efectos ambientales provocados por las centrales hidráulicas reversibles sean significativamente menores. In this paper the role of hydropower in electric power systems is discussed, in the framework of the Spanish system, where a high penetration of intermittent power sources exists, showing a clear trend to increase in next years. The development of new hydro power facilities will be likely based on pumped storage hydro power plants. Hydropower is a mature and efficient technology for large-scale energy storage and therefore represents a key contribution for the integration of intermittent power sources, such as wind or photovoltaic. The benefits obtained from load shifting may be insufficient to compensate the costs of a new plant. However, the obtained revenues can significantly increase through its contribution to providing ancillary services. This would require an appropriate design of the electricity market. The contribution of pumped storage hydro power plants to balancing services can be extended to off-peak hours, using either variable speed pumping or the hydraulic shortcircuit configuration. The need to mitigate hydrological effects downstream of hydro plants may introduce some operational constraints which could limit to some extent the services described above. However environmental effects caused by pumped storage hydro power plants are expected to be significantly smaller.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

La energía basada en turbinas hidráulicas de reducida potencia es, a menudo, un ejemplo- modelo dentro del campo de las energías renovables desde su aparición a finales del S. XIX, aunque los ingenios precursores surgen mucho antes. Entre los testimonios más antiguos destacan la saqia o rueda persa y la rueda hidráulica romana que había sido previamente implementada en Extremo Oriente, y que después llega a Europa a través de Egipto. Más tarde, durante la Edad Media y el Renacimiento, se generaliza el uso de los molinos hidráulicos, además de los eólicos. Ejemplos de ello son las norias de Alepo (Siria) y de Córdoba (España). Otro caso interesante es el de los molinos de regolfo en la Península Ibérica e Iberoamérica, muy cercanos en su forma y fundamentos a las turbinas hidráulicas. Algunos de estos ingenios siguen activos en los ríos de España. Posteriormente los estudios de Euler, Burdin y Fourneyron prepararon las bases para el definitivo avance de Pelton, Kaplan, Francis, y otros, pero ya como máquinas motrices de los generadores eléctricos. En la actualidad, se admite como límite superior para minihidráulica aquellas centrales con una potencia instalada de 5000 kW, y considerando que cuando las potencias son inferiores a 100 kW se denomina micro hidráulica, aunque en Latinoamérica este límite se fija en 20 kW. El estudio del recurso hídrico, ayudado del geotécnico, constituyen la base sobre la que podremos proyectar el aprovechamiento hidroeléctrico: selección del tipo de central dentro de la tipología disponible, diseño y cálculos de la turbina, obra civil necesaria (azud, presa, canal, tubería forzada, edificio, aspiración, desagüe, etc.) y equipo electromecánico. El proyecto tecnológico se complementa con el estudio de impacto ambiental y de viabilidad económica. Muchos de estos proyectos tratan de reducir la falta de acceso a la energía en poblaciones desfavorecidas, entendida esta carencia como un factor determinante de la pobreza. Así la energía mini y micro-hidráulica adquiere un nuevo valor como tecnología para el desarrollo humano.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Study of the behaviour of CFRD (concrete face rockfill dams) founded on active faults. It is generally accepted that embankment dams founded on active faults exhibit good behaviour during the rupture of a fault, whereas concrete gravity dams may be more seriously affected if significant differential movements occur at their foundations. However, experience with CFRDs subjected to fault displacements at their foundation is limited and therefore it is important to analyse the likely response of CFRDs in such a scenario.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

El examen a la singular aportación de João Archer, Nunes de Almeida y Rogério Ramos a la construcción del paisaje energético a través de la arquitectura se revela hoy de gran oportunidad para el avance de nuestra disciplina. Este colectivo de arquitectos que estudian en la Escuela de Oporto en el periodo en que el maestro Carlos Ramos realiza la reforma de la enseñanza de la Arquitectura en Portugal, proyecta y construye desde el interior del oficio de proyectos de la Hidroeléctica do Douro, las tres infraestructuras hidroeléctricas y las respectivas estructuras urbanas de Picote, Miranda y Bemposta, ubicadas en el Duero Internacional. El proceso cuyos parámetros de proyecto se exponen, está comprendido entre 1953 y 1964, y representa uno de los momentos más significativos y hercúleos en términos de infraestructura, industrialización y modernización de un Portugal entonces extremamente retrasado por la política de aislamiento de la dictadura de Salazar. Esto parece ser también el primer proyecto arquitectónico de infraestructuras a la escala del territorio en el cual se reconocen trazos específicos de la Escuela de Oporto y en donde se efectúa la revisión y transición de una modernidad enmarcada por el rigor de Loos y por un racionalismo de linaje gropiano, para un regionalismo crítico apropiado a la cultura del lugar, muy vinculado a Lúcio Costa, Wright y Aalto. Así, más que los logros espaciales, técnicos o constructivos conseguidos en los edificios, se expone el proceso utilizado por sus autores, su forma de entender y hacer un paisaje industrial de dimensión social y humanista a través de una arquitectura poética y minimalista sustentada en la cultura y en el carácter del lugar, valorando los argumentos, herramientas, principios y mecanismos que pueden constituirse referencia para nuestro oficio y aportar conocimiento que oriente la arquitectura hacia la construcción del paisaje contemporáneo. ABSTRACT Examining the singular contribution of João Archer, Nunes de Almeida and Rogério Ramos to the construction of the energy landscape through architecture, presents today a great opportunity for the advancement of our discipline. This collective of architects studying at the Porto School during the period in which master Carlos Ramos reformed the education of architecture in Portugal, designed and built from the Hidroeléctrica do Douro project office itself, the three hydropower infrastructures and the respective urban structures of Picote), Miranda and Bemposta, located in the International Douro. The project parameters are set between 1953 and 1964, representing one of the most significant moments of infrastructure, industrialization and modernization in a country at the time extremely delayed by the isolation resulting from the Salazar dictatorship. This is also the first architectural project of infrastructures within the scale of territory in which specific traits of the Porto School are recognized and wherein it came into effect the revision and transition from a modernity marked by the Loos rigor and Gropius rationalism lineage to a critical regionalism appropriate to the culture of the place, connected to Lúcio Costa, Wright and Aalto. Thus, rather than space, technical or constructive achievements of the buildings, it is exposed the process used by the authors, their way of understanding and projecting an industrial landscape with a social and humanistic dimension through a poetic and minimal architecture sustained in culture and character of the place, valuing arguments, tools, principles and mechanisms that can become a reference for our profession and provide knowledge to guide architecture towards the construction of the contemporary landscape.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper studies the impact that different approaches of modeling the real-time use of the secondary regulation reserves have in the joint energy and reserve hourly scheduling of a price-taker pumped-storage hydropower plant. The unexpected imbalance costs due to the error between the forecasted real-time use of the reserves and the actual value are also studied and evaluated for the different approaches. The proposed methodology is applied to a daily-cycle and closed-loop pumped-storage hydropower plant. Preliminary results show that the deviations in the water volume at the end of the day are important when the percentage of the real-time use of reserves is unknown in advance, and also that the total income in all approaches after correcting these deviations is significantly lower than the maximum theoretical income.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

No Brasil, cerca de dois terços da capacidade total instalada de geração de energia elétrica e, em média nos últimos quinze anos, aproximadamente 90% da geração efetiva provêm das hidrelétricas. Este sistema inclui 170 usinas hidrelétricas de médio e grande porte existentes ou previstas até 2023, aproximadamente dois terços delas com capacidade de regularizar vazões e todas operando de maneira interligada. Restrições ambientais, técnicas, sociais e econômicas tem dificultado cada vez mais a implantação de empreendimentos hidráulicos contendo reservatórios de grande porte, tornando a maioria dos novos empreendimentos a fio d´água. Para compreender melhor o processo, este trabalho apresenta um levantamento da evolução anual da capacidade instalada e de armazenamento do sistema desde 1950 até a expansão prevista nos próximos 8 anos, em 2023. Os dados da década de 2000 e a previsão até 2023 de forma ainda mais acentuada indicam uma redução continua e significativa da capacidade relativa de regularização, com impacto direto nas decisões de operação e de expansão do sistema térmico complementar. A fim de avaliar as possíveis consequências da redução da capacidade de regularização, simulações foram realizadas no modelo HIDROTERM (ZAMBON et al. 2012); os resultados apontam para uma necessidade de ser complementar continuamente a energia hídrica, não só em períodos hidrologicamente desfavoráveis.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A geração de energia hidrelétrica enfrenta uma crescente restrição a sua expansão, diretamente relacionada a fatores ambientais e da limitação de terrenos com potencial economicamente aproveitável. A partir deste fato, é relacionada uma possível fonte de energia hidrelétrica, resultante do aproveitamento dos potenciais presentes na rede de distribuição de água das cidades, ainda sem nenhum aproveitamento. O desenvolvimento desta fonte de energia se dá com a instalação de mini e micro centrais hidrelétricas nos condutos da rede distribuidora de água. Este trabalho tem por objetivo avaliar o potencial de aproveitamento hidrelétrico por mini e micro hidrelétricas por meio de técnicas de modelagem e de otimização, para agilizar e facilitar o procedimento de identificação dos potenciais e a instalação na rede de abastecimento. O trabalho leva em conta as diversas peculiaridades das redes de distribuição de água e dos equipamentos eletro-hidráulicos, discorrendo sobre a possível complementariedade da geração de energia durante os picos de consumo. Discorre também sobre a contribuição para a rede de distribuição elétrica, na logística e nos custos de implantação além de discutir a tipologia das turbinas capazes de aproveitar o potencial energético. É avaliado, com o auxilio de modelos hidráulicos e de otimização, o posicionamento das centrais geradoras na rede e os possíveis benefícios, restrições e impedimentos ao seu uso, desenvolvendo uma metodologia para facilitar a tomada de decisão quanto ao aproveitamento para geração, ou não, em redes diversas. A construção deste procedimento e ferramenta são desenvolvidos a partir do estudo de caso do sistema distribuidor de água do Município de Piquete no estado de São Paulo, Brasil.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O objeto deste trabalho é a análise do aproveitamento múltiplo do reservatório de Barra Bonita, localizado na confluência entre os rios Piracicaba e Tietê, no estado de São Paulo e pertencente ao chamado sistema Tietê-Paraná. Será realizada a otimização da operação do reservatório, através de programação linear, com o objetivo de aumentar a geração de energia elétrica, através da maximização da vazão turbinada. Em seguida, a partir dos resultados da otimização da geração de energia, serão utilizadas técnicas de simulação computacional, para se obter índices de desempenho conhecidos como confiabilidade, resiliência e vulnerabilidade, além de outros fornecidos pelo próprio modelo de simulação a ser utilizado. Estes índices auxiliam a avaliação da freqüência, magnitude e duração dos possíveis conflitos existentes. Serão analisados os possíveis conflitos entre a navegação, o armazenamento no reservatório, a geração de energia e a ocorrência de enchentes na cidade de Barra Bonita, localizada a jusante da barragem.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As threatened and endangered species, wild Pacific salmon are in peril. This paper discusses the differences of the five species of wild Pacific salmon. As salmon go through several stages of their lifecycles, they face a myriad of threats to their existence. Threats from humans in the form of hydropower dams, habitat destruction, harvesting issues, and hatcheries are explained. A draft recovery plan for salmon in the Puget Sound area of Washington State is used as a case study. Strengths and weaknesses of this plan are discussed. The paper then discusses the need for growth management laws supporting salmon habitat and a change in individual behaviors if wild Pacific salmon sustainability is to become a reality.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper defines a sustainable energy plan to provide the basis for renewable energy initiatives that will increase energy security, reduce negative economic impacts and provide a cleaner environment. The hotel, agriculture, transportation, construction, utility, government and private sectors will play pivotal roles in achieving targets and will see significant gains. Government policies, educational campaigns and financial incentives will be required to facilitate and encourage renewable energy development and entrepreneurship. Utilization of solar energy, energy conservation measures and the use of efficient and alternative fuel vehicles by the commercial/industrial and private sectors will be crucial in meeting targets. The utility company will be charged with developing large scale renewable energy applications and with improving efficiency of the electrical system.