948 resultados para deterministic safety analysis
Resumo:
Public Private Partnerships (PPPs) are mostly implemented to circumvent budgetary constraints, and to encourage efficiency and quality in the provision of public infrastructure in order to reach social welfare. One of the ways of reaching the latter objective is by the introduction of performance based standards tied to bonuses and penalties to reward or punish the performance of the contractor. This paper focuses on the implementation of safety based incentives in PPPs in such a way that the better the safety outcome the greater larger will be the economic reward to the contractor. The main aim of this paper is to identify whether the incentives to improve road safety in PPPs are ultimately effective in improving safety ratios in Spain. To that end, Poisson and negative binomial regression models have been applied using information of motorways of the Spanish network of 2006. The findings indicate that even though road safety is highly influenced by variables that are not much controllable by the contractor such as the Average Annual Daily Traffic and the percentage of heavy vehicles, the implementation of safety incentives in PPPs has a positive influence in the reduction of fatalities, injuries and accidents.
Resumo:
Public Private Partnerships (PPPs) are mostly implemented for three reasons: to circumvent budgetary constraints, encourage efficiency and improvement of quality in the provision of public infrastructure. One of the ways of reaching the latter objective is by the introduction of performance-based standards tied to bonuses and penalties to reward or punish the performance of the contractor. These performance based standards often refer to different aspects such as technical, environmental and safety issues. This paper focuses on the implementation of safety based incentives in PPPs. The main aim of this paper is to analyze whether the incentives to improve road safety in PPPs are effective in improving safety ratios in Spain. To this end, negative binomial regression models have been applied using information from the Spanish high capacity network in 2006. The findings indicate that even though road safety is highly influenced by variables that are not much controllable by the contractor such as the Average Annual Daily Traffic and the percentage of heavy vehicles in the highway, the implementation of safety incentives in PPPs has a positive influence in the reduction of fatalities, injuries and accidents.
Resumo:
OUTLINE: • Introduction • Experimental Setup • Experimental Procedure • Experimental Results - Surface Roughness - Residual Stresses - Friction - Wear - EDX • Conclusions
Resumo:
Public Private Partnerships (PPPs) are mostly implemented for three reasons: to circumvent budgetary constraints, encourage efficiency and improvement of quality in the provision of public infrastructure. One of the ways of reaching the latter objective is by the introduction of performance-based standards tied to bonuses and penalties to reward or punish the performance of the contractor. These performance based standards often refer to different aspects such as technical, environmental and safety issues. This paper focuses on the implementation of safety based incentives in PPPs. The main aim of this paper is to analyze whether the incentives to improve road safety in PPPs are effective in improving safety ratios in Spain. To this end, negative binomial regression models have been applied using information from the Spanish high capacity network in 2006. The findings indicate that even though road safety is highly influenced by variables that are not much controllable by the contractor such as the Average Annual Daily Traffic and the percentage of heavy vehicles in the highway, the implementation of safety incentives in PPPs has a positive influence in the reduction of fatalities, injuries and accidents.
Resumo:
En este artículo se recoge cómo se ha regulado este aspecto tradicionalmente en concesiones y cómo se viene haciendo más recientemente, comparando para tres concesiones europeas puestas en servicio en los últimos años, las bonificaciones con el beneficio social que corresponden a cada nivel de reducción de la accidentalidad en la carretera. Los resultados arrojan que los incentivos aplicados, tanto antiguamente como los más recientes, son anodinos por dos motivos: porque son muy inferiores al beneficio social derivado de ellos y porque aparentemente son muy inferiores al coste de las actuaciones de mejora de la seguridad vial. Road safety is one of the most important issues in PPP roads. At this respect, to achieve a property regulation it is necessary to introduce objective and explicit incentives in the contracts. Besides, these incentives must be focused at the net social benefit. This paper explains how road safety has been introduced traditionally in PPP road contracts and how it is been doing it nowadays, comparing for three recent concessions of Europe, the bonuses and the social benefit associated to each reduction of accidents in the roads. As a result, it can be affirmed that the incentives applied, both traditional and the most ones, are unremarkable for two reasons: because they are much lower than the social benefit derived from them and because they apparently are well below the cost of measures to improve road safety.
Resumo:
(ENG) IDPSA (Integrated Deterministic-Probabilistic Safety Assessment) is a family of methods which use tightly coupled probabilistic and deterministic approaches to address respective sources of uncertainties, enabling Risk informed decision making in a consistent manner. The starting point of the IDPSA framework is that safety justification must be based on the coupling of deterministic (consequences) and probabilistic (frequency) considerations to address the mutual interactions between stochastic disturbances (e.g. failures of the equipment, human actions, stochastic physical phenomena) and deterministic response of the plant (i.e. transients). This paper gives a general overview of some IDPSA methods as well as some possible applications to PWR safety analyses (SPA)DPSA (Metodologías Integradas de Análisis Determinista-Probabilista de Seguridad) es un conjunto de métodos que utilizan métodos probabilistas y deterministas estrechamente acoplados para abordar las respectivas fuentes de incertidumbre, permitiendo la toma de decisiones Informada por el Riesgo de forma consistente. El punto de inicio del marco IDPSA es que la justificación de seguridad debe estar basada en el acoplamiento entre consideraciones deterministas (consecuencias) y probabilistas (frecuencia) para abordar la interacción mutua entre perturbaciones estocásticas (como por ejemplo fallos de los equipos, acciones humanas, fenómenos físicos estocásticos) y la respuesta determinista de la planta (como por ejemplo los transitorios). Este artículo da una visión general de algunos métodos IDSPA así como posibles aplicaciones al análisis de seguridad de los PWR.
Resumo:
The integrated Safety Assessment (ISA) methodology, developed by the Spanish Nuclear Safety Council (CSN), has been applied to a thermal-hydraulic analysis of PWR Station Blackout (SBO) sequences in the context of the IDPSA (Integrated Deterministic-Probabilistic Safety Assessment) network objectives. The ISA methodology allows obtaining the damage domain (the region of the uncertain parameters space where the damage limit is exceeded) for each sequence of interest as a function of the operator actuations times. Given a particular safety limit or damage limit, several data of every sequence are necessary in order to obtain the exceedance frequency of that limit. In this application these data are obtained from the results of the simulations performed with MAAP code transients inside each damage domain and the time-density probability distributions of the manual actions. Damage limits that have been taken into account within this analysis are: local cladding damage (PCT>1477 K); local fuel melting (T>2499 K); fuel relocation in lower plenum and vessel failure. Therefore, to every one of these damage variables corresponds a different damage domain. The operation of the new passive thermal shutdown seals developed by several companies since Fukushima accident is considered in the paper. The results show the capability and necessity of the ISA methodology, or similar, in order to obtain accurate results that take into account time uncertainties.
Resumo:
Federal Railroad Administration, Office of Research and Development, Washington, D.C.
Resumo:
Mode of access: Internet.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
Transportation Department, Research and Special Programs Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.