825 resultados para Performance-based Research Funding Systems
Resumo:
The use of audience response systems (ARSs) or ‘clickers’ in higher education has increased over the recent years, predominantly owing to their ability to actively engage students, for promoting individual and group learning, and for providing instantaneous feedback to students and teachers. This paper describes how group-basedARSquizzes have been integrated into an undergraduate civil engineering course on foundation design. Overall, theARSsummary quizzes were very well received by the students. Feedback obtained from the students indicates that the majority believed the group-based quizzes were useful activities, which helped to improve their understanding of course materials, encouraged self-assessment, and assisted preparation for their summative examination. Providing students with clickers does not, however, necessarily guarantee the class will be engaged with the activity. If an ARS activity is to be successful, careful planning and design must be carried out and modifications adopted where necessary, which should be informed by the literature and relevant student feedback.
Resumo:
In this paper metrics for assessing the performance of directional modulation (DM) physical-layer secure wireless systems are discussed. In the paper DM systems are shown to be categorized as static or dynamic. The behavior of each type of system is discussed for QPSK modulation. Besides EVM-like and BER metrics, secrecy rate as used in information theory community is also derived for the purpose of this QPSK DM system evaluation.
Resumo:
Implementation of both design for durability and performance-based standards and specifications are limited by the lack of rapid, simple, science-based test methods for characterizing the transport properties and deterioration resistance of concrete. To this end, this paper presents the background rationale and current developments in the application of electrical property measurements - conductivity in this instance - as a testing methodology to evaluate the relative performance of a range of concrete mixes. The technique can not only be used on standard specimens (e.g. cubes), but also lends itself to in-situ monitoring thereby allowing measurements to be obtained on the as-placed concrete. It is the latter which forms the focus of the current work. Conductivity measurements are presented for concretes with and without supplementary cementitious materials (SCM's) from demoulding up to 400-days. It is shown that electrical conductivity measurements display a continual decrease over the entire test period and attributed to the pore structure refinement due to hydration and pozzolanic reaction in those concretes containing blast furnace slag or fly ash. The term Formation Factor is introduced to rank concrete performance in terms of is resistance to chloride penetration.
Resumo:
In general, design approaches for durability can be divided into prescriptive design concepts and performance-based design concepts.
Resumo:
This chapter presents an overview on several performance-based approaches for concrete durability specification and conformity assessment of the as-built structure.
Resumo:
The development of 5G enabling technologies brings new challenges to the design of power amplifiers (PAs). In particular, there is a strong demand for low-cost, nonlinear PAs which, however, introduce nonlinear distortions. On the other hand, contemporary expensive PAs show great power efficiency in their nonlinear region. Inspired by this trade-off between nonlinearity distortions and efficiency, finding an optimal operating point is highly desirable. Hence, it is first necessary to fully understand how and how much the performance of multiple-input multiple-output (MIMO) systems deteriorates with PA nonlinearities. In this paper, we first reduce the ergodic achievable rate (EAR) optimization from a power allocation to a power control problem with only one optimization variable, i.e. total input power. Then, we develop a closed-form expression for the EAR, where this variable is fixed. Since this expression is intractable for further analysis, two simple lower bounds and one upper bound are proposed. These bounds enable us to find the best input power and approach the channel capacity. Finally, our simulation results evaluate the EAR of MIMO channels in the presence of nonlinearities. An important observation is that the MIMO performance can be significantly degraded if we utilize the whole power budget.
Resumo:
This paper reports on the financial impacts from the termination of a pay for performance plan for the salesforce at a retail establishment. Using monthly panel data spanning more than eight years for 15 outlets of a major retailer, this study documents that store-level sales and operating profits decrease after the incentive plan is terminated. Individual performance data are then investigated to help identify the role of effort and selection effects in explaining the documented decrease. The analysis of the individual employee sales data reveals that virtually all of the declining store level sales can be explained by selection effects.
Resumo:
As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.
Resumo:
This paper proposes a dynamic scheduler that supports the coexistence of guaranteed and non-guaranteed bandwidth servers to efficiently handle soft-tasks’ overloads by making additional capacity available from two sources: (i) residual capacity allocated but unused when jobs complete in less than their budgeted execution time; (ii) stealing capacity from inactive non-isolated servers used to schedule best-effort jobs. The effectiveness of the proposed approach in reducing the mean tardiness of periodic jobs is demonstrated through extensive simulations. The achieved results become even more significant when tasks’ computation times have a large variance.
Resumo:
Trabalho de Projeto para obtenção do grau de Mestre em Engenharia Informática e de Computadores
Resumo:
This paper presents a reform initiative, the Supporting Montreal Schools Program (SMSP), created by the government of Quebec to assist 184 low socio-economic-status schools in Montreal implement seven reform strategies prescribed by the government. On a regular basis, the professional team of the SMSP engages in reflection and research with universities concerning one or more of the strategies they are charged with helping schools implement or the functioning of the SMSP more generally. The present research programme is part of the team’s ongoing reflection on a component of Strategy 4: professional development of school administrators and the school team. In this paper, we detail results from this initial and subsequent studies on the work of principals in low-performing schools. We also describe our collaborative relationship with the SMSP team, discuss the effectiveness of the SMSP in promoting the implementation of the seven governmentmandated strategies and critique the utility of our partnership with the SMSP and our use of that programme as a vehicle for linking research to practice.
Resumo:
This thesis Entitled phenylethynylarene based Donor-Acceptor systems:Desigh,Synthesis and Photophysical studies. A strategy for the design of donor-acceptor dyads, wherein decay of the charge separated (CS) state to low lying local triplet levels could possibly be prevented, is proposed. In order to examine this strategy, a linked donor-acceptor dyad BPEPPT with bis(phenylethYlly/)pyrene (BPEP) as the light absorber and acceptor and phenothiazine (PT) as donor was designed and photoinduced electron transfer in the dyad investigated. Absorption spectra of the dyad can be obtained by adding contributions due 10 the BPEP and PT moieties indicating that the constituents do not interact in the ground stale. Fluorescence of the BPEP moiety was efficiently quenched by the PT donor and this was attributed to electron lransfer from PT to BPEP. Picosecond transient absorption studies suggested formation of a charge separated state directly from the singlet excited state of BPEP. Nanosecond flash photolysis experiments gave long-ived transient absorptions assignable to PT radical cation and BPEP radical anion. These assignments were confirmed by oxygen quenching studies and secondary electron transfer experiments. Based on the available data, energy level diagram for BPEP-PT was constructed. The long lifetime of the charge separated state was attributed to the inverted region effects. The CS state did not undergo decay to low lying BPEP triplet indicating the success of our strategy