994 resultados para Optimal Contracts


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper investigates demodulation of differentially phase modulated signals DPMS using optimal HMM filters. The optimal HMM filter presented in the paper is computationally of order N3 per time instant, where N is the number of message symbols. Previously, optimal HMM filters have been of computational order N4 per time instant. Also, suboptimal HMM filters have be proposed of computation order N2 per time instant. The approach presented in this paper uses two coupled HMM filters and exploits knowledge of ...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper conditional hidden Markov model (HMM) filters and conditional Kalman filters (KF) are coupled together to improve demodulation of differential encoded signals in noisy fading channels. We present an indicator matrix representation for differential encoded signals and the optimal HMM filter for demodulation. The filter requires O(N3) calculations per time iteration, where N is the number of message symbols. Decision feedback equalisation is investigated via coupling the optimal HMM filter for estimating the message, conditioned on estimates of the channel parameters, and a KF for estimating the channel states, conditioned on soft information message estimates. The particular differential encoding scheme examined in this paper is differential phase shift keying. However, the techniques developed can be extended to other forms of differential modulation. The channel model we use allows for multiplicative channel distortions and additive white Gaussian noise. Simulation studies are also presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Commonwealth legislation covering insurance contracts contains numerous provisions designed to control the operation and effect of terms in life and general insurance contracts. For example, the Life Insurance Act 1995 (Cth) contains provisions regulating the consequences attendant upon incorrect statements in proposals [1] and non-payment of premiums, [2] provides that an insurer may only exclude liability in the case of suicide if it has made express provision for such contingency in its policy, [3] and severely restricts the efficacy of conditions as to war risks. [4] The Insurance Contracts Act 1984 (Cth) is even more intrusive and has a major impact upon contractual provisions in the general insurance field. It is beyond the scope of this note to explore all of these provisions in any detail but examples of controls and constraints imposed upon the operation and effect of contractual provisions include the following. A party is precluded from relying upon a provision in a contract of insurance if such reliance would amount to a failure to act with the utmost good faith. [5] Similarly, a policy provision which requires differences or disputes arising out of the insurance to be submitted to arbitration is void, [6] unless the insurance is a genuine cover for excess of loss over and above another specified insurance. [7] Similarly clause such as conciliation clauses, [8] average clauses, [9] and unusual terms [10] are given qualified operation. [11] However the provision in the Insurance Contracts Act that has the greatest impact upon, and application to, a wide range of insurance clauses and claims is s 54. This section has already generated a significant volume of case law and is the focus of this note. In particular this note examines two recent cases. The first, Johnson v Triple C Furniture and Electrical Pty Ltd [2012] 2 Qd R 337, (hereafter the Triple C case), is a decision of the Queensland Court of Appeal; and the second, Matthew Maxwell v Highway Hauliers Pty Ltd [2013] WASCA 115, (hereafter the Highway Hauliers case), is a decision of the Court of Appeal in Western Australia. This latter decision is on appeal to the High Court of Australia. The note considers too the decision of the New South Wales Court of Appeal in Prepaid Services Pty Ltd v Atradius Credit Insurance NV [2013] NSWCA 252 (hereafter the Prepaid Services case).These cases serve to highlight the complex nature of s 54 and its application, as well as the difficulty in achieving a balance between an insurer and an insured's reasonable expectations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Australia, collaborative contracts have been increasingly used to govern infrastructure projects. These contracts combine formal and informal mechanisms to manage project delivery. Formal mechanisms (e.g. financial risk sharing) are specified in the contract, while informal mechanisms (e.g. integrated team) are not. The paper reports on a literature review to operationalise the concepts of formal and informal governance, as the literature contains a multiplicity of, often un-testable, definitions. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operatinalise formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Formal governance mechanisms were found to be usefully broken down into four measurable categories: (1) target cost arrangement (2) financial risk and reward sharing regime (3) transparent financials and (4) collaborative multi-party agreement Informal governance mechanisms were found to be usefully broken down into three measurable categories: (1) leadership structure (2) integrated team (3) joint management system We expect these categories to effectively capture the key governance drivers of outcomes on infrastructure projects. These categories will be further refined and broken down into individual governance mechanisms for assessment through a large-scale Australian survey planned for late 2012. These individual mechanisms will feature in the questionnaire that QUT will deliver to AAA in October 2012.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

From the early literature on the role of firm managers (Alchian and Demsetz 1972) to the industrial organisation on contracts and mechanism design (Laont and Martimort 2009), economists have given a lot of attention to find solutions to the imperfect alignment between individuals' incentives and an organisation's collective goals (Prendergast 1999). In that literature a key role of managers is to monitor individuals to reward behaviour aligned with the collective goals and reduce sub- optimal behaviour, such as shirking. How- ever, another strand of literature, since Akerlof (1982), has put forward a vision of reciprocal behaviour between an organisation's leadership and its members: gifts (high wages, recognition) from the organisation are reciprocated by high effort from the members of the organisation. By rewarding individual members (rather than strictly monitoring them), organisations may benefit from greater effort and cohesion. Experimental research in organizational economics has provided mixed results suggesting that agents do react to personal incentives but also that reciprocal behaviour can play a substantial role (Camerer and Weber 2012).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Money is often a limiting factor in conservation, and attempting to conserve endangered species can be costly. Consequently, a framework for optimizing fiscally constrained conservation decisions for a single species is needed. In this paper we find the optimal budget allocation among isolated subpopulations of a threatened species to minimize local extinction probability. We solve the problem using stochastic dynamic programming, derive a useful and simple alternative guideline for allocating funds, and test its performance using forward simulation. The model considers subpopulations that persist in habitat patches of differing quality, which in our model is reflected in different relationships between money invested and extinction risk. We discover that, in most cases, subpopulations that are less efficient to manage should receive more money than those that are more efficient to manage, due to higher investment needed to reduce extinction risk. Our simple investment guideline performs almost as well as the exact optimal strategy. We illustrate our approach with a case study of the management of the Sumatran tiger, Panthera tigris sumatrae, in Kerinci Seblat National Park (KSNP), Indonesia. We find that different budgets should be allocated to the separate tiger subpopulations in KSNP. The subpopulation that is not at risk of extinction does not require any management investment. Based on the combination of risks of extinction and habitat quality, the optimal allocation for these particular tiger subpopulations is an unusual case: subpopulations that occur in higher-quality habitat (more efficient to manage) should receive more funds than the remaining subpopulation that is in lower-quality habitat. Because the yearly budget allocated to the KSNP for tiger conservation is small, to guarantee the persistence of all the subpopulations that are currently under threat we need to prioritize those that are easier to save. When allocating resources among subpopulations of a threatened species, the combined effects of differences in habitat quality, cost of action, and current subpopulation probability of extinction need to be integrated. We provide a useful guideline for allocating resources among isolated subpopulations of any threatened species. © 2010 by the Ecological Society of America.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The notion of being sure that you have completely eradicated an invasive species is fanciful because of imperfect detection and persistent seed banks. Eradication is commonly declared either on an ad hoc basis, on notions of seed bank longevity, or on setting arbitrary thresholds of 1% or 5% confidence that the species is not present. Rather than declaring eradication at some arbitrary level of confidence, we take an economic approach in which we stop looking when the expected costs outweigh the expected benefits. We develop theory that determines the number of years of absent surveys required to minimize the net expected cost. Given detection of a species is imperfect, the optimal stopping time is a trade-off between the cost of continued surveying and the cost of escape and damage if eradication is declared too soon. A simple rule of thumb compares well to the exact optimal solution using stochastic dynamic programming. Application of the approach to the eradication programme of Helenium amarum reveals that the actual stopping time was a precautionary one given the ranges for each parameter. © 2006 Blackwell Publishing Ltd/CNRS.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Anatomically pre-contoured fracture fixation plates are a treatment option for bone fractures. A well-fitting plate can be used as a tool for anatomical reduction of the fractured bone. However, recent studies showed that some plates fit poorly for many patients due to considerable shape variations between bones of the same anatomical site. Therefore, the plates have to be manually fitted and deformed by surgeons to fit each patient optimally. The process is time-intensive and labor-intensive, and could lead to adverse clinical implications such as wound infection or plate failure. This paper proposes a new iterative method to simulate the patient-specific deformation of an optimally fitting plate for pre-operative planning purposes. We further demonstrate the validation of the method through a case study. The proposed method involves the integration of four commercially available software tools, Matlab, Rapidform2006, SolidWorks, and ANSYS, each performing specific tasks to obtain a plate shape that fits optimally for an individual tibia and is mechanically safe. A typical challenge when crossing multiple platforms is to ensure correct data transfer. We present an example of the implementation of the proposed method to demonstrate successful data transfer between the four platforms and the feasibility of the method.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Integrating renewable energy into public space is becoming more common as a climate change solution. However, this approach is often guided by the environmental pillar of sustainability, with less focus on the economic and social pillars. The purpose of this paper is to examine this issue in the speculative renewable energy propositions for Freshkills Park in New York City submitted for the 2012 Land Art Generator Initiative (LAGI) competition. This paper first proposes an optimal electricity distribution (OED) framework in and around public spaces based on relevant ecology and energy theory (Odum’s fourth and fifth law of thermodynamics). This framework addresses social engagement related to public interaction, and economic engagement related to the estimated quantity of electricity produced, in conjunction with environmental engagement related to the embodied energy required to construct the renewable energy infrastructure. Next, the study uses the OED framework to analyse the top twenty-five projects submitted for the LAGI 2012 competition. The findings reveal an electricity distribution imbalance and suggest a lack of in-depth understanding about sustainable electricity distribution within public space design. The paper concludes with suggestions for future research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project developed and assessed a standard operating procedure for monitoring microbiological aerosol levels and dispersal from Australian industrial composting facilities. Development occurred via seasonal monitoring of such operations with evaluation of optimal microbial indicator organisms, sampling and analysis logistics. The resultant procedure allows practical end-user assessment of compost-associated bioaerosol levels, and potential health risks to proximal residential populations encroaching on such composting facilities and on-site industrial operations personnel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pilot and industrial scale dilute acid pretreatment data can be difficult to obtain due to the significant infrastructure investment required. Consequently, models of dilute acid pretreatment by necessity use laboratory scale data to determine kinetic parameters and make predictions about optimal pretreatment conditions at larger scales. In order for these recommendations to be meaningful, the ability of laboratory scale models to predict pilot and industrial scale yields must be investigated. A mathematical model of the dilute acid pretreatment of sugarcane bagasse has previously been developed by the authors. This model was able to successfully reproduce the experimental yields of xylose and short chain xylooligomers obtained at the laboratory scale. In this paper, the ability of the model to reproduce pilot scale yield and composition data is examined. It was found that in general the model over predicted the pilot scale reactor yields by a significant margin. Models that appear very promising at the laboratory scale may have limitations when predicting yields on a pilot or industrial scale. It is difficult to comment whether there are any consistent trends in optimal operating conditions between reactor scale and laboratory scale hydrolysis due to the limited reactor datasets available. Further investigation is needed to determine whether the model has some efficacy when the kinetic parameters are re-evaluated by parameter fitting to reactor scale data, however, this requires the compilation of larger datasets. Alternatively, laboratory scale mathematical models may have enhanced utility for predicting larger scale reactor performance if bulk mass transport and fluid flow considerations are incorporated into the fibre scale equations. This work reinforces the need for appropriate attention to be paid to pilot scale experimental development when moving from laboratory to pilot and industrial scales for new technologies.