987 resultados para Mid-rise building


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Astronomical tuning of sedimentary records to precise orbital solutions has led to unprecedented resolution in the geological time scale. However, the construction of a consistent astronomical time scale for the Paleocene is controversial due to uncertainties in the recognition of the exact number of 405-kyr eccentricity cycles and accurate correlation between key records. Here, we present a new Danian integrated stratigraphic framework using the land-based Zumaia and Sopelana hemipelagic sections from the Basque Basin and deep-sea records drilled during Ocean Drilling Program (ODP) Legs 198 (Shatsky Rise, North Pacific) and 208 (Walvis Ridge, South Atlantic) that solves previous discrepancies. The new coherent stratigraphy utilises composite images from ODP cores, a new whole-rock d13C isotope record at Zumaia and new magnetostratigraphic data from Sopelana. We consistently observe 11 405-kyr eccentricity cycles in all studied Danian successions. We achieve a robust correlation of bioevents and stable isotope events between all studied sections at the ~100-kyr short-eccentricity level, a prerequisite for paleoclimatic interpretations. Comparison with and subsequent tuning of the records to the latest orbital solution La2011 provides astronomically calibrated ages of 66.022 ± 0.040 Ma and 61.607 ± 0.040 Ma for the Cretaceous-Paleogene (K-Pg) and Danian-Selandian 105 (D-S) boundaries respectively. Low sedimentation rates appear common in all records in the mid-Danian interval, including conspicuous condensed intervals in the oceanic records that in the past have hampered the proper identification of cycles. The comprehensive interbasinal approach applied here reveals pitfalls in time scale construction, filtering techniques in particular, and indicates that some caution and scrutiny has to be applied when building orbital chronologies. Finally, the Zumaia section, already hosting the Selandian Global Boundary Stratotype Section and Point (GSSP), could serve as the global Danian unit stratotype in the future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Elevated seawater pCO2, and in turn ocean acidification (OA), is now widely acknowledged to reduce calcification and growth of reef building corals. As with other environmental factors (e.g., temperature and nutrients), light availability fundamentally regulates calcification and is predicted to change for future reef environments alongside elevated pCO2 via altered physical processes (e.g., sea level rise and turbidity); however, any potential role of light in regulating the OA-induced reduction of calcification is still unknown. We employed a multifactorial growth experiment to determine how light intensity and pCO2 together modify calcification for model coral species from two key genera, Acropora horrida and Porites cylindrica, occupying similar ecological niches but with different physiologies. We show that elevated pCO2 (OA)-induced losses of calcification in the light (G L) but not darkness (G D) were greatest under low-light growth conditions, in particular for A. horrida. High-light growth conditions therefore dampened the impact of OA upon G L but not G D. Gross photosynthesis (P G) responded in a reciprocal manner to G L suggesting OA-relieved pCO2 limitation of P G under high-light growth conditions to effectively enhance G L. A multivariate analysis of past OA experiments was used to evaluate whether our test species responses were more widely applicable across their respective genera. Indeed, the light intensity for growth was identified as a significant factor influencing the OA-induced decline of calcification for species of Acropora but not Porites. Whereas low-light conditions can provide a refuge for hard corals from thermal and light stress, our study suggests that lower light availability will potentially increase the susceptibility of key coral species to OA.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A 87Sr/86Sr isotope curve of the middle Eocene to Oligocene was produced from analysis of foraminifera in Ocean Drilling Program Hole 689B, Maud Rise, near the coast of Antarctica. Sediments from the hole are well preserved with no evidence of diagenetic alteration. The sequence is nearly complete from 46.3 to 24.8 Ma, with an average sampling interval of 166 kyr. Excellent magnetostratigraphy in Hole 689B allows calibration to the geomagnetic polarity time scale of Cande and Kent (1992). Marine strontium isotopic ratios were nearly stable from 46.3 to 35.5 Ma, averaging near 0.70773, after which they began to increase. A slow increase began after 40.4 Ma, rising at a rate of only about 8*10**-6/m.y. from base values of 0.707707. From 35.5 Ma to 24.8 Ma the average slope increased to 40*10**-6/m.y. The slope remained constant at least until 24.8 Ma, when the record becomes discontinuous owing to unconformities. We evaluate several possible controls on the marine strontium isotope curve that could have led to the observed growth in 87Sr/86Sr ratios near the Eocene/Oligocene boundary. Three mechanisms are considered, including the onset of Antarctic glaciation, increased mountain building in the Himalayan-Tibetan region, and decreased hydrothermal activity. None of the mechanisms alone seems to adequately explain the increased 87Sr/86Sr ratios during the Oligocene. Glaciation as a weathering agent was too episodic and probably began too late to explain the upturn in marine 87Sr/86Sr ratios. There is evidence that uplift in the Himalayan-Tibetan region began in the Miocene, much too late to control Oligocene strontium isotope ratios. Lastly, hydrothermal flux changes since the Eocene were apparently not great enough alone to account for the rise in marine 87Sr/86Sr ratios. We suggest that a combination of causes, such as decreased hydrothermal activity perhaps followed by increased glaciation and mountain building, might best explain the growth of the marine 87Sr/86Sr curve during the Oligocene.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Snake Pit hydrothermal field is located on the top of a neovolcanic rise on the Mid-Atlantic Ridge at sea depths between 3460 and 3510 m. It was surveyed during several oceanological expeditions including DSDP Legs. Additional scientific materials were obtained in 2002 and 2003 during expedition onboard R/V Akademik Mstislav Keldysh with two Mir deep-sea manned submersibles. Three eastern hydrothermal mounds (Moose, Beehive, and Fir Tree) are located on the upper part of the eastern slope of the rise over a common fractured pedestal composed of fragments of massive sulfides. The western group of hydrothermal deposits is encountered on the western slope of the axial graben. Within this mature hydrothermal field, which was formed over the past 4000 years, we studied morphology of the hydrothermal mounds, chemistry and mineralogy of hydrothermal deposits, chemistry of sulfide minerals, and isotope composition of sulfur in them.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The European Union has been promoting linguistic diversity for many years as one of its main educational goals. This is an element that facilitates student mobility and student exchanges between different universities and countries and enriches the education of young undergraduates. In particular, a higher degree of competence in the English language is becoming essential for engineers, architects and researchers in general, as English has become the lingua franca that opens up horizons to internationalisation and the transfer of knowledge in today’s world. Many experts point to the Integrated Approach to Contents and Foreign Languages System as being an option that has certain benefits over the traditional method of teaching a second language that is exclusively based on specific subjects. This system advocates teaching the different subjects in the syllabus in a language other than one’s mother tongue, without prioritising knowledge of the language over the subject. This was the idea that in the 2009/10 academic year gave rise to the Second Language Integration Programme (SLI Programme) at the Escuela Arquitectura Técnica in the Universidad Politécnica Madrid (EUATM-UPM), just at the beginning of the tuition of the new Building Engineering Degree, which had been adapted to the European Higher Education Area (EHEA) model. This programme is an interdisciplinary initiative for the set of subjects taught during the semester and is coordinated through the Assistant Director Office for Educational Innovation. The SLI Programme has a dual goal; to familiarise students with the specific English terminology of the subject being taught, and at the same time improve their communication skills in English. A total of thirty lecturers are taking part in the teaching of eleven first year subjects and twelve in the second year, with around 120 students who have voluntarily enrolled in a special group in each semester. During the 2010/2011 academic year the degree of acceptance and the results of the SLI Programme have been monitored. Tools have been designed to aid interdisciplinary coordination and to analyse satisfaction, such as coordination records and surveys. The results currently available refer to the first and second year and are divided into specific aspects of the different subjects involved and into general aspects of the ongoing experience.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Desde los años 60, crece en Europa y Estados Unidos la preocupación y la necesidad de mejorar los procesos de gerencia de los proyectos de construcción al volverse estos más complejos. Esto ha llevado a la continua aparición de nuevos profesionales desde la fecha citada hasta nuestros días. De ahí la complejidad de conocer las cualidades de cada uno de ellos, así como las funciones a realizar o la formación que deben tener para poder desarrollar el puesto de trabajo según el papel que desempeñan para cada actividad. Muchos agentes son los que pueden intervenir en la edificación, muchas son las funciones que llevan a cabo estos agentes, muchas son las habilidades que se necesitan para realizar estas misiones, y una buena gestión de la edificación es la que hay que desarrollar para lograr el gran éxito. El presente trabajo fin de máster, dirigido a arquitectos, arquitectos técnicos, ingenieros, abogados, economistas y todos los profesionales del sector inmobiliario y de la construcción, trata de resolver todas aquellas dudas sobre los diferentes sujetos que estarán presentes desde la definición del proyecto en la fase inicial hasta el final de la obra, pasando por las fases de pre-construcción, construcción y post-construcción. (ENGLISH VERSION) Since the 1960s, most construction projects have become more and more complex, and new concerns and necessities related to the management of a project have been on the rise in Europe and in the United States. Thence, the need for more specialized professionals in the field has become a common fact, as well as the inclusion of new curricular subjects in most building engineering studies. There are different agents that play a relevant role in a building project; some of them are expected to perform a highly specialized set of functions that require specific management skills for the work to be successful. This research work—aimed mainly at engineers, quantity surveyors, lawyers, economists, real estate and construction professionals—shows the major implications of the building construction process including both pre-tender/construction and post-tender/construction stages as far as the main expert agents are involved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tras la denominación de Real Sitio a mediados del siglo XVIII, bajo el reinado de Fernando VI, su sucesor Carlos III procedió a la incorporación a su Patrimonio de todos los Montes y Bosques de El Pardo. Comenzó entonces el proceso de planeamiento urbano y de construcción arquitectónica que finalizó en torno al año 1800. En lo sucesivo, no sólo se mantiene el curso de la conservación y consolidación de los edificios principales, sino que se realiza obra nueva de índole civil. Algunos edificios cambiaron de propiedad y de uso hasta que tras la Guerra Civil se procedió a la mayor transformación vivida por el Real Sitio. El intervalo que aquí se trata (1885 a 1965), no ha suscitado, en los estudios sobre El Pardo, atención suficiente al no acontecer obra nueva de carácter patrimonial ni ha sido objeto de análisis el trazado y la fisonomía del centro urbano residencial del pueblo que Carlos III configuró. Sin embargo se estima relevante analizar los cambios en la actividad residencial; en primer lugar porque coexiste con la arquitectura oficial y, por tanto, se entiende necesario un análisis global del conjunto y en segundo lugar porque facilita la comprensión sobre la imagen original de carácter histórico del conjunto de finales del siglo XVIII. Este marco temporal determina tres partes principales de estudio que estructuran la presente tesis, cuyas fechas establecen los intervalos históricos clave: Actuaciones sobre el núcleo urbano consolidado (1885-1931). Cese de la actividad constructiva (1931-1939). Propuestas regeneradoras y crecimiento acelerado (1939-1965). Dentro de ellos se establecen, a su vez, dos subcapítulos diferenciados con la finalidad de explicar los sucesos que pautaron los cambios trascendentales en la historia de El Pardo. En el estudio del estado de la cuestión se observa que en El Pardo, al igual que sucede en otros Reales Sitios, se investigan los edificios destacados como el Palacio, la Casita del Príncipe, la Casa de Oficios y la Casa de Infantes desde el punto de vista de su historia pero no desde la arquitectura ni de cómo esta afecta al desarrollo del trazado y por tanto al contexto urbano. Se manifiestan determinadas carencias de tratamiento gráfico que facilitarían la comprensión histórica mediante el análisis de la forma y cómo esta ha ido variando sustancialmente. El concepto de escala y orientación reordena el estudio, no sólo de estos edificios protagonistas sino de los que se entretejen a su alrededor y componen el conjunto histórico, lo cual aporta nuevas conclusiones al estado de la cuestión que aquí compete. El principal objetivo de la tesis es, por tanto, contribuir a la dimensión patrimonial mediante el estudio de la arquitectura residencial del pueblo de El Pardo y en cómo esta ha ido conformando y consolidando el entramado urbano original en torno a edificios de la realeza y corte. Analizar aquellos edificios que perduran, los que fueron reconstruidos, rehabilitados, y apuntar acontecimientos históricos que formularon la actual fisonomía. Sistematizar y reordenar sobre la traza actual los edificios que desaparecieron, nos da las pistas sobre las modificaciones en concepto de escala arquitectónica y urbana. El estudio de las fuentes y establecer una metodología de conexión de estas, ayuda a detectar dónde no se han dirigido aún los focos de interés así como las lagunas que han quedado por explorar con el fin de responder a nuevas hipótesis, conceder conclusiones y abrir otras líneas de investigación. Como conclusiones generales, la tesis aporta documentación nueva sobre el objeto de estudio, no solicitada, digitalizada o publicada con anterioridad. En ella se analizan los procesos de configuración, consolidación y transformación en el Real Sitio mediante la sistematización de estados comparativos. Con respecto al estudio de los diferentes contextos natural y urbano la tesis analiza cómo los accidentes naturales, el desarrollo de infraestructuras y el impulso de la agronomía afectaron a El Pardo a partir del siglo XIX, y estudia los procesos de configuración, consolidación y transformación en el Real Sitio mediante la sistematización de la documentación encontrada de manera gráfica y escrita. En relación al marco patrimonial arquitectónico, la tesis analiza los procesos edificatorios históricos. Se estudian, a su vez, cambios de ocupación o uso que derivaron en reformas, ampliaciones, obras de nueva planta e incluso en derribos, así como los proyectos no materializados o que se llevaron a cabo de manera parcial. Con respecto al análisis del momento histórico, la tesis analiza las posibles afectaciones, políticas, sociales y económicas en las etapas de Monarquía, Segunda República, Guerra Civil y Posguerra. Por último, la tesis abre cuatro vías de investigación (que ya se han tratado y avanzado en parte pero que escapan a los límites de este trabajo) que pueden plantear nuevas hipótesis, reportando así respuestas sobre objetos de estudio complementarios y paralelos al presente. Estas refieren a análisis más concretos sobre El Palacio Real de El Pardo y la Casa de Oficios, el Camino Real de Madrid a El Pardo desde la Puerta de Hierro, los cuarteles, puertas y portilleras del Monte de El Pardo y los proyectos desarrollados por el arquitecto Diego Méndez en los Reales Sitios para el Patrimonio Nacional. ABSTRACT Following the Royal Site denomination being granted in the mid-18th Century, during the reign of Ferdinand VI, his successor Charles III proceeded to include all the Forests and Woodlands of El Pardo in his heritage. That then gave rise to the process of town planning and architectural construction that was completed around 1800. Thereafter, not only the process of conservation and consolidation of the main buildings has been maintained, but new civil engineering works have also been carried out. Some buildings changed ownership and use until, after the Civil War, the greatest transformation experienced by the Royal Site was undertaken. The time frame this paper concerns (1885 to 1965), has not attracted sufficient attention in studies of El Pardo due to there having been no new works with heritage status, nor has there been an analysis of the layout and external appearance of the residential centre in the town once conceived by Charles III. However, it is considered relevant to analyse the changes in residential activity, firstly, because it coexists with the official architecture and, thus, it is considered necessary to perform a global analysis of the complex and, secondly, because it facilitates a historical understanding of the original appearance of the complex at the end of the 18th Century. This time framework defines three main parts of the study that provide the structure of this thesis, the dates of which establish the key historical time frames: Actions in the consolidated town centre (1885-1931). Cessation of construction works (1931-1939). Proposals of regeneration and accelerated growth (1939-1965). Two distinct sub-chapters are also established within these, in order to explain the events that marked the transcendental changes in the history of El Pardo. When studying the subject matter, it is noted that in El Pardo, as is the case in other Royal Sites, outstanding buildings such as the Palace, the Prince's Cottage, the Trades House and the Infantes House are usually researched strictly from the point of view of their history, but not from an architectural perspective, nor analysing how that affects the development of the site layout and thus the urban area. Specific shortcomings are evident in the graphic treatment that would have otherwise facilitated a historical understanding through the analysis of the shape and the way it has gradually undergone substantial variation. The concept of scale and orientation reorganises the study, not only of these key buildings, but also of those that are woven around them and make up the historic complex, allowing entirely new conclusions concerning the subject matter analysed herein. Therefore, the main purpose of this thesis is to outline our heritage through the study of the residential architecture of the town of El Pardo and the analysis of the way the original town has been built up and consolidated around the buildings erected by royalty and the court; to analyse the buildings that still remain, those that were rebuilt, refurbished, and to note historic events that shaped its current appearance. To this end, a systematic classification and reorganisation on the current urban layout of the buildings that have disappeared will give us the key to understand changes in the concept of architectural and urban scale. Studying the sources and establishing a methodology to connect them will help us detect those areas where the focus of interest has not concentrated yet, and will also reveal the gaps that remain unexplored, in order to respond to new hypotheses, reach new conclusions and open up new lines of research. As general conclusions, this thesis provides new documentation on the subject matter that had not been requested, digitized or published before. There we find an analysis of the processes of configuration, consolidation and transformation of the Royal Site through a systematic classification of comparative states. With regard to the study of the multiple natural and urban environments, this thesis analyses the way natural features, development of infrastructures and agricultural driving forces affected El Pardo as of the 19th Century, and it studies the processes of configuration, consolidation and transformation of the Royal Site by systematically classifying the documentation found in graphic and written documents. In relation to the architectural heritage framework, this thesis analyses historical building processes. Likewise, a study is also performed on the changes in land occupation or use that led to reforms, extensions, new buildings and even to demolitions, as well as on unrealized projects, or even on those that were partially implemented. As for the analysis of the historical time period, this thesis assesses the potential political, social and economic effects of the Monarchy, Second Republic, Civil War and Post-War Periods. Finally, this thesis opens up four lines of investigation (that have already been discussed and partially advanced, but which fall beyond the scope of this work) that could pose new hypotheses, thus giving answer to other subject matters parallel and complementary to the one assessed herein. These refer to more specific analyses of El Palacio Real de El Pardo (Royal Palace of El Pardo) and the Casa de Oficios (Trades House), the Royal Highway from Madrid to El Pardo from Puerta de Hierro, the barracks, gates and entrances to estates in the Woodlands of El Pardo and the projects developed on the Royal Sites by the architect Diego Méndez for the National Heritage.