990 resultados para Maranhão State
Resumo:
US state-based data breach notification laws have unveiled serious corporate and government failures regarding the security of personal information. These laws require organisations to notify persons who may be affected by an unauthorized acquisition of their personal information. Safe harbours to notification exist if personal information is encrypted. Three types of safe harbour have been identified in the literature: exemptions, rebuttable presumptions and factors. The underlying assumption of exemptions is that encrypted personal information is secure and therefore unauthorized access does not pose a risk. However, the viability of this assumption is questionable when examined against data breaches involving encrypted information and the demanding practical requirements of effective encryption management. Recent recommendations by the Australian Law Reform Commission (ALRC) would amend the Privacy Act 1988 (Cth) to implement a data breach scheme that includes a different type of safe harbour, factor based analysis. The authors examine the potential capability of the ALRC’s proposed encryption safe harbour in relation to the US experience at the state legislature level.
Resumo:
In a recent decision by Mr Justice Laddie, a patent was held anticipated by, inter alia, prior use of a device which fell within the claims of the patent in suit, even though its circuitry was enclosed in resin. The anticipating invention had been "made available to the public" within the terms of section 2 (2) of the Patents Act 1977 because its essential integers would have been revealed by an interesting character, the "skilled forensic engineer".
Resumo:
The paper compares three different methods of inclusion of current phasor measurements by phasor measurement units (PMUs) in the conventional power system state estimator. For each of the three methods, comprehensive formulation of the hybrid state estimator in the presence of conventional and PMU measurements is presented. The performance of the state estimator in the presence of conventional measurements and optimally placed PMUs is evaluated in terms of convergence characteristics and estimator accuracy. Test results on the IEEE 14-bus and IEEE 300-bus systems are analyzed to determine the best possible method of inclusion of PMU current phasor measurements.
Resumo:
In this chapter, we are particularly concerned with making visible the general principles underlying the transmission of Social Studies curriculum knowledge, and considering it in light of a high-stakes mandated national assessment task. Specifically, we draw on Bernstein’s theoretical concept of pedagogic models as a tool for analysing orientations to teaching and learning. We introduce a case in point from the Australian context: one state Social Studies curriculum vis-a-vis one part of the Year Three national assessment measure for reading. We use our findings to consider the implications for the disciplinary knowledge of Social Studies in the communities in which we are undertaking our respective Australian Research Council Linkage project work (Glasswell et al.; Woods et al.). We propose that Social Studies disciplinary knowledge is being constituted, in part, through power struggles between different agencies responsible for the production and relay of official forms of state curriculum and national literacy assessment. This is particularly the case when assessment instruments are used to compare and contrast school results in highly visible web based league tables (see, for example, http://myschoolaustralia.ning.com/).
The rise and demise of assessment centres in the selection of principals in Queensland State Schools
Resumo:
Various load compensation schemes proposed in literature assume that voltage source at point of common coupling (PCC) is stiff. In practice, however, the load is remote from a distribution substation and is supplied by a feeder. In the presence of feeder impedance, the PWM inverter switchings distort both the PCC voltage and the source currents. In this paper load compensation with such a non-stiff source is considered. A switching control of the voltage source inverter (VSI) based on state feedback is used for load compensation with non-stiff source. The design of the state feedback controller requires careful considerations in choosing a gain matrix and in the generation of reference quantities. These aspects are considered in this paper. Detailed simulation and experimental results are given to support the control design.
Resumo:
Purpose, Design/methodology / approach The acknowledgement of state significance in relation to development projects can result in special treatment by regulatory authorities, particularly in terms of environmental compliance and certain economic and other government support measures. However, defining just what constitutes a “significant project”, or a project of “state significance”, varies considerably between Australian states. In terms of establishing threshold levels, in Queensland there is even less clarity. Despite this lack of definition, the implications of “state significance” can nevertheless be considerable. For example, in Queensland if the Coordinator-General declares a project to be a “significant project” under the State Development and Public Works Organisation Act 1971, the environmental impact assessment process may become more streamlined – potentially circumventing certain provisions under The Integrated Planning Act 1997. If the project is not large enough to be so deemed, an extractive resource under the State Planning Policy 2/07 - Protection of Extractive Resources 2007 may be considered to be of State or regional significance and subsequently designated as a “Key Resource Area”. As a consequence, such a project is afforded some measure of resource protection but remains subject to the normal assessment process under the Integrated Development Assessment System, as well as the usual requirements of the vegetation management codes, and other regulations. Findings (Originality/value) & Research limitations / implications This paper explores the various meanings of “state significance” in Queensland and the ramifications for development projects in that state. It argues for a streamlining of the assessment process in order to avoid or minimise constraints acting on the state’s development. In so doing, it questions the existence of a strategic threat to the delivery of an already over-stretched infrastructure program.