881 resultados para IT infrastructure management
Resumo:
Due to ever increasing climate instability, the number of natural disasters affecting society and communities is expected to increase globally in the future, which will result in a growing number of casualties and damage to property and infrastructure. Such damage poses crucial challenges for recovery of interdependent critical infrastructures. Post-disaster reconstruction is a complex undertaking as it is not only closely linked to the well-being and essential functioning of society, but also requires a large financial commitment. Management of critical infrastructure during post-disaster recovery needs to be underpinned by a holistic recognition that the recovery of each individual infrastructure system (e.g. energy, water, transport and information and communication technology) can be affected by the interdependencies that exist between these different systems. A fundamental characteristic of these interdependencies is that failure of one critical infrastructure system can result in the failure of other interdependent infrastructures, leading to a cascade of failures, which can impede post-disaster recovery and delay the subsequent reconstruction process. Consequently, there is a critical need for developing a holistic strategy to assess the influence of infrastructure interdependencies, and for incorporating these interdependencies into a post-disaster recovery strategy. This paper discusses four key dimensions of interdependencies that need to be considered in a post-disaster reconstruction planning. Using key concepts and sub-concepts derived from the notion of interdependency, the paper examines how critical infrastructure interdependencies affect the recovery processes of damaged infrastructures.
Resumo:
Civil infrastructure provides essential services for the development of both society and economy. It is very important to manage systems efficiently to ensure sound performance. However, there are challenges in information extraction from available data, which also necessitates the establishment of methodologies and frameworks to assist stakeholders in the decision making process. This research proposes methodologies to evaluate systems performance by maximizing the use of available information, in an effort to build and maintain sustainable systems. Under the guidance of problem formulation from a holistic view proposed by Mukherjee and Muga, this research specifically investigates problem solving methods that measure and analyze metrics to support decision making. Failures are inevitable in system management. A methodology is developed to describe arrival pattern of failures in order to assist engineers in failure rescues and budget prioritization especially when funding is limited. It reveals that blockage arrivals are not totally random. Smaller meaningful subsets show good random behavior. Additional overtime failure rate is analyzed by applying existing reliability models and non-parametric approaches. A scheme is further proposed to depict rates over the lifetime of a given facility system. Further analysis of sub-data sets is also performed with the discussion of context reduction. Infrastructure condition is another important indicator of systems performance. The challenges in predicting facility condition are the transition probability estimates and model sensitivity analysis. Methods are proposed to estimate transition probabilities by investigating long term behavior of the model and the relationship between transition rates and probabilities. To integrate heterogeneities, model sensitivity is performed for the application of non-homogeneous Markov chains model. Scenarios are investigated by assuming transition probabilities follow a Weibull regressed function and fall within an interval estimate. For each scenario, multiple cases are simulated using a Monte Carlo simulation. Results show that variations on the outputs are sensitive to the probability regression. While for the interval estimate, outputs have similar variations to the inputs. Life cycle cost analysis and life cycle assessment of a sewer system are performed comparing three different pipe types, which are reinforced concrete pipe (RCP) and non-reinforced concrete pipe (NRCP), and vitrified clay pipe (VCP). Life cycle cost analysis is performed for material extraction, construction and rehabilitation phases. In the rehabilitation phase, Markov chains model is applied in the support of rehabilitation strategy. In the life cycle assessment, the Economic Input-Output Life Cycle Assessment (EIO-LCA) tools are used in estimating environmental emissions for all three phases. Emissions are then compared quantitatively among alternatives to support decision making.
Resumo:
In order to exploit the adaptability of a SOA infrastructure, it becomes necessary to provide platform mechanisms that support a mapping of the variability in the applications to the variability provided by the infrastructure. The approach focuses on the configuration of the needed infrastructure mechanisms including support for the derivation of the infrastructure variability model.
Resumo:
Knowledge is one of the most important assets for surviving in the modern business environment. The effective management of that asset mandates continuous adaptation by organizations, and requires employees to strive to improve the company's work processes. Organizations attempt to coordinate their unique knowledge with traditional means as well as in new and distinct ways, and to transform them into innovative resources better than those of their competitors. As a result, how to manage the knowledge asset has become a critical issue for modern organizations, and knowledge management is considered the most feasible solution. Knowledge management is a multidimensional process that identifies, acquires, develops, distributes, utilizes, and stores knowledge. However, many related studies focus only on fragmented or limited knowledge-management perspectives. In order to make knowledge management more effective, it is important to identify the qualitative and quantitative issues that are the foundation of the challenge of effective knowledge management in organizations. The main purpose of this study was to integrate the fragmented knowledge management perspectives into the holistic framework, which includes knowledge infrastructure capability (technology, structure, and culture) and knowledge process capability (acquisition, conversion, application, and protection), based on Gold's (2001) study. Additionally, because the effect of incentives ̶̶ which is widely acknowledged as a prime motivator in facilitating the knowledge management process ̶̶ was missing in the original framework, this study included the importance of incentives in the knowledge management framework. This study also identified the relationship of organizational performance from the standpoint of the Balanced Scorecard, which includes the customer-related, internal business process, learning & growth, and perceptual financial aspects of organizational performance in the Korean business context. Moreover, this study identified the relationship with the objective financial performance by calculating the Tobin's q ratio. Lastly, this study compared the group differences between larger and smaller organizations, and manufacturing and nonmanufacturing firms in the study of knowledge management. Since this study was conducted in Korea, the original instrument was translated into Korean through the back translation technique. A confirmatory factor analysis (CFA) was used to examine the validity and reliability of the instrument. To identify the relationship between knowledge management capabilities and organizational performance, structural equation modeling (SEM) and multiple regression analysis were conducted. A Student's t test was conducted to examine the mean differences. The results of this study indicated that there is a positive relationship between effective knowledge management and organizational performance. However, no empirical evidence was found to suggest that knowledge management capabilities are linked to the objective financial performance, which remains a topic for future review. Additionally, findings showed that knowledge management is affected by organization's size, but not by type of organization. The results of this study are valuable in establishing a valid and reliable survey instrument, as well as in providing strong evidence that knowledge management capabilities are essential to improving organizational performance currently and making important recommendations for future research.
Resumo:
Heat management in mines is a growing issue as mines expand physically in size and depth and as the infrastructure grows that is required to maintain them. Heat management is a concern as it relates to the health and safety of the workers as set by the regulations of governing bodies as well as the heat sensitive equipment that may be found throughout the mine workings. In order to reduce the exposure of working in hot environments there are engineering and management systems that can monitor and control the environmental conditions within the mine. The successful implementation of these methods can manage the downtime caused by heat stress environments, which can increase overall production. This thesis introduces an approach to monitoring and data based heat management. A case study is presented with an in depth approach to data collection. Data was collected for a period of up to and over one year. Continuous monitoring was conducted by equipment that was developed both commercially and within the mine site. The monitoring instrumentation was used to assess the environmental conditions found within the study area. Analysis of the data allowed for an engineering assessment of viable options in order to control and manage the environment heat stress. An option is developed and presented which allows for the greatest impact on the heat stress conditions within the case study area and is economically viable for the mine site.
Resumo:
This paper is a detailed case narrative on how a Faculty of a leading Australian University conducted a rigorous process improvement project, applying fundamental Business Process Management (BPM) concepts. The key goal was to increase the efficiency of the faculty’s service desk. The decrease of available funds due to reducing student numbers and the ever increasing costs associated with service desk prompted this project. The outcomes of the project presented a set of recommendations which leads to organizational innovation having information technology as an enabler for change. The target audience includes general BPM practitioners or academics who are interested in BPM related case studies, and specific organisations who might be interested in conducting BPM within their service desk processes.
Resumo:
Urban infrastructure development in Korea has recently shifted from an old paradigm of conventional infrastructure planning to a new paradigm of intelligent infrastructure provision. This new paradigm, so called ubiquitous infrastructure, is based on a combination of urban infrastructure, information and communication technologies and digital networks. Ubiquitous infrastructure basically refers to an urban infrastructure where any citizen could access any infrastructure and services via any electronic device regardless of time and location. This paper introduces this new paradigm of intellectual infrastructure planning and its design schemes. The paper also examines the ubiquitous infrastructure development in Korea and discusses the positive effects of ubiquitous infrastructure on sustainable urban development.
Resumo:
Australia’s civil infrastructure assets of roads, bridges, railways, buildings and other structures are worth billions of dollars. Road assets alone are valued at around A$ 140 billion. As the condition of assets deteriorate over time, close to A$10 billion is spent annually in asset maintenance on Australia's roads, or the equivalent of A$27 million per day. To effectively manage road infrastructures, firstly, road agencies need to optimise the expenditure for asset data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. A procedure for assessing investment decision for road asset management has been developed. The procedure includes: • A methodology for optimising asset data collection; • A methodology for calibrating deterioration prediction models; • A methodology for assessing risk-adjusted estimates for life-cycle cost estimates. • A decision framework in the form of risk map
Resumo:
This document provides a review of international and national practices in investment decision support tools in road asset management. Efforts were concentrated on identifying analytic frameworks, evaluation methodologies and criteria adopted by current tools. Emphasis was also given to how current approaches support Triple Bottom Line decision-making. Benefit Cost Analysis and Multiple Criteria Analysis are principle methodologies in supporting decision-making in Road Asset Management. The complexity of the applications shows significant differences in international practices. There is continuing discussion amongst practitioners and researchers regarding to which one is more appropriate in supporting decision-making. It is suggested that the two approaches should be regarded as complementary instead of competitive means. Multiple Criteria Analysis may be particularly helpful in early stages of project development, say strategic planning. Benefit Cost Analysis is used most widely for project prioritisation and selecting the final project from amongst a set of alternatives. Benefit Cost Analysis approach is useful tool for investment decision-making from an economic perspective. An extension of the approach, which includes social and environmental externalities, is currently used in supporting Triple Bottom Line decision-making in the road sector. However, efforts should be given to several issues in the applications. First of all, there is a need to reach a degree of commonality on considering social and environmental externalities, which may be achieved by aggregating the best practices. At different decision-making level, the detail of consideration of the externalities should be different. It is intended to develop a generic framework to coordinate the range of existing practices. The standard framework will also be helpful in reducing double counting, which appears in some current practices. Cautions should also be given to the methods of determining the value of social and environmental externalities. A number of methods, such as market price, resource costs and Willingness to Pay, are found in the review. The use of unreasonable monetisation methods in some cases has discredited Benefit Cost Analysis in the eyes of decision makers and the public. Some social externalities, such as employment and regional economic impacts, are generally omitted in current practices. This is due to the lack of information and credible models. It may be appropriate to consider these externalities in qualitative forms in a Multiple Criteria Analysis. Consensus has been reached in considering noise and air pollution in international practices. However, Australia practices generally omitted these externalities. Equity is an important consideration in Road Asset Management. The considerations are either between regions, or social groups, such as income, age, gender, disable, etc. In current practice, there is not a well developed quantitative measure for equity issues. More research is needed to target this issue. Although Multiple Criteria Analysis has been used for decades, there is not a generally accepted framework in the choice of modelling methods and various externalities. The result is that different analysts are unlikely to reach consistent conclusions about a policy measure. In current practices, some favour using methods which are able to prioritise alternatives, such as Goal Programming, Goal Achievement Matrix, Analytic Hierarchy Process. The others just present various impacts to decision-makers to characterise the projects. Weighting and scoring system are critical in most Multiple Criteria Analysis. However, the processes of assessing weights and scores were criticised as highly arbitrary and subjective. It is essential that the process should be as transparent as possible. Obtaining weights and scores by consulting local communities is a common practice, but is likely to result in bias towards local interests. Interactive approach has the advantage in helping decision-makers elaborating their preferences. However, computation burden may result in lose of interests of decision-makers during the solution process of a large-scale problem, say a large state road network. Current practices tend to use cardinal or ordinal scales in measure in non-monetised externalities. Distorted valuations can occur where variables measured in physical units, are converted to scales. For example, decibels of noise converts to a scale of -4 to +4 with a linear transformation, the difference between 3 and 4 represents a far greater increase in discomfort to people than the increase from 0 to 1. It is suggested to assign different weights to individual score. Due to overlapped goals, the problem of double counting also appears in some of Multiple Criteria Analysis. The situation can be improved by carefully selecting and defining investment goals and criteria. Other issues, such as the treatment of time effect, incorporating risk and uncertainty, have been given scant attention in current practices. This report suggested establishing a common analytic framework to deal with these issues.
Resumo:
Both in developed and developing economies, major public funding is invested in civil infrastructure assets. Efficiency and comfort level of expected and demanded living standards are largely dependant on the management strategies of these assets. Buildings are one of the major & vital assets, which need to be maintained primarily to ensure its functionality by effective & efficient delivery of services and to optimize economic benefits. Not withstanding, public building infrastructure is not considered in Infrastructure report card published by Australian Infrastructure Report Card Alliance Partners (2001). The reason appears to be not having enough data to rate public building infrastructure. American Infrastructure Report Card (2001) gave “School Buildings” ‘d-’ rating, which is below ‘poor’. For effective asset management of building infrastructure, a need emerged to optimise the budget for managing assets, to cope up with increased user expectations, to response effectively to possible asset failures, to deal with ageing of assets and aging populations and to treat other scenarios including technology advancement and non-asset solutions. John (Asset Management, 2001) suggests that in the area of asset management worldwide, UK, Australia and New Zealand are leading.
Resumo:
Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course
Resumo:
The rate of water reform in Australia is gathering pace with Federal and State initiatives promoting a more integrated approach to water management. This approach encompasses a more competitive environment and a greater role for the private sector. There is a growing recognition of the importance of water recycling in these initiatives and the need to provide opportunities for its development. In March 2008 the Productivity Commission published its discussion paper on urban water reform (Productivity Commission, 2008). The paper cited inadequate institutional arrangements for the management of Australian urban water resources and noted the benefits to be gained from a comprehensive public review of urban water management. This development can be supported through the promotion of a sewer mining industry. This industry, offers flexible and innovative solutions to water recycling demands in a variety of situations and structures. In addition it has the capability of satisfying government competition and private sector policy initiatives.
Resumo:
Generally, major public funding is invested in civil infrastructure assets. The efficiency and comfort level of expected and actual living standards is largely dependant on the management strategies of these assets. Buildings are one of the major & vital assets, which need to be maintained primarily to ensure their functionality by effective & efficient delivery of services and to optimise economic benefits. In Australia, billions of dollars are spent annually managing and maintaining built assets. These assets make up the social and economic infrastructure, which facilitate the essential services to public and business. Buildings are one of the prime & fundamental assets, which need to be managed effectively and efficiently to ensure that related services are delivered economically and sustainably