754 resultados para HD61 Risk Management
Resumo:
A useful strategy for improving disaster risk management is sharing spatial data across different technical organizations using shared information systems. However, the implementation of this type of system requires a large effort, so it is difficult to find fully implemented and sustainable information systems that facilitate sharing multinational spatial data about disasters, especially in developing countries. In this paper, we describe a pioneer system for sharing spatial information that we developed for the Andean Community. This system, called SIAPAD (Andean Information System for Disaster Prevention and Relief), integrates spatial information from 37 technical organizations in the Andean countries (Bolivia, Colombia, Ecuador, and Peru). SIAPAD was based on the concept of a thematic Spatial Data Infrastructure (SDI) and includes a web application, called GEORiesgo, which helps users to find relevant information with a knowledge-based system. In the paper, we describe the design and implementation of SIAPAD together with general conclusions and future directions which we learned as a result of this work.
Resumo:
From the water management perspective, water scarcity is an unacceptable risk of facing water shortages to serve water demands in the near future. Water scarcity may be temporary and related to drought conditions or other accidental situation, or may be permanent and due to deeper causes such as excessive demand growth, lack of infrastructure for water storage or transport, or constraints in water management. Diagnosing the causes of water scarcity in complex water resources systems is a precondition to adopt effective drought risk management actions. In this paper we present four indices which have been developed to evaluate water scarcity. We propose a methodology for interpretation of index values that can lead to conclusions about the reliability and vulnerability of systems to water scarcity, as well as to diagnose their possible causes and to propose solutions. The described methodology was applied to the Ebro river basin, identifying existing and expected problems and possible solutions. System diagnostics, based exclusively on the analysis of index values, were compared with the known reality as perceived by system managers, validating the conclusions in all cases
Resumo:
Irrigators face the risk of not having enough water to meet their crops’ demand. There are different mechanisms to cope with this risk, including water markets (option contracts) or insurance. A farmer will purchase them when the expected utility change derived from the tool is positive. This paper presents a theoretical assessment of the farmer’s expected utility under two different option contracts, a drought insurance and a combination of an option contract and the insurance. We analyze the conditions that determine farmer’s reference for one instrument or the other and perform a numerical application that is relevant for a Spanish region.
Resumo:
In this paper we focus on the selection of safeguards in a fuzzy risk analysis and management methodology for information systems (IS). Assets are connected by dependency relationships, and a failure of one asset may affect other assets. After computing impact and risk indicators associated with previously identified threats, we identify and apply safeguards to reduce risks in the IS by minimizing the transmission probabilities of failures throughout the asset network. However, as safeguards have associated costs, the aim is to select the safeguards that minimize costs while keeping the risk within acceptable levels. To do this, we propose a dynamic programming-based method that incorporates simulated annealing to tackle optimizations problems.
Resumo:
Programa LIFE Comisión Europea (LIFE NAT 080064 CUBOMED; Ministerio de Agricultura, Alimentación y Medio Ambiente; Fundación Biodiversidad; Dirección General del Agua, Generalitat Valenciana; Fundació Baleària; El Portet de Denia.
Resumo:
Urban Mass Transportation Administration, Washington, D.C.
Resumo:
Project manager: Gary Amendola
Resumo:
"Serial no. 109-27."
Resumo:
"Serial no. 110-14."
Resumo:
"Serial no. 110-22."
Resumo:
Shipping list no.: 2009-0291-P.
Resumo:
"Serial no. 110-15."
Resumo:
Shipping list no.: 2009-0314-P.
Resumo:
"Serial no. 110-9."
Resumo:
"Serial no. 110-26."