783 resultados para Fuzzy nabla
Resumo:
Product innovativeness is a primary contingent factor to be addressed for the development of flexible management for the front-end. However, due to complexity of this early phase of the innovation process, the definition of which attributes to customise is critical to support a contingent approach. Therefore, this study investigates front-end attributes that need to be customised to permit effective management for different degrees of innovation. To accomplish this aim, a literature review and five case studies were performed. The findings highlighted the front-end strategic and operational levels as factors influencing the front-end attributes related to product innovativeness. In conclusion, this study suggests that two front-end attributes should be customised: development activities and decision-making approach. Copyright © 2011 Inderscience Enterprises Ltd.
Resumo:
Choosing a project manager for a construction project—particularly, large projects—is a critical project decision. The selection process involves different criteria and should be in accordance with company policies and project specifications. Traditionally, potential candidates are interviewed and the most qualified are selected in compliance with company priorities and project conditions. Precise computing models that could take various candidates’ information into consideration and then pinpoint the most qualified person with a high degree of accuracy would be beneficial. On the basis of the opinions of experienced construction company managers, this paper, through presenting a fuzzy system, identifies the important criteria in selecting a project manager. The proposed fuzzy system is based on IF-THEN rules; a genetic algorithm improves the overall accuracy as well as the functions used by the fuzzy system to make initial estimates of the cluster centers for fuzzy c-means clustering. Moreover, a back-propagation neutral network method was used to train the system. The optimal measures of the inference parameters were identified by calculating the system’s output error and propagating this error within the system. After specifying the system parameters, the membership function parameters—which by means of clustering and projection were approximated—were tuned with the genetic algorithm. Results from this system in selecting project managers show its high capability in making high-quality personnel predictions
Resumo:
以水色、透明度、五日生化需氧量、总氮、总磷、悬浮物等感官的和生物学的6个参数为依据,用fuzzy聚类分析方法对武汉东湖生态系统的污染状况进行了分析研究,所获得的结果与实际情况相符。同时也简单地介绍和讨论了用于生态学的fuzzy聚类分析的一般方法。
Resumo:
In order to effectively improve the classification performance of neural network, first architecture of fuzzy neural network with fuzzy input was proposed. Next a cost function of fuzzy outputs and non-fuzzy targets was defined. Then a learning algorithm from the cost function for adjusting weights was derived. And then the fuzzy neural network was inversed and fuzzified inversion algorithm was proposed. Finally, computer simulations on real-world pattern classification problems examine the effectives of the proposed approach. The experiment results show that the proposed approach has the merits of high learning efficiency, high classification accuracy and high generalization capability.
Resumo:
In this paper, two models of coalition and income's distribution in FSCS (fuzzy supply chain systems) are proposed based on the fuzzy set theory and fuzzy cooperative game theory. The fuzzy dynamic coalition choice's recursive equations are constructed in terms of sup-t composition of fuzzy relations, where t is a triangular norm. The existence of the fuzzy relations in FSCS is also proved. On the other hand, the approaches to ascertain the fuzzy coalition through the choice's recursive equations and distribute the fuzzy income in FSCS by the fuzzy Shapley values are also given. These models are discussed in two parts: the fuzzy dynamic coalition choice of different units in FSCS; the fuzzy income's distribution model among different participators in the same coalition. Furthermore, numerical examples are given aiming at illustrating these models., and the results show that these models are feasible and validity in FSCS.
Resumo:
To consider the energy-aware scheduling problem in computer-controlled systems is necessary to improve the control performance, to use the limited computing resource sufficiently, and to reduce the energy consumption to extend the lifetime of the whole system. In this paper, the scheduling problem of multiple control tasks is discussed based on an adjustable voltage processor. A feedback fuzzy-DVS (dynamic voltage scaling) scheduling architecture is presented by applying technologies of the feedback control and the fuzzy DVS. The simulation results show that, by using the actual utilization as the feedback information to adjust the supply voltage of processor dynamically, the high CPU utilization can be implemented under the precondition of guaranteeing the control performance, whilst the low energy consumption can be achieved as well. The proposed method can be applied to the design in computer-controlled systems based on an adjustable voltage processor.
Resumo:
Tianjin University of Technology