864 resultados para Forestry projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC example that utilized connection details that had been utilized elsewhere. The connection details used between the drilled shaft and pier column and between the pier column and the pier cap were details needing evaluation. These connection details utilized grouted couplers that have been tested by others with mixed results—some indicating quality performance and others indicating questionable performance. There was a need to test these couplers to gain an understanding of their performance in likely Iowa details and to understand how their performance might be impacted by different construction processes. The objective of the work was to perform laboratory testing and evaluation of the grouted coupler connection details utilized on precast concrete elements for the Keg Creek Bridge. The Bridge Engineering Center (BEC), with the assistance of the Iowa Department of Transportation (DOT) Office of Bridges and Structures, developed specimens representative of the Keg Creek Bridge connections for testing under static and fatigue loads in the structures laboratory. The specimens were also evaluated for their ability to resist the intrusion of water and chlorides. Evaluation of their performance was made through comparisons with design assumptions and previous research, as well as the physical performance of the coupled connections.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bio-binders can be utilized as asphalt modifiers, extenders, and replacements for conventional asphalt in bituminous binders. From the rheology results of Phase I of this project, it was found that the bio-binders tested had good performance, similar to conventional asphalt, except at low temperatures. Phase II of this project addresses this shortcoming and evaluates the Superpave performance of laboratory mixes produced with the enhanced bio-binders. The main objective of this research was to develop a bio-binder capable of replacing conventional asphalt in flexible pavements by incorporating ground tire rubber (GTR) into bio-oil derived from fast pyrolysis of agriculture and forestry residues. The chemical compatibility of the new bio-binder with GTR was assessed, and the low-temperature performance of the bio-binders was enhanced by the use of GTR. The newly developed binder, which consisted of 80 percent conventional binder and 20 percent rubber-modified bio-oil (85 percent bio-oil with 15 percent GTR), was used to produce mixes at two different air void contents, 4 and 7 percent. The laboratory performance test results showed that the performance of the newly developed bio-binder mixes is as good as or better than conventional asphalt mixes for fatigue cracking, rutting resistance, moisture sensitivity, and low-temperature cracking. These results need to be validated in field projects in order to demonstrate adequate performance for this innovative and sustainable technology for flexible pavements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Managing existing and newly constructed highway corridors has recently become a significant concern in many states, including Iowa. As urban land and land on the urban fringe develops, there is pressure to add features such as commercial driveways, at-grade public road intersections, and traffic signals to arterial highway routes that should primarily serve high-speed traffic. This diminishes the speed and traffic capacity of such roadways and can also cause significant safety issues. if mobility and safety are diminished, the value of the highway investment is diminished. Since a major highway corridor improvement may cost tens of millions of dollars or more, corridor management is as critical to preserving that investment as is more "hard side" management practices such as pavement or bridge management. Corridor management is a process that applies access management principles to highway corridors in an attempt to balance the competing needs of traffic service, safety, and support for land development. This project helped to identify routes that should be given high priority for corridor management. The pilot study in the form of two corridor management case studies provides an analytical process that can be replicated along the other Iowa commuting corridors using commonly available transportation and land use data resources. It also offers a general set of guidelines for the Iowa Department of Transportation to use in the development of its own comprehensive corridor management program.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation Office of Research & Analytics has created this Guide to help researchers and contractors of the Iowa DOT attain compliance with Federal and Iowa DOT Public Access Policies for transportation-related research publications and datasets. This guide provides direction for filling out the data management plan template (also attached to this record) that will help satisfy Iowa DOT and U.S. DOT requirements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Creating and using FLOSS in R+D projects raises several legal issues, which need to be managed as soon as possible - preferably during the project planning stage. Challenges in the areas of project structure and policy, licenses and licensing, exploitation strategies, community management, and FLOSS-friendliness in general all have their legal aspects, which are commented here. Some recommendations are made for assisting in the use of FLOSS in R+D projects, especially in multiple party consortiums.