875 resultados para Distribution network reconfiguration problem
Resumo:
Smart Grids are characterized by the application of information communication technology (ICT) to solve electrical energy challenges. Electric power networks span large geographical areas, thus a necessary component of many Smart Grid applications is a wide area network (WAN). For the Smart Grid to be successful, utilities must be confident that the communications infrastructure is secure. This paper describes how a WAN can be deployed using WiMAX radio technology to provide high bandwidth communications to areas not commonly served by utility communications, such as generators embedded in the distribution network. A planning exercise is described, using Northern Ireland as a case study. The suitability of the technology for real-time applications is assessed using experimentally obtained latency data.
Resumo:
O desenvolvimento das redes de estradas rurais, especialmente em áreas montanhosas, é a intervenção chave para melhorar a acessibilidade às localidades e aos serviços públicos, cobrindo o maior número de localidades e de serviços públicos, otimizando os escassos recursos disponíveis em países em desenvolvimento. Este estudo explora diferentes modelos de organização de redes de estradas rurais considerando a construção de novas ligações ou o melhoramento de estradas existentes. Um método, baseado na cobertura da rede de estradas rurais, é utilizado para identificar os pontos nodais que formam a rede rural base numa específica região, a qual cobrirá um conjunto dos serviços públicos e de localidades. O modelo assenta numa rede rural de estradas típica ("backbone" e "branch") das regiões montanhosas do Nepal. Os modelos propostos fornecem um conjunto de possibilidades de ligações a estabelecer ou a melhorar e oferece soluções para diferentes níveis de orçamento, que otimizam os custos de transporte na rede, considerando diferentes tipos de pavimento (em solo, granular ou asfáltico). Foi realizado separadamente um modelo dedicado a análises multi-objetivo para resolver problemas de melhoramento de ligações dentro da rede considerando dois objectivos, minimizar os custos de operação para o utilizador e maximizar a população coberta pela rede de estradas, considerando ligações pavimentadas e não pavimentadas (em solo, granular ou asfáltico) dentro de um determinado limite orçamental. O modelo dá ao decisor (DM) diferentes alternativas eficientes para que este possa tomar uma decisão final. Estes modelos, desenvolvidos para redes de estradas rurais, são também aplicáveis a outras redes de infraestruturas rurais, tais como, de fornecimento de água, de eletricidade e de telecomunicações. A implementação dos modelos nas redes de estradas rurais dos distritos de Gorkha e Lamjung do Nepal permitiu confirmara sua aplicabilidade. Verifica-se que os modelos propostos são mais práticos e realísticos no estudo de soluções de melhoramento e de desenvolvimento de redes de estradas rurais em regiões montanhosas de países em desenvolvimento.
Resumo:
The introduction of new distributed energy resources, based on natural intermittent power sources, in power systems imposes the development of new adequate operation management and control methods. This paper proposes a short-term Energy Resource Management (ERM) methodology performed in two phases. The first one addresses the hour-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. Both phases consider the day-ahead resource scheduling solution. The ERM scheduling is formulated as an optimization problem that aims to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixed-integer non-linear programming approach and by a heuristic approach based on genetic algorithms. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units has been implemented in a PSCADbased simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.
Resumo:
This paper addresses the problem of energy resources management using modern metaheuristics approaches, namely Particle Swarm Optimization (PSO), New Particle Swarm Optimization (NPSO) and Evolutionary Particle Swarm Optimization (EPSO). The addressed problem in this research paper is intended for aggregators’ use operating in a smart grid context, dealing with Distributed Generation (DG), and gridable vehicles intelligently managed on a multi-period basis according to its users’ profiles and requirements. The aggregator can also purchase additional energy from external suppliers. The paper includes a case study considering a 30 kV distribution network with one substation, 180 buses and 90 load points. The distribution network in the case study considers intense penetration of DG, including 116 units from several technologies, and one external supplier. A scenario of 6000 EVs for the given network is simulated during 24 periods, corresponding to one day. The results of the application of the PSO approaches to this case study are discussed deep in the paper.
Resumo:
Energy resource scheduling becomes increasingly important, as the use of distributed resources is intensified and massive gridable vehicle use is envisaged. The present paper proposes a methodology for dayahead energy resource scheduling for smart grids considering the intensive use of distributed generation and of gridable vehicles, usually referred as Vehicle- o-Grid (V2G). This method considers that the energy resources are managed by a Virtual Power Player (VPP) which established contracts with V2G owners. It takes into account these contracts, the user´s requirements subjected to the VPP, and several discharge price steps. Full AC power flow calculation included in the model allows taking into account network constraints. The influence of the successive day requirements on the day-ahead optimal solution is discussed and considered in the proposed model. A case study with a 33 bus distribution network and V2G is used to illustrate the good performance of the proposed method.
Resumo:
In recent years, Power Systems (PS) have experimented many changes in their operation. The introduction of new players managing Distributed Generation (DG) units, and the existence of new Demand Response (DR) programs make the control of the system a more complex problem and allow a more flexible management. An intelligent resource management in the context of smart grids is of huge important so that smart grids functions are assured. This paper proposes a new methodology to support system operators and/or Virtual Power Players (VPPs) to determine effective and efficient DR programs that can be put into practice. This method is based on the use of data mining techniques applied to a database which is obtained for a large set of operation scenarios. The paper includes a case study based on 27,000 scenarios considering a diversity of distributed resources in a 32 bus distribution network.
Resumo:
Smart grids with an intensive penetration of distributed energy resources will play an important role in future power system scenarios. The intermittent nature of renewable energy sources brings new challenges, requiring an efficient management of those sources. Additional storage resources can be beneficially used to address this problem; the massive use of electric vehicles, particularly of vehicle-to-grid (usually referred as gridable vehicles or V2G), becomes a very relevant issue. This paper addresses the impact of Electric Vehicles (EVs) in system operation costs and in power demand curve for a distribution network with large penetration of Distributed Generation (DG) units. An efficient management methodology for EVs charging and discharging is proposed, considering a multi-objective optimization problem. The main goals of the proposed methodology are: to minimize the system operation costs and to minimize the difference between the minimum and maximum system demand (leveling the power demand curve). The proposed methodology perform the day-ahead scheduling of distributed energy resources in a distribution network with high penetration of DG and a large number of electric vehicles. It is used a 32-bus distribution network in the case study section considering different scenarios of EVs penetration to analyze their impact in the network and in the other energy resources management.
Resumo:
This paper proposes a PSO based approach to increase the probability of delivering power to any load point by identifying new investments in distribution energy systems. The statistical failure and repair data of distribution components is the main basis of the proposed methodology that uses a fuzzyprobabilistic modeling for the components outage parameters. The fuzzy membership functions of the outage parameters of each component are based on statistical records. A Modified Discrete PSO optimization model is developed in order to identify the adequate investments in distribution energy system components which allow increasing the probability of delivering power to any customer in the distribution system at the minimum possible cost for the system operator. To illustrate the application of the proposed methodology, the paper includes a case study that considers a 180 bus distribution network.
Resumo:
The smart grid concept is a key issue in the future power systems, namely at the distribution level, with deep concerns in the operation and planning of these systems. Several advantages and benefits for both technical and economic operation of the power system and of the electricity markets are recognized. The increasing integration of demand response and distributed generation resources, all of them mostly with small scale distributed characteristics, leads to the need of aggregating entities such as Virtual Power Players. The operation business models become more complex in the context of smart grid operation. Computational intelligence methods can be used to give a suitable solution for the resources scheduling problem considering the time constraints. This paper proposes a methodology for a joint dispatch of demand response and distributed generation to provide energy and reserve by a virtual power player that operates a distribution network. The optimal schedule minimizes the operation costs and it is obtained using a particle swarm optimization approach, which is compared with a deterministic approach used as reference methodology. The proposed method is applied to a 33-bus distribution network with 32 medium voltage consumers and 66 distributed generation units.
Resumo:
This paper proposes a methodology to increase the probability of delivering power to any load point through the identification of new investments. The methodology uses a fuzzy set approach to model the uncertainty of outage parameters, load and generation. A DC fuzzy multicriteria optimization model considering the Pareto front and based on mixed integer non-linear optimization programming is developed in order to identify the adequate investments in distribution networks components which allow increasing the probability of delivering power to all customers in the distribution network at the minimum possible cost for the system operator, while minimizing the non supplied energy cost. To illustrate the application of the proposed methodology, the paper includes a case study which considers an 33 bus distribution network.
Resumo:
The high penetration of distributed energy resources (DER) in distribution networks and the competitiveenvironment of electricity markets impose the use of new approaches in several domains. The networkcost allocation, traditionally used in transmission networks, should be adapted and used in the distribu-tion networks considering the specifications of the connected resources. The main goal is to develop afairer methodology trying to distribute the distribution network use costs to all players which are usingthe network in each period. In this paper, a model considering different type of costs (fixed, losses, andcongestion costs) is proposed comprising the use of a large set of DER, namely distributed generation(DG), demand response (DR) of direct load control type, energy storage systems (ESS), and electric vehi-cles with capability of discharging energy to the network, which is known as vehicle-to-grid (V2G). Theproposed model includes three distinct phases of operation. The first phase of the model consists in aneconomic dispatch based on an AC optimal power flow (AC-OPF); in the second phase Kirschen’s andBialek’s tracing algorithms are used and compared to evaluate the impact of each resource in the net-work. Finally, the MW-mile method is used in the third phase of the proposed model. A distributionnetwork of 33 buses with large penetration of DER is used to illustrate the application of the proposedmodel.
Resumo:
The increasing and intensive integration of distributed energy resources into distribution systems requires adequate methodologies to ensure a secure operation according to the smart grid paradigm. In this context, SCADA (Supervisory Control and Data Acquisition) systems are an essential infrastructure. This paper presents a conceptual design of a communication and resources management scheme based on an intelligent SCADA with a decentralized, flexible, and intelligent approach, adaptive to the context (context awareness). The methodology is used to support the energy resource management considering all the involved costs, power flows, and electricity prices leading to the network reconfiguration. The methodology also addresses the definition of the information access permissions of each player to each resource. The paper includes a 33-bus network used in a case study that considers an intensive use of distributed energy resources in five distinct implemented operation contexts.
Resumo:
An intensive use of dispersed energy resources is expected for future power systems, including distributed generation, especially based on renewable sources, and electric vehicles. The system operation methods and tool must be adapted to the increased complexity, especially the optimal resource scheduling problem. Therefore, the use of metaheuristics is required to obtain good solutions in a reasonable amount of time. This paper proposes two new heuristics, called naive electric vehicles charge and discharge allocation and generation tournament based on cost, developed to obtain an initial solution to be used in the energy resource scheduling methodology based on simulated annealing previously developed by the authors. The case study considers two scenarios with 1000 and 2000 electric vehicles connected in a distribution network. The proposed heuristics are compared with a deterministic approach and presenting a very small error concerning the objective function with a low execution time for the scenario with 2000 vehicles.
Resumo:
Em Angola, apenas cerca de 30% da população tem acesso à energia elétrica, nível que decresce para valores inferiores a 10% em zonas rurais mais remotas. Este problema é agravado pelo facto de, na maioria dos casos, as infraestruturas existentes se encontrarem danificadas ou não acompanharem o desenvolvimento da região. Em particular na capital angolana, Luanda que, sendo a menor província de Angola, é a que regista atualmente a maior densidade populacional. Com uma população de cerca de 5 milhões de habitantes, não só há frequentemente problemas relacionados com a falha do fornecimento de energia elétrica como há ainda uma percentagem considerável de municípios onde a rede elétrica ainda nem sequer chegou. O governo de Angola, no seu esforço de crescimento e aproveitamento das suas enormes potencialidades, definiu o setor energético como um dos fatores críticos para o desenvolvimento sustentável do país, tendo assumido que este é um dos eixos prioritários até 2016. Existem objetivos claros quanto à reabilitação e expansão das infraestruturas do setor elétrico, aumentando a capacidade instalada do país e criando uma rede nacional adequada, com o intuito não só de melhorar a qualidade e fiabilidade da rede já existente como de a aumentar. Este trabalho de dissertação consistiu no levantamento de dados reais relativamente à rede de distribuição de energia elétrica de Luanda, na análise e planeamento do que é mais premente fazer relativamente à sua expansão, na escolha dos locais onde é viável localizar novas subestações, na modelação adequada do problema real e na proposta de uma solução ótima para a expansão da rede existente. Depois de analisados diferentes modelos matemáticos aplicados ao problema de expansão de redes de distribuição de energia elétrica encontrados na literatura, optou-se por um modelo de programação linear inteira mista (PLIM) que se mostrou adequado. Desenvolvido o modelo do problema, o mesmo foi resolvido por recurso a software de otimização Analytic Solver e CPLEX. Como forma de validação dos resultados obtidos, foi implementada a solução de rede no simulador PowerWorld 8.0 OPF, software este que permite a simulação da operação do sistema de trânsito de potências.
Resumo:
Le réseau de distribution aérien, ou plus simplement le réseau de poteaux de bois et ses câbles, est encore aujourd’hui omniprésent dans la majorité des villes du Québec. Pour plusieurs, le réseau de poteaux d’utilité publique semble appartenir à une autre époque. Pourtant, les poteaux et câbles ne sont pas près de disparaître, au contraire, ils ne cessent de se transformer. Depuis peu, de plus en plus d’équipements s’ajoutent sur le réseau: boîtiers techniques, nombre de câbles, appareillages au sommet des poteaux, antennes de communication, etc. Bien que les équipements du réseau de distribution aérien soient des éléments produits industriellement, ceux-ci intègrent rarement les services du design industriel au moment de leur conception initiale. Cette recherche étudie le système de distribution aérien sous l’angle de la « pensée design ». L’intention de cette étude est d’analyser les impacts de la présence du réseau aérien en milieux urbains et a pour objectif d’orienter les pratiques de conception de ce type d’équipements. Pour ce faire, dans une optique transdisciplinaire, diverses approches ont été sollicitées dont: l’approche systémique, l’approche paysage et les approches des partenaires des réseaux. Au moyen d’une recherche documentaire et d’observations faites sur le terrain, la recherche vise à dresser un portrait général du réseau de distribution aérien et les défis qui y sont associés. La recherche expose, dans un état des lieux, les résultats issus des questions analytiques de recherche suivantes: de quoi est composé le réseau de distribution aérien, quels sont les intervenants sur le réseau, quelles sont leurs interactions, quels sont les points de vue des différentes catégories d’acteurs en relation avec le réseau, quels sont les impacts reliés à la présence du réseau en milieux urbains et quelle a été son évolution au fil des années. Dans la perspective de l’approche design, chercher à comprendre une problématique de façon plus large permet de s’assurer que l’on répond au bon problème, que l’on considère tous les facteurs en cause visant ainsi à réduire les répercussions négatives sur les contextes de vie actuels et futurs. Les principaux constats de cette recherche démontrent que la composition du réseau de distribution, avant même de considérer les nouveaux usages et l’ajout de nouveaux équipements, présente des lacunes importantes. La gestion entre les divers partenaires du réseau de distribution pose aussi problème. L’ajout de nouveaux équipements sur le réseau, combiné aux multiples équipements apparaissant sur les voies publiques laisse entrevoir l’atteinte d’un niveau de saturation des milieux urbains. Les façons de faire hermétiques et «cristallisées» des partenaires du réseau ne collent pas avec les initiatives et aspirations générales en matière d’aménagement. En étudiant la problématique du réseau de distribution par le biais de la pensée design, l’approche design cherche à déceler, de façon proactive, les opportunités de design qui permettront de mieux gérer l’apparition et l’intégration des nouveaux équipements sur les poteaux. Cette démarche permet d’envisager des solutions qui visent à limiter les répercussions collatérales une fois en contexte et qui, du même coup, adressent des problématiques connexes. Finalement, à la lumière de l’état des lieux, cette recherche propose des critères de conception de futurs réseaux de distribution, élaborés dans l’esprit de l’approche design.