878 resultados para Distributed Generation (DG)
Resumo:
Power system dynamic analysis and security assessment are becoming more significant today due to increases in size and complexity from restructuring, emerging new uncertainties, integration of renewable energy sources, distributed generation, and micro grids. Precise modelling of all contributed elements/devices, understanding interactions in detail, and observing hidden dynamics using existing analysis tools/theorems are difficult, and even impossible. In this chapter, the power system is considered as a continuum and the propagated electomechanical waves initiated by faults and other random events are studied to provide a new scheme for stability investigation of a large dimensional system. For this purpose, the measured electrical indices (such as rotor angle and bus voltage) following a fault in different points among the network are used, and the behaviour of the propagated waves through the lines, nodes, and buses is analyzed. The impact of weak transmission links on a progressive electromechanical wave using energy function concept is addressed. It is also emphasized that determining severity of a disturbance/contingency accurately, without considering the related electromechanical waves, hidden dynamics, and their properties is not secure enough. Considering these phenomena takes heavy and time consuming calculation, which is not suitable for online stability assessment problems. However, using a continuum model for a power system reduces the burden of complex calculations
Resumo:
This paper presents a new approach for network upgrading to improve the penetration level of Small Scale Generators in residential feeders. In this paper, it is proposed that a common DC link can be added to LV network to alleviate the negative impact of increased export power on AC lines, allowing customers to inject their surplus power with no restrictions to the common DC link. In addition, it is shown that the proposed approach can be a pathway from current AC network to future DC network.
Resumo:
Multi-Microgrids (MMGs) have been proposed to connect distributed generators (DG), microgrids (MG), and medium-voltage (MV) loads with the distribution system. A flexible protection scheme that enables an islanded MMG to continue operation during fault conditions is yet to be developed. In this paper, a protection scheme for an islanded MMG that utilises MG controllers and communication links is proposed. The MMG model used includes two MGs connected to the distribution system. Each MG consists of diesel, wind, and photovoltaic (PV) microsources. The effectiveness of the proposed protection scheme is evaluated by simulation.
Resumo:
Plug-in electric vehicles will soon be connected to residential distribution networks in high quantities and will add to already overburdened residential feeders. However, as battery technology improves, plug-in electric vehicles will also be able to support networks as small distributed generation units by transferring the energy stored in their battery into the grid. Even though the increase in the plug-in electric vehicle connection is gradual, their connection points and charging/discharging levels are random. Therefore, such single-phase bidirectional power flows can have an adverse effect on the voltage unbalance of a three-phase distribution network. In this article, a voltage unbalance sensitivity analysis based on charging/discharging levels and the connection point of plug-in electric vehicles in a residential low-voltage distribution network is presented. Due to the many uncertainties in plug-in electric vehicle ratings and connection points and the network load, a Monte Carlo-based stochastic analysis is developed to predict voltage unbalance in the network in the presence of plug-in electric vehicles. A failure index is introduced to demonstrate the probability of non-standard voltage unbalance in the network due to plug-in electric vehicles.
Resumo:
Global awareness for cleaner and renewable energy is transforming the electricity sector at many levels. New technologies are being increasingly integrated into the electricity grid at high, medium and low voltage levels, new taxes on carbon emissions are being introduced and individuals can now produce electricity, mainly through rooftop photovoltaic (PV) systems. While leading to improvements, these changes also introduce challenges, and a question that often rises is ‘how can we manage this constantly evolving grid?’ The Queensland Government and Ergon Energy, one of the two Queensland distribution companies, have partnered with some Australian and German universities on a project to answer this question in a holistic manner. The project investigates the impact the integration of renewables and other new technologies has on the physical structure of the grid, and how this evolving system can be managed in a sustainable and economical manner. To aid understanding of what the future might bring, a software platform has been developed that integrates two modelling techniques: agent-based modelling (ABM) to capture the characteristics of the different system units accurately and dynamically, and particle swarm optimization (PSO) to find the most economical mix of network extension and integration of distributed generation over long periods of time. Using data from Ergon Energy, two types of networks (3 phase, and Single Wired Earth Return or SWER) have been modelled; three-phase networks are usually used in dense networks such as urban areas, while SWER networks are widely used in rural Queensland. Simulations can be performed on these networks to identify the required upgrades, following a three-step process: a) what is already in place and how it performs under current and future loads, b) what can be done to manage it and plan the future grid and c) how these upgrades/new installations will perform over time. The number of small-scale distributed generators, e.g. PV and battery, is now sufficient (and expected to increase) to impact the operation of the grid, which in turn needs to be considered by the distribution network manager when planning for upgrades and/or installations to stay within regulatory limits. Different scenarios can be simulated, with different levels of distributed generation, in-place as well as expected, so that a large number of options can be assessed (Step a). Once the location, sizing and timing of assets upgrade and/or installation are found using optimisation techniques (Step b), it is possible to assess the adequacy of their daily performance using agent-based modelling (Step c). One distinguishing feature of this software is that it is possible to analyse a whole area at once, while still having a tailored solution for each of the sub-areas. To illustrate this, using the impact of battery and PV can have on the two types of networks mentioned above, three design conditions can be identified (amongst others): · Urban conditions o Feeders that have a low take-up of solar generators, may benefit from adding solar panels o Feeders that need voltage support at specific times, may be assisted by installing batteries · Rural conditions - SWER network o Feeders that need voltage support as well as peak lopping may benefit from both battery and solar panel installations. This small example demonstrates that no single solution can be applied across all three areas, and there is a need to be selective in which one is applied to each branch of the network. This is currently the function of the engineer who can define various scenarios against a configuration, test them and iterate towards an appropriate solution. Future work will focus on increasing the level of automation in identifying areas where particular solutions are applicable.
Resumo:
This paper addresses the voltage rise constraints that are initiated from increased renewable generation resources in low voltage distribution networks. In this paper, an approach which is able to mitigate these voltage rise constraints and allow for increased distributed generator penetration is presented. The proposed approach involves utilizing the distribution transformers static tap changer to reduce the distribution feeder voltage setpoint. The proposed approach is modeled on a generic low voltage distribution network using the PSS SINCAL© simulation software package and is also implemented in a real low voltage distribution network to verify its practicality. Results indicate that this approach can be implemented to mitigate the voltage rise constraint and increase small-scale embedded generator penetration in a high proportion of low voltage feeders while avoiding any substantial network costs.
Resumo:
This paper presents an efficient hybrid evolutionary optimization algorithm based on combining Ant Colony Optimization (ACO) and Simulated Annealing (SA), called ACO-SA, for distribution feeder reconfiguration (DFR) considering Distributed Generators (DGs). Due to private ownership of DGs, a cost based compensation method is used to encourage DGs in active and reactive power generation. The objective function is summation of electrical energy generated by DGs and substation bus (main bus) in the next day. The approach is tested on a real distribution feeder. The simulation results show that the proposed evolutionary optimization algorithm is robust and suitable for solving DFR problem.
Resumo:
This paper deals with an efficient hybrid evolutionary optimization algorithm in accordance with combining the ant colony optimization (ACO) and the simulated annealing (SA), so called ACO-SA. The distribution feeder reconfiguration (DFR) is known as one of the most important control schemes in the distribution networks, which can be affected by distributed generations (DGs) for the multi-objective DFR. In such a case, DGs is used to minimize the real power loss, the deviation of nodes voltage and the number of switching operations. The approach is carried out on a real distribution feeder, where the simulation results show that the proposed evolutionary optimization algorithm is robust and suitable for solving the DFR problem.
Resumo:
The increasing integration of Renewable Energy Resources (RER) and the role of Electric Energy Storage (EES) in distribution systems has created interest in using energy management strategies. EES has become a suitable resource to manage energy consumption and generation in smart grid. Optimize scheduling of EES can also maximize retailer’s profit by introducing energy time-shift opportunities. This paper proposes a new strategy for scheduling EES in order to reduce the impact of electricity market price and load uncertainty on retailers’ profit. The proposed strategy optimizes the cost of purchasing energy with the objective of minimizing surplus energy cost in hedging contract. A case study is provided to demonstrate the impact of the proposed strategy on retailers’ financial benefit.
Resumo:
The work is a report of research on using multiple inverters of Battery Energy Storage Systems with angle droop controllers to share real power in an isolated micro grid system consisting of inertia based Distributed Generation units and variable load. The proposed angle droop control method helps to balance the supply and demand in the micro grid autonomous mode through charging and discharging of the Battery Energy Storage Systems while ensuring that the state of charge of the storage devices is within safe operating conditions. The proposed method is also studied for its effectiveness for frequency control. The proposed control system is verified and its performance validated with simulation software MATLAB/SIMULINK.
Resumo:
Renewable energy resources, in particularly PV and battery storage are increasingly becoming part of residential and agriculture premises to manage their electricity consumption. This thesis addresses the tremendous technical, financial and planning challenges for utilities created by these increases, by offering techniques to examine the significance of various renewable resources in electricity network planning. The outcome of this research should assist utilities and customers for adequate planning that can be financially effective.
Resumo:
This paper presents a new voltage stability index based on the tangent vector of the power flow jacobian. This index is capable of providing the relative vulnerability information of the system buses from the point of view of voltage collapse. In an effort to compare this index with a similar index, the popular voltage stability index L is studied and it is shown through system studies that the L index is not a very consistent indicator of the voltage collapse point of the system but is only a reasonable indicator of the vulnerability of the system buses to voltage collapse. We also show that the new index can be used in the voltage stability analysis of radial systems which is not possible with the L index. This is a significant result of this investigation since there is a lot of contemporary interest in distributed generation and microgrids which are by and large radial in nature. Simulation results considering several test systems are provided to validate the results and the computational needs of the proposed scheme is assessed in comparison with other schemes
Resumo:
A new generator topology for microhydel power plants, capable of unsupervised operation, is proposed. While conventional microhydel plants operate at constant speed with switched ballast loads, the proposed generator, based on the wound rotor induction machine, operates at variable speed and does away with the need for ballast loads. This increases reliability and substantially decreases system costs and setup times. The proposed generator has a simplified decoupled control structure with stator-referenced voltage control similar to a conventional synchronous generator, and rotor-side frequency control that is facilitated by rotating electronics mounted on the rotor. While this paper describes an isolated plant, the topology can also be tailored for distributed generation enabling conversion of the available hydraulic power into useful electrical power when the grid is present, and supplying local loads in the event of grid outage.
Resumo:
Nos últimos anos, o consumo de energia vem crescendo mundialmente nos grandes centros urbanos, e esforços na área de eficiência energética estão sendo implantados, a fim de reduzir o consumo no horário da ponta e interrupções da rede. O aproveitamento das fontes renováveis, como o fotovoltaico em uma edificação se torna um atrativo a mais para a matriz energética num momento em que o país prima pela universalização dos serviços de energia e a classificação de edifícios comerciais, de serviço e públicos, além dos residenciais quanto à eficiência energética através do Procel Edifica (RTQ-C e RTQ-R). Os sistemas fotovoltaicos podem configurar perfis de uso nas edificações de modo a gerar energia para consumo próprio ou ligado à rede e ainda ter influência na arquitetura do prédio com revestimento: os perfis podem está em telhados, fachadas ou janelas, amenizando em alguns casos a carga térmica no prédio com sombreamento arquitetônico. Hoje, com o avanço da tecnologia no setor de armazenagem é possível, o atendimento com segurança e eficiência a uma edificação ou direcionar esta armazenagem a uma demanda específica como o atendimento à demanda de ciclo profundo, tais como, iluminação externa e recarga de veículos elétricos. Partindo da premissa de sistemas interruptos de energia, UPS, uso de fonte secundária como FV, baterias e Flywheel é apresentado uma forma de melhor gerenciar a energia armazenada, podendo estender a vida útil da bateria e conseqüentemente de todo o sistema fotovoltaico na edificação. Esta forma de armazenar energia proporciona um serviço de uso contínuo sem percepção das interrupções da rede com garantia de 20 anos, tal qual o módulo fotovoltaico, com esta proposta as perdas de energia elétrica na edificação serão atenuadas, pois a eletricidade será utilizada de forma eficiente e inteligente. O ponto de partida do estudo de caso no prédio do IBAM são os sistemas fotovoltaicos com geração distribuída (mini-redes) conectados à rede que são instalados para fornecer energia ao consumidor, complementando a quantidade de energia demandada, caso haja algum aumento do consumo de energia na edificação, ou ainda utilizar o sistema fotovoltaico na hora da ponta e interrupções do sistema da rede no período fora da ponta. A estocagem inercial por meio do Flywheel tem um papel fundamental nesta mini-rede (Flywheel, bateria VRLA, UPS, inversor e STS), pois a sua utilização pode ser apontada como uma inovação tecnológica quanto à regulação de tensão no sistema de energia elétrica, além de preparar a edificação para o smart-grid. Esta configuração de acumulação de energia permitiu a analise do deslocamento desta energia armazenada para o consumo no horário de ponta, mudando o conceito de sistemas fotovoltaicos autônomos no meio urbano e rural no país. Este conceito de armazenagem se confirma então como um aporte na eficiência de energia na edificação, podendo carrear economia de energia substancial, além de proporcionar uma confiabilidade no serviço de energia, com um baixo retorno do investimento e com uma garantia de funcionamento com pequena ou nenhuma manutenção durante o período de vida de 20 anos.
Resumo:
The amount of distributed generation connected to the distribution network is increasing. To use this resource more effectively, splitting of the distribution network, or islanding the system, for prevention of power outages is being considered by some utilities. In this paper an islanding method that avoids out-ofsynchronism re-closure is proposed. The island is kept in synchronism with the rest of the utility while it is not electrically connected. This is referred to as synchronous islanded operation. A phase difference control algorithm, developed by the authors, was tested in a single set scenario on a 50-kVA diesel generator using two different governors. These are the “standard product” variable gain governor of the diesel generator and a governor developed by the authors, which utilizes supplementary inputs in addition to engine speed. The results show that phase difference can be controlled within acceptable limits, both in steady state and after load disturbances are applied. The advantages of employing supplementary governor inputs are fully evaluated.