893 resultados para Development models


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Modelling of froth transportation, as part of modelling of froth recovery, provides a scale-up procedure for flotation cell design. It can also assist in improving control of flotation operation. Mathematical models of froth velocity on the surface and froth residence time distribution in a cylindrical tank flotation cell are proposed, based on mass balance principle of the air entering the froth. The models take into account factors such as cell size, concentrate launder configuration, use of a froth crowder, cell operating conditions including froth height and air rate, and bubble bursting on the surface. (C) 2004 Elsevier Ltd. All rights reserved.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Information about the world is often represented in the brain in the form of topographic maps. A paradigm example is the topographic representation of the visual world in the optic tectum/superior colliculus. This map initially forms during neural development using activity-independent molecular cues, most notably some type of chemospecific matching between molecular gradients in the retina and corresponding gradients in the tectum/superior colliculus. Exactly how this process might work has been studied both experimentally and theoretically for several decades. This review discusses the experimental data briefly, and then in more detail the theoretical models proposed. The principal conclusions are that (1) theoretical models have helped clarify several important ideas in the field, (2) earlier models were often more sophisticated than more recent models, and (3) substantial revisions to current modelling approaches are probably required to account for more than isolated subsets of the experimental data.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Abstract Development data of eggs and pupae of Xyleborus fornicatus Eichh. (Coleoptera: Scolytidae), the shot-hole borer of tea in Sri Lanka, at constant temperatures were used to evaluate a linear and seven nonlinear models for insect development. Model evaluation was based on fit to data (residual sum of squares and coefficient of determination or coefficient of nonlinear regression), number of measurable parameters, the biological value of the fitted coefficients and accuracy in the estimation of thresholds. Of the nonlinear models, the Lactin model fitted experimental data well and along with the linear model, can be used to describe the temperature-dependent development of this species.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Most parametric software cost estimation models used today evolved in the late 70's and early 80's. At that time, the dominant software development techniques being used were the early 'structured methods'. Since then, several new systems development paradigms and methods have emerged, one being Jackson Systems Development (JSD). As current cost estimating methods do not take account of these developments, their non-universality means they cannot provide adequate estimates of effort and hence cost. In order to address these shortcomings two new estimation methods have been developed for JSD projects. One of these methods JSD-FPA, is a top-down estimating method, based on the existing MKII function point method. The other method, JSD-COCOMO, is a sizing technique which sizes a project, in terms of lines of code, from the process structure diagrams and thus provides an input to the traditional COCOMO method.The JSD-FPA method allows JSD projects in both the real-time and scientific application areas to be costed, as well as the commercial information systems applications to which FPA is usually applied. The method is based upon a three-dimensional view of a system specification as opposed to the largely data-oriented view traditionally used by FPA. The method uses counts of various attributes of a JSD specification to develop a metric which provides an indication of the size of the system to be developed. This size metric is then transformed into an estimate of effort by calculating past project productivity and utilising this figure to predict the effort and hence cost of a future project. The effort estimates produced were validated by comparing them against the effort figures for six actual projects.The JSD-COCOMO method uses counts of the levels in a process structure chart as the input to an empirically derived model which transforms them into an estimate of delivered source code instructions.