587 resultados para Delphi


Relevância:

10.00% 10.00%

Publicador:

Resumo:

We all live in a yellow submarine… When I go to work in the morning, in the office building that hosts our BPM research group, on the way up to our level I come by this big breakout room that hosts a number of computer scientists, working away at the next generation software algorithms and iPad applications (I assume). I have never actually been in that room, but every now and then the door is left ajar for a while and I can spot couches, lots (I mean, lots!) of monitors, the odd scientist, a number of Lara Croft posters, and the usual room equipment you’d probably expect from computer scientists (and, no, it’s not like that evil Dennis guy from the Jurassic Park movie, buried in chips, coke, and flickering code screens… It’s also not like the command room from the Nebuchadnezzar, Neo’s hovercraft in the Matrix movies, although I still strongly believe these green lines of code make a good screensaver).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Objectives: To develop recommendations for the clinical education required to prepare Australian Nurse Practitioner candidates for advanced and extended practice in nephrology settings. Methods: Using the Delphi research technique a consensus statement was developed over a nine month period. All endorsed and candidate Nephrology Nurse Practitioners (NNP) were invited to participate as the expert panel. The Delphi research technique uses a systematic and iterative process. The expert panel were asked to generate a list of items which were then circulated to all NNPs. They were asked to determine their degree of agreement or disagreement with each statement using a 5-point Likert scale There was opportunity for free-text comments to be provided if desired. Results from each round were collated; the document was refined and circulated to the experts for a subsequent round. Consensus was demonstrated after three Delphi rounds. Results: The consensus statement comprises four components explaining the role and membership of the mentorship team, the setting and location of NNP clinical education, learning strategies to support the NNP, and outcomes of NNP clinical education. Demographic questions in the final survey revealed information about the qualifications, years of experience, and practice location of Australian NNPs. Conclusions: The consensus statement is not prescriptive but it will inform NNP candidates, university course providers and mentors about the expected extended nephrology specific clinical education that will enable the NNP to provide advanced nursing care for patients regardless of the stage of chronic kidney disease (CKD) and the practice setting.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Safety culture in the construction industry is a growing research area. The unique nature of construction industry works – being project-based, varying in size and focus, and relying on a highly transient subcontractor workforce – means that safety culture initiatives cannot be easily translated from other industries. This paper reports on the first study in a three year collaborative industry and university research project focusing on safety culture practices and development in one of Australia’s largest global construction organisations. The first round of a modified Delphi method is reported, and describes the insights gained from 41 safety leaders’ perceptions and understandings of safety culture within the organisation. In-depth, semi-structured interviews were conducted, and will be followed by a quantitative perception survey with the same sample. Participants included Senior Executives, Corporate Managers, Project Managers, Safety Managers and Site Supervisors. Leaders’ definitions and descriptions of safety culture were primarily action-oriented and some confusion was evident due to the sometimes implicit nature of culture in organisations. Leadership was identified as a key factor for positive safety culture in the organisation, and there was an emphasis on leaders demonstrating commitment to safety, and being visible to the project-based workforce. Barriers to safety culture improvement were also identified, with managers raising diverse issues such as the transient subcontractor workforce and the challenge of maintaining safety as a priority in the absence of safety incidents, under high production pressures. This research is unique in that it derived safety culture descriptions from key stakeholders within the organisation, as opposed to imposing traditional conceptualisations of safety culture that are not customised for the organisation or the construction industry more broadly. This study forms the foundation for integrating safety culture theory and practice in the construction industry, and will be extended upon in future studies within the research program.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Research found that today’s organisations are increasingly aware of the potential barriers and perceived challenges associated with the successful delivery of change — including cultural and sub-cultural indifferences; financial constraints; restricted timelines; insufficient senior management support; fragmented key stakeholder commitment; and inadequate training. The delivery and application of Innovative Change (see glossary) within a construction industry organisation tends to require a certain level of ‘readiness’. This readiness is the combination of an organisation’s ability to part from undertakings that may be old, traditional, or inefficient; and then being able to readily adopt a procedure or initiative which is new, improved, or more efficient. Despite the construction industry’s awareness of the various threats and opportunities associated with the delivery of change, research found little attention is currently given to develop a ‘decision-making framework’ that comprises measurable elements (dynamics) that may assist in more accurately determining an organisation’s level of readiness or ability to deliver innovative change. To resolve this, an initial Background Literature Review in 2004 identified six such dynamics, those of Change, Innovation, Implementation, Culture, Leadership, and Training and Education, which were then hypothesised to be key components of a ‘Conceptual Decision-making Framework’ (CDF) for delivering innovative change within an organisation. To support this hypothesis, a second (more extensive) Literature Review was undertaken from late 2007 to mid 2009. A Delphi study was embarked on in June 2008, inviting fifteen building and construction industry members to form a panel and take part in a Delphi study. The selection criterion required panel members to have senior positions (manager and above) within a recognised field or occupation, and to have experience, understanding and / or knowledge in the process of delivering change within organisations. The final panel comprised nine representatives from private and public industry organisations and tertiary / research and development (R&D) universities. The Delphi study developed, distributed and collated two rounds of survey questionnaires over a four-month period, comprising open-ended and closed questions (referred to as factors). The first round of Delphi survey questionnaires were distributed to the panel in August 2008, asking them to rate the relevancy of the six hypothesised dynamics. In early September 2008, round-one responses were returned, analysed and documented. From this, an additional three dynamics were identified and confirmed by the panel as being highly relevant during the decision-making process when delivering innovative change within an organisation. The additional dynamics (‘Knowledge-sharing and Management’; ‘Business Process Requirements’; and ‘Life-cycle Costs’) were then added to the first six dynamics and used to populate the second (final) Delphi survey questionnaire. This was distributed to the same nine panel members in October 2008, this time asking them to rate the relevancy of all nine dynamics. In November 2008, round-two responses were returned, analysed, summarised and documented. Final results confirmed stability in responses and met Delphi study guidelines. The final contribution is twofold. Firstly, findings confirm all nine dynamics as key components of the proposed CDF for delivering innovative change within an organisation. Secondly, the future development and testing of an ‘Innovative Change Delivery Process’ (ICDP) is proposed, one that is underpinned by an ‘Innovative Change Decision-making Framework’ (ICDF), an ‘Innovative Change Delivery Analysis’ (ICDA) program, and an ‘Innovative Change Delivery Guide’ (ICDG).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report details the findings of the Food Literacy Delphi Study. This study was the first of three studies commissioned by Health Promotion Queensland, Queensland Health. It examines the views of experts from around Australia about food literacy; its meaning, potential components and relationship to nutrition.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Business Process Management (BPM) is a topic that continues to grow in significance as organisations seek to gain and sustain competitive advantage in an increasingly global environment. Despite anecdotal evidence of organisations improving performance by pursuing a BPM approach, there is little theory that explains and substantiates this relationship. This study provides the first theory on the progression and maturity of BPM Initiatives within organisations and provides a vital starting block upon which future research in this area can build. The Researcher starts by clearly defining three key terms (BPM Initiative, BPM Progression and BPM Maturity), showing the relationship between these three concepts and proposing their relationship with Organisational Performance. The Researcher then combines extant literature and use of the Delphi Technique and the case study method to explore the progression and measurement of the BPM Initiatives within organisations. The study builds upon the principles of general theories including the Punctuated Equilibrium Model and Dynamic Capabilities to present theory on BPM Progression and BPM Maturity. Using the BPM Capability Framework developed through an international Delphi study series, the Researcher shows how the specific organisational context influences which capability areas an organisation chooses to progress. By comparing five separate organisations over an extended time the Researcher is able to show that, despite this disparity, there is some evidence of consistency with regard to the capability areas progressed. This suggests that subsequent identification of progression paths may be possible. The study also shows that the approach and scope taken to BPM within each organisation is a likely predictor of such paths. These outcomes result in the proposal of a formative model for measuring BPM Maturity.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Preterm infants commence breastfeeding when health-care professionals deem them to be ready. However, the optimal timing for commencement of breastfeeding is unclear. Currently, there is little guidance for neonatal care providers to decide when to initiate breastfeeding among preterm infants. A mixed-methods study was conducted to develop and test the Preterm Sucking Readiness (PTSR) scale in four phases. The first phase involved a chart audit to explore the use of age as a criterion by investigating when preterm infants meet feeding milestones as well as other factors that may affect an infant’s readiness to engage in nutritive sucking behaviour. The second phase utilised focus groups to explore and define how neonatal care providers decide when to commence breastfeeding. To gain consensus on the criteria mentioned by the focus groups, a Delphi survey was conducted in phase 3, involving neonatal providers across Australia and New Zealand. Phase 4 of the study involved an observational study that was used to test the six-item PTSR. The age at which specific feeding milestones were reached was consistent with what has been previously described in the literature. The chart audit showed that the time taken to the first feeding attempt in the preterm infant population was affected by gestational age at birth, birth weight, and specific interventions. Staff also considered age along with other criteria when deciding when to initiate feeding. Consensus on nine criteria for inclusion into the six-item PTSR was achieved using the Delphi technique. Three items of PTSR showed significant differences between the preterm and fullterm infant groups. Only two items, feeding-readiness behaviour and low pulse oximetry during handling, explained the variance in breastfeeding behaviour. The inter-rater variability ranged between moderate and very good for the PTSR items. The results of this study indicate the importance of assessing behavioural cues as an indication of breastfeeding readiness in the preterm infant population, once an infant is deemed physiologically stable. Age continues to be a factor in some clinicians' decisions to commence breastfeeding. However, age alone cannot be used to decide if an infant is ready to engage in breastfeeding. Further research is needed to confirm these findings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The underlying objective of this study was to develop a novel approach to evaluate the potential for commercialisation of a new technology. More specifically, this study examined the 'ex-ante'. evaluation of the technology transfer process. For this purpose, a technology originating from the high technology sector was used. The technology relates to the application of software for the detection of weak signals from space, which is an established method of signal processing in the field of radio astronomy. This technology has the potential to be used in commercial and industrial areas other than astronomy, such as detecting water leakages in pipes. Its applicability to detecting water leakage was chosen owing to several problems with detection in the industry as well as the impact it can have on saving water in the environment. This study, therefore, will demonstrate the importance of interdisciplinary technology transfer. The study employed both technical and business evaluation methods including laboratory experiments and the Delphi technique to address the research questions. There are several findings from this study. Firstly, scientific experiments were conducted and these resulted in a proof of concept stage of the chosen technology. Secondly, validation as well as refinement of criteria from literature that can be used for „ex-ante. evaluation of technology transfer has been undertaken. Additionally, after testing the chosen technology.s overall transfer potential using the modified set of criteria, it was found that the technology is still in its early stages and will require further development for it to be commercialised. Furthermore, a final evaluation framework was developed encompassing all the criteria found to be important. This framework can help in assessing the overall readiness of the technology for transfer as well as in recommending a viable mechanism for commercialisation. On the whole, the commercial potential of the chosen technology was tested through expert opinion, thereby focusing on the impact of a new technology and the feasibility of alternate applications and potential future applications.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Under pressure from both the ever increasing level of market competition and the global financial crisis, clients in consumer electronics (CE) industry are keen to understand how to choose the most appropriate procurement method and hence to improve their competitiveness. Four rounds of Delphi questionnaire survey were conducted with 12 experts in order to identify the most appropriate procurement method in the Hong Kong CE industry. Five key selection criteria in the CE industry are highlighted, including product quality, capability, price competition, flexibility and speed. This study also revealed that product quality was found to be the most important criteria for the “First type used commercially” and “Major functional improvements” projects. As for “Minor functional improvements” projects, price competition was the most crucial factor to be considered during the PP selection. These research findings provide owners with useful insights to select the procurement strategies.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Many academic researchers have conducted studies on the selection of design-build (DB) delivery method; however, there are few studies on the selection of DB operational variations, which poses challenges to many clients. The selection of DB operational variation is a multi-criteria decision making process that requires clients to objectively evaluate the performance of each DB operational variation with reference to the selection criteria. This evaluation process is often characterized by subjectivity and uncertainty. In order to resolve this deficiency, the current investigation aimed to establish a fuzzy multicriteria decision-making (FMCDM) model for selecting the most suitable DB operational variation. A three-round Delphi questionnaire survey was conducted to identify the selection criteria and their relative importance. A fuzzy set theory approach, namely the modified horizontal approach with the bisector error method, was applied to establish the fuzzy membership functions, which enables clients to perform quantitative calculations on the performance of each DB operational variation. The FMCDM was developed using the weighted mean method to aggregate the overall performance of DB operational variations with regard to the selection criteria. The proposed FMCDM model enables clients to perform quantitative calculations in a fuzzy decision-making environment and provides a useful tool to cope with different project attributes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose-- DB clients play a vital role in the delivery of DB system and the clients’ competences are critical to the success of DB projects. Most of DB clients, however, remain inexperienced with the DB system. This study, therefore, aims to identify the key competences that DB clients should possess to ensure the success of DB projects in the construction market of China. Design/Methodology/Approach -- Five semi-structured face-to-face interviews and two rounds Delphi questionnaire survey were conducted in the construction market of China to identify the key competences of DB clients. Rankings have been assigned to these key competences on the basis of their relative importance. Findings-- Six ranked key competences of DB clients have been identified, which are, namely, (1) the ability to clearly define project scope and objectives; (2) financial capacity for the projects; (3) capacity in contract management; (4) adequate staff or consulting team; (5) effective coordination with DB contractors and (6) experience with similar design-build projects. Calculation of Kendall’s Coefficient of Concordance (W) indicates a statistically significant consensus of panel experts on these top six key competences. Practical implications—Clients should clearly understand the competence requirements in DB projects and should assess their DB capability before going for the DB option. Originality/Value-- The examination of DB client’s key competences will help the client deepen the understanding of the DB system. DB clients can also make use of the research findings as guidelines to improve their DB competence.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Design-builders play a vital role in the success of DB projects. In the construction market of the People’s Republic of China, most of the design-builders, however, lack adequate competences to conduct the DB projects successfully. The objective of this study is, therefore, to identify the key competences that design-builders should possess to not only ensure the success of DB projects but also acquire the competitive advantages in the DB market. Five semi-structured face-to-face interviews and two rounds of Delphi questionnaire survey were conducted to identify the key competences of design-builders. Rankings have been assigned to these key competences on the basis of their relative importance. Six ranked key competences of design-builders have been identified, which are, namely, (1) experience with similar DB projects; (2) capability of corporate management; (3) combination of building techniques and design expertise; (4) financial capability for DB projects; (5) enterprise qualification and scale; and (6) credit records and reputation in the industry. The design-builders can make use of the research findings as guidelines to improve their DB competence. These research findings will also be useful to clients during the selection of design-builders.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The design-build system has been demonstrated as an effective delivery method and gained popularity worldwide. Although there are an increasing number of clients adopting DB method in China, most of them remain inexperienced with method. The objective of this study is therefore to identify the key competences that a client or its consultant should possess to ensure the success of DB projects. Face-to-face interviews and a two-round Delphi questionnaire survey were conducted to find the following six key competences of clients, which include the (1) ability to clearly articulate project scope and objectives; (2) financial capacity for DB projects; (3) capability in contract management; (4) adequate staff or consulting team; (5) effective coordination with contractors and (6) experience with similar DB projects. This study will hopefully provide clients with measures to evaluate their DB competence and further promote their understanding of DB system in the PRC.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

China has experienced an extraordinary level of economic development since the 1990s, following excessive competition between different regions. This has resulted in many resource and environmental problems. Land resources, for example, are either abused or wasted in many regions. The strategy of development priority zoning (DPZ), proposed by the Chinese National 11th Five-Year Plan, provides an opportunity to solve these problems by coordinating regional development and protection. In line with the rational utilization of land, it is proposed that the DPZ strategy should be integrated with regional land use policy. As there has been little research to date on this issue, this paper introduces a system dynamic (SD) model for assessing land use change in China led by the DPZ strategy. Land use is characterized by the prioritization of land development, land utilization, land harness and land protection (D-U-H-P). By using the Delphi method, a corresponding suitable prioritization of D-U-H-P for the four types of DPZ, including optimized development zones (ODZ), key development zones (KDZ), restricted development zones (RDZ), and forbidden development zones (FDZ) are identified. Suichang County is used as a case study in which to conduct the simulation of land use change under the RDZ strategy. The findings enable a conceptualization to be made of DPZ-led land use change and the identification of further implications for land use planning generally. The SD model also provides a potential tool for local government to combine DPZ strategy at the national level with land use planning at the local level.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Design-build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to the many advantages offered on projects by such systems. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. In order to provide evidence of the benefits of DB, it is essential to identify the factors that can contribute to successful DB implementation and this paper aims to provide evidence of such factors that can promote the successful implementation of DB project delivery systems on Indonesian road infrastructure projects. Four main factors and 28 indicators were identified from an extensive literature review, and a Delphi questionnaire survey was conducted amongst 20 experts drawn from the Indonesian road infrastructure construction sector. The first round Delphi study found that regulation, competency of clients, ability to manage DB projects and external conditions were the major factors that can promote successful DB implementation.