920 resultados para Chicago and North Western Railway Company
Resumo:
330 km 2 of the easter-n part of the Archean Manitou Lakes - Stormy Lake metavolcanic - metasedimentary belt have been mapped and sampled. A large number of rocks ~.vere analyzed for the major and trace constituents including the rare-earth elements (REE). The Stormy Lake - Kawashegamuk Lake area may be subdivided into four major lithological groups of supracrustal rocks 1) A north-facing mafic assemblage, consisting of pillowed tholeiitic basalts and gabbro sills characterized by flat REE profiles, is exposed in the south part of the map area and belongs to a 8000 m thick homoclinal assemblage outside the map area. Felsic pyroclastic rocks believed to have been issued from a large central vent conformably overlie the tholeiites. 2) A dominantly epiclastic group facing to the north consists of terrestrial deposits interpreted to be an alluvial fan deposit ; a submarine facies is represented by turbiditic sediments. 3) The northeastern part of the study area consists of volcanic rocks belonging to two mafic - felsic cycles facing to the southuest ; andesitic flows with fractionated REE patterns make up a large part of the upper cycle, whereas the lower cycle has a stronger chemical polarity being represented by tholeiitic flows, with flat REE, which a r e succeeded by dacitic and rhyolitic pyroclasti cs. iii 4) A thick monotonous succession of tholeiitic pillmled basalt f lows and gabbro sills with flat REE represent the youngest supracrustal rocks. TIle entire belt underwent folding, faulting and granitic plutonism during a tectono-thermal event around 2700 Ma ago. Rocks exposed in the map area were subjected to regional greenschist facies metamorphism, but higher metamorphic grades are present near late granitic intrusions. Geochemical studies have been useful in 1) distinguishing the various rock units ; 2) relating volcanic and intrusive rocks 3) studying the significance of chemical changes due to post magmatic processes 4) determining the petrogenesis of the major volcanic rock types. In doing so, two major volcanic suites have been recognized : a) a tholeiitic suite, mostly represented by mafic rocks, was derived from partial melting of upper mantle material depleted in Ti, K and the light REE ; b) a calc-alkalic suite which evolved from partial melting of amphibolite in the lower crust. The more differentiated magma types have been produced by a multistage process involving partial melting and fractional crystallization to yield a continuum of compos i t i ons ranging from basaltic andesite to rhyolite. A model for the development of the eastern part of the Manitou Lakes - Stormy Lake belt has been proposed.
Resumo:
The Q.N.S. [Quebec North Shore Paper Company] newsprint mill started in 1937 at Baie Comeau in Quebec. Being the first major industry in that area at the time, harbour facilities, a power station and an entire community was built around the mill. In 1952, a power station was built at the first falls of the Manicouagan River. The station generated much more power than necessary for the mill, but attracted an aluminum smelter a few years later in 1958.
Resumo:
William Alexander Thomson (1816-1878) was a promoter and developer of railway systems in western Ontario. He incorporated the Fort Erie Railroad Company in 1857, purchased the Erie and Ontario Railroad in 1863, and incorporated the Erie and Niagara Extension Railway Company in 1868 (later renamed the Canada Southern Railway). Thomson was also elected to the House of Commons for Welland in 1872, and re-elected in 1874. He was known for his support of public management of the currency and is seen as a pioneer advocate of government monetary policy. He was also an advocate of radical agrarian economic doctrine, believing that Canadian laws favoured mercantile interests over those of the producers of goods, and that this hindered national development.
Resumo:
Indenture of release by executors between Richard Miller, John L. Ranney and Richard Woodruff, all of St. Catharines and Joseph A. Woodruff of Clifton, all executors of the will of Samuel Zimmerman of the first part and The Great Western Railway Company of the second part. Parties of the second part have exonerated parties of the first part to undertake and complete the Sarnia branch of the railway. Also, parties of the first part believe they are entitled to compensation as the death of Zimmerman was caused while travelling on one of the carriages belonging to said company. A sum of $150,000 was agreed upon to be paid to the executors by the Great Western Railway Company, September 7, 1858.
Resumo:
Clipping regarding the original road allowance which was part of Mr. Woodruff’s property, n.d. Clipping regarding the Lock 2 Bridge. This is a letter to the editor of the Journal from Calvin Phelps of Lockport, Nov. 13, 1889. Clipping entitled “Settled beyond a Dispute”: a letter to the Editor of the Star from J. G. Currie regarding the road allowance in the 5th Concession of Grantham, Nov. 16, 1889. Clipping entitled “That Old Road Allowance” which is a rebuttal to Mr. Currie’s letter, [1889] 2 newspaper clippings regarding: “Reg. vs. Toronto Railway Company”. These 2 articles are glued to a piece of paper. Beneath the newspaper articles is the name M. Chambers, Nov. 18, 1898. Notes regarding the clippings are enclosed with the articles. These notes and written on the back of “Pattison, Collier and Shaw Barristers, Solicitors, Etc.” stationary (notes are 2 pages, handwritten), Nov. 18, 1898. Clipping entitled “History on the Site: St. Davids’ Students Learn Lessons where Events Occurred” (2 copies), n.d.
Resumo:
Amount paid to Frederick Holmes by the Welland Railway Company for 26 days of service during February, March and April for excavations made at Port Dalhousie (1 page, handwritten). This is signed by S.D. Woodruff, Aug. 28, 1860.
Resumo:
Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of June, July, August and September, 1854.
Resumo:
Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of April and May, 1854, signed by S.D. Woodruff, May 31, 1854.
Resumo:
Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of June, July, August and September, 1854, signed by S.D. Woodruff, Sept. 30, 1854.
Resumo:
Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of October, November and December, 1854, signed by S.D. Woodruff, Jan. 8, 1855.
Resumo:
Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of January and February, 1855.
Resumo:
Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of October, January, February and March, 1855, signed by S.D. Woodruff, Mar. 22, 1855.
Resumo:
Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of April and May, 1855, signed by S.D. Woodruff, June 13, 1855.
Resumo:
Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of June, July and August, 1855, signed by S.D. Woodruff. There is an envelope included with this document, Aug. 21, 1855.
Resumo:
Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of March, April and May, 1856.