948 resultados para open-pit coal mining


Relevância:

100.00% 100.00%

Publicador:

Resumo:

El proyecto se centra en la caracterización, evaluación, diseño de la explotación y tratamiento de un yacimiento de fosfato precámbrico cristalizado. Este se desarrolla a partir de los datos obtenidos de la prospección minera del mismo realizada anteriormente. Esto condujo a la evaluación mediante modelo de bloques y el diseño de explotación por el método de cielo abierto. El diseño de la planta de tratamiento se basó en estudios mineralúrgicos y de recuperación, incluyendo el cálculo del relleno de las cámaras con pasta y el vertido de estériles necesario. Completado con el plan de restauración cierre y abandono de la explotación. ABSTRACT The project focuses on the characterization, evaluation, design of mining operation and processing plant of precambrian phosphate deposit. This is developed from data obtained from the mineral exploration undertaken previously. This led to the evaluation by the block model designing and operating by open pit method. The design of the treatment plant was based on mineralurgy studies and mineral recovery, including the calculation of filled labors with pasta and sterile deposit necessary. Completed with the restoration, close and abandonment plan of the mine.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mountaintop removal (MTR) coal mining has had a significant influence on the water sources within the Coal River watershed of West Virginia. Using an approach such as Integrated Water Resources Management (IWRM) may improve management for the long-term protection and sustainability of the Coal River watershed‰Ûªs water resources. This Capstone project analyzes current site-specific information related to water quality and quantity and the impacts of MTR in the region, reviews current management challenges, and identifies key stakeholders to be included in IWRM planning. This information provided a foundation for the development of a preliminary IWRM coordination plan for the Coal River watershed based on IWRM principles and guidelines. It is hoped that this preliminary plan will contribute to the development of a final coordinated IWRM plan.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Four letters written to his mother while she was traveling in Europe with sister Delia. He provides updates on the well being and activities of his siblings and father, including a coal mining venture undertaken by brother Frederic at Gay Head, Martha’s Vineyard. He also reports on the "miserable" state of the family’s finances and suggests marrying sister Delia to an Englishman with a fortune.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Prepared for the Office of Coal Research, Dept. of the Interior...by the Pittsburg & Midway Coal Mining Co., Kansas City, Mo.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

No. 33 is the final no. of this series.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Summary: On June 22, 2001, the groundwork was laid for the construction of new electric generation in the state of Illinois when the Illinois Resource Development and Energy Act was signed. Overwhelmingly approved by the Illinois General Assembly, this broad-based $3.5 billion package is designed to reinvigorate the Illinois coal industry and to strengthen the state's ability to provide electricity to its citizens. The legislation (Public Act 92-0012) provides tax incentives and financial assistance to builders of new electric plants generating in excess of 400 megawatts that create Illinois coal-mining jobs, new and expanding coal mines, and natural gas-fired baseload electric plants with a capacity of 1,000 megawatts. The legislation also directs the the Illinois Environmental Protection Agency to explore the need for a state-level, multi-pollutant strategy to reduce emissions from coal-fired electric generating plants.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Vols. for 1955-1962 include: Mining guidebook and buying directory.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Latest issue consulted: Bulletin 31, published 1927.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The occurrence of rockbursts was quite common during active mining periods in the Champion reef mines of Kolar gold fields, India. Among the major rockbursts, the ‘area-rockbursts’ were unique both in regard to their spatio-temporal distribution and the extent of damage caused to the mine workings. A detailed study of the spatial clustering of 3 major area-rockbursts (ARB) was carried out using a multi-fractal technique involving generalized correlation integral functions. The spatial distribution analysis of all 3 area-rockbursts showed that they are heterogeneous. The degree of heterogeneity (D2 – D∞) in the cases of ARB-I, II and III were found to be 0.52, 0.37 and 0.41 respectively. These differences in fractal structure indicate that the ARBs of the present study were fully controlled by different heterogeneous stress fields associated with different mining and geological conditions. The present study clearly showed the advantages of the application of multi-fractals to seismic data and to characterise, analyse and examine the area-rockbursts and their causative factors in the Kolar gold mines.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An alternative explanation for the modes of failure of large scale failures of open pit walls to those of classical slope stability theory is proposed that makes use of the concept of a transition zone, which is described by a modified Prandtls prism.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Organisations are constantly seeking efficiency improvements for their business processes in terms of time and cost. Management accounting enables reporting of detailed cost of operations for decision making purpose, although significant effort is required to gather accurate operational data. Business process management is concerned with systematically documenting, managing, automating, and optimising processes. Process mining gives valuable insight into processes through analysis of events recorded by an IT system in the form of an event log with the focus on efficient utilisation of time and resources, although its primary focus is not on cost implications. In this paper, we propose a framework to support management accounting decisions on cost control by automatically incorporating cost data with historical data from event logs for monitoring, predicting and reporting process-related costs. We also illustrate how accurate, relevant and timely management accounting style cost reports can be produced on demand by extending open-source process mining framework ProM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite opposition from environmentalists, farmers and parts of the fishing industry, on 23 August 2012, the $6.4bn Alpha Coal mine and rail project in Queensland was approved under the EPBC Act, subject to 19 conditions.1 The approval relates to the proposed construction and operation of an open-cut coal mine and 495km railway line to Abbott Point...