819 resultados para disaster recovery
Resumo:
In 2011 Queensland suffered both floods and cyclones, leaving residents without homes and their communities in ruins (2011). This paper presents how researchers from QUT, who are also members of the Oral History Association of Australia (OHAA) Queensland’s chapter, are using oral history, photographs, videography and digital storytelling to help heal and empower rural communities around the state and how evaluation has become a key element of our research. QUT researchers ran storytelling workshops in the capital city of Brisbane i early 2011, after the city suffered sever flooding. Cyclone Yasi then struck the town of Cardwell (in February 2011) destroying their historical museum and recording equipment. We delivered an 'emergency workshop', offering participants hands on use of the equipment, ethical and interviewing theory, so that the community could start to build a new collection. We included oral history workshops as well as sessions on how best to use a video camera, digital camera and creative writing sessions, so the community would also know how to make 'products' or exhibition pieces out of the interviews they were recording. We returned six months later to conduct follow-up workshops and the material produced by and with the community had been amazing. More funding has now been secured to replicate audio/visual/writing workshops in other remote rural Queensland communities including Townsville, Mackay and Cunnamulla and Toowoomba in 2012, highlighting the need for a multi media approach, to leverage the most out of OH interviews as a mechanism to restore and promote community resilience and pride.
Resumo:
In wastewater treatment plants based on anaerobic digestion, supernatant and outflows from sludge dewatering systems contain significantly high amount of ammonium. Generally, these waters are returned to the head of wastewater treatment plant (WWTP), thereby increasing the total nitrogen load of the influent flow. Ammonium from these waters can be recovered and commercially utilised using novel ion-exchange materials. Mackinnon et al. have described an approach for removal and recovery of ammonium from side stream centrate returns obtained from anaerobic digester of a typical WWTP. Most of the ammonium from side streams can potentially be removed, which significantly reduces overall inlet demand at a WWTP. However, the extent of reduction achieved depends on the level of ammonium and flow-rate in the side stream. The exchange efficiency of the ion-exchange material, MesoLite, used in the ammonium recovery process deteriorates with long-term use due to mechanical degradation and use of regenerant. To ensure that a sustainable process is utilised a range of potential applications for this “spent” MesoLite have been evaluated. The primary focus of evaluations has been use of ammonium-loaded MesoLite as a source of nitrogen and growth medium for plants. A MesoLite fertiliser has advantage over soluble fertilisers in that N is held on an insoluble matrix and is gradually released according to exchange equilibria. Many conventional N fertilisers are water-soluble and thus, instantly release all applied N into the soil solution. Loss of nutrient commonly occurs through volatilisation and/or leaching. On average, up to half of the N delivered by a typical soluble fertiliser can be lost through these processes. In this context, use of ammonium-loaded MesoLite as a fertiliser has been evaluated using standard greenhouse and field-based experiments for low fertility soils. Rye grass, a suitable test species for greenhouse trials, was grown in 1kg pots over a period of several weeks with regular irrigation. Nitrogen was applied at a range of rates using a chemical fertiliser as a control and using two MesoLite fertilisers. All other nutrients were applied in adequate amounts. All treatments were replicated three times. Plants were harvested after four weeks, and dry plant mass and N concentrations were determined. At all nitrogen application rates, ammonium-loaded MesoLite produced higher plant mass than plants fertilised by the chemical fertiliser. The lower fertiliser effectiveness of the chemical fertliser is attributed to possible loss of some N through volatilisation. The MesoLite fertilisers did not show any adverse effect on availability of macro and trace nutrients, as shown by lack of deficiency symptoms, dry matter yield and plant analyses. Nitrogen loaded on to MesoLite in the form of exchanged ammonium is readily available to plants while remaining protected from losses via leaching and volatilisation. Spent MesoLite appears to be a suitable and effective fertiliser for a wide range of soils, particularly sandy soils with poor nutrient holding capacity.
Resumo:
Environmental Burkholderia pseudomallei isolated from sandy soil at Castle Hill, Townsville, in the dry tropic region of Queensland, Australia, was inoculated into sterile-soil laboratory microcosms subjected to variable soil moisture. Survival and sublethal injury of the B. pseudomallei strain were monitored by recovery using culture-based methods. Soil extraction buffer yielded higher recoveries as an extraction agent than sterile distilled water. B. pseudomallei was not recoverable when inoculated into desiccated soil but remained recoverable from moist soil subjected to 91 days desiccation and showed a growth response to increased soil moisture over at least 113 days. Results indicate that endemic dry tropic soil may act as a reservoir during the dry season, with an increase in cell number and potential for mobilization from soil into water in the wet season.
Resumo:
Video-based training combined with flotation tank recovery may provide an additional stimulus for improving shooting in basketball. A pre-post controlled trial was conducted to assess the effectiveness of a 3 wk intervention combining video-based training and flotation tank recovery on three-point shooting performance in elite female basketball players. Players were assigned to an experimental (n=10) and control group (n=9). A 3 wk intervention consisted of 2 x 30 min float sessions a week which included 10 min of video-based training footage, followed by a 3 wk retention phase. A total of 100 three-point shots were taken from 5 designated positions on the court at each week to assess three-point shooting performance. There was no clear difference in the mean change in the number of successful three-point shots between the groups (-3%; ±18%, mean; ±90% confidence limits). Video-based training combined with flotation recovery had little effect on three-point shooting performance.
Resumo:
Analyzing emotional states under duress or during heightened, life-and-death situations is extremely difficult, especially given the inability of laboratory experiments to replicate the environment and given the inherent biases of post event surveys. This is where natural experiments, such as the pager communications from September 11th can provide the kind of natural experiment emotion researchers have been seeking. We demonstrate that positive and pro-social communications are the first to emerge followed by the slower and lower negative communications. Religious sentiment is the last to emerge, as individual attempt to make sense of event. Additionally we provide a methodological discussion about the preparation and analysis of such natural experiments (the pager message content) and show the importance of using multiple methods to extract the broadest possible understanding.
Resumo:
Due to the propensity of fleet incidents, poor organisational survey results and a lack of fleet safety systems, it was evident that Redland City Council were underperforming, experiencing a variety of work related road safety issues and possessed a low fleet safety culture. As a result of an audit process, and the identification of gaps in organisational process within the fleet safety area Redland City Council embarked upon the enormous task of strategically implementing initiatives and improving fleet safety across the organisation. The strategies utilised within the Redland City Council Fleet Safety Initiative were implemented utilising a systematic process and adopted a multi-disciplinary approach to improve overall fleet safety. Organisational initiatives targeting fleet safety aspects have benefited the Council by the development of an improved organisational culture, including safer driver attitudes and behaviour. This paper outlines the road to recovery for Redland City Council in relation to its fleet safety initiatives.
Resumo:
Unlike most normal construction projects, post-disaster housing projects are diverse in nature, have unique socio-cultural and economical requirements, and are extremely dynamic and thus necessitate a meaningful and dynamic response. Post-disaster reconstruction practices that lack a strategy compatible with the severity of disaster, community culture, socio-economic requirements, environmental condition, government legislations, and technical and technological situations, often fail to operate and respond effectively to the needs of the wider affected population. Factors that frequently pose real threats to the eventual success of reconstruction projects are rarely given appropriate consideration when designing such projects. Research into past reconstruction practices has shown that ignoring these factors altogether or failing to give them meaningful consideration can affect housing reconstruction projects. In other words, they either miss their targets altogether or undergo serious modifications after their occupancy, subsequently resulting in an overall loss of project resources. This article touches upon the common factors that negatively impact the outcome of such projects.
Resumo:
Fluid Infrastructure: Landscape Architecture Exhibition: This exhibition showcases the work of 4th Year undergraduate landscape architecture students in response to the 2011 Queensland floods through five installations: Systima Fluid Flux Flex Fluid Connectivity The Floods Verge Fluid Evolution The focus of these installations is the post-flood conditions of Brisbane’s riverside public infrastructure, within a scenario of flood as a normalised event. It recognises that within this scenario, parts of this city cannot be described as definitively ‘land’ or ‘water,’ but are best described as ‘fluid terrains’(Mathur, A. and Da Cunha, D. 2006). The landscape design propositions within the five installations include public transport diversification (RiverRats) schemes, greenspace elevations, ephemeral gardens and evolving landscapes, creative interpretation and warning devices and systems. These propositions do not resist fluid conditions, but work with them to propose a more resilient urban river landscape than Brisbane currently has. This QUT exhibition was developed as part of the 2011 Flood of Ideas Project (http://www.floodofideas.org.au) in partnership with Healthy Waterways (Water by Design), State Library of Queensland (The Edge), Brisbane City Council, Australian Institute of Architects, University of Queensland, Green Cross Australia, Stormwater Industry Association.
Resumo:
While scientists continue to explore the level of climate change impact to new weather patterns and our environment in general, there have been some devastating natural disasters worldwide in the last two decades. Indeed natural disasters are becoming a major concern in our society. Yet in many previous examples, our reconstruction efforts only focused on providing short-term necessities. How to develop resilience in the long run is now a highlight for research and industry practice. This paper introduces a research project aimed at exploring the relationship between resilience building and sustainability in order to identify key factors during reconstruction efforts. From extensive literature study, the authors considered the inherent linkage between the two issues as evidenced from past research. They found that sustainability considerations can improve the level of resilience but are not currently given due attention. Reconstruction efforts need to focus on resilience factors but as part of urban development, they must also respond to the sustainability challenge. Sustainability issues in reconstruction projects need to be amplified, identified, processed, and managed properly. On-going research through empirical study aims to establish critical factors (CFs) for stakeholders in disaster prone areas to plan for and develop new building infrastructure through holistic considerations and balanced approaches to sustainability. A questionnaire survey examined a range of potential factors and the subsequent data analysis revealed six critical factors for sustainable Post Natural Disaster Reconstruction that include: considerable building materials and construction methods, good governance, multilateral coordination, appropriate land-use planning and policies, consideration of different social needs, and balanced combination of long-term and short-term needs. Findings from this study should have an influence on policy development towards Post Natural Disaster Reconstruction and help with the achievement of sustainable objectives.
Resumo:
Post–disaster reconstruction projects are often considered ineffectual or unproductive because on many occasions in the past they have performed extremely poorly during post-contract occupation, or have failed altogether to deliver acceptable outcomes. In some cases, these projects have already failed even before their completion, leading many sponsor aid organisations to hold these projects up as examples of how not to deliver housing reconstruction. Research into some previous unsuccessful projects has revealed that often the lack of adequate knowledge regarding the context and complexity involved in the implementation of these projects is generally responsible for their failure. Post-disaster reconstruction projects are certainly very complex in nature, often very context-specific and they can vary widely in magnitude. Despite such complexity, reconstruction projects can still have a high likelihood of success if adequate consideration is given to the importance of factors which are known to positively influence reconstruction efforts. Good outcomes can be achieved when planners and practitioners ensure best practices are embedded in the design of reconstruction projects at the time reconstruction projects they are first instigated. This paper outlines and discusses factors that significantly contribute to the successful delivery of post-disaster housing reconstruction projects.
Resumo:
The 2011 floods in Southeast Queensland had a devastating impact on many sectors including transport. Road and rail systems across all flooded areas of Queensland were severely affected and significant economic losses occurred as a result of roadway and railway closures. Travellers were compelled to take alternative routes because of road closures or deteriorated traffic conditions on their regular route. Extreme changes in traffic volume can occur under such scenarios which disrupts the network re-equilibrium and re-stabilisation in the recovery phase as travellers continuously adjust their travel options. This study explores how travellers respond to such a major network disruption. A comprehensive study was undertaken focusing on how bus riders reacted to the floods in Southeast Queensland by comparing the ridership patterns before, during and after the floods. The study outcomes revealed the evolving reactions of transit users to direct and indirect impacts of a natural disaster. A good understanding of this process is crucial for developing appropriate strategies to encourage modal shift of automobile users to public transit and also for modelling of travel behaviours during and after a major network disruption caused by natural disasters.
Resumo:
Objective To evaluate the time course of the recovery of transverse strain in the Achilles and patellar tendon following a bout of resistance exercise. Methods Seventeen healthy adults underwent sonographic examination of the right patellar (n=9) and Achilles (n=8) tendons immediately prior to and following 90 repetitions of weight-bearing quadriceps and gastrocnemius-resistance exercise performed against an effective resistance of 175% and 250% body weight, respectively. Sagittal tendon thickness was determined 20 mm from the enthesis and transverse strain, as defined by the stretch ratio, was repeatedly monitored over a 24 h recovery period. Results Resistance exercise resulted in an immediate decrease in Achilles (t7=10.6, p<0.01) and patellar (t8=8.9, p<0.01) tendon thickness, resulting in an average transverse stretch ratio of 0.86±0.04 and 0.82±0.05, which was not significantly different between tendons. The magnitude of the immediate transverse strain response, however, was reduced with advancing age (r=0.63, p<0.01). Recovery in transverse strain was prolonged compared with the duration of loading and exponential in nature. The average primary recovery time was not significantly different between the Achilles (6.5±3.2 h) and patellar (7.1±3.2 h) tendons. Body weight accounted for 62% and 64% of the variation in recovery time, respectively. Conclusions Despite structural and biochemical differences between the Achilles and patellar tendon, the mechanisms underlying transverse creep recovery in vivo appear similar and are highly time dependent. These novel findings have important implications concerning the time required for the mechanical recovery of high-stress tendons following an acute bout of exercise.
Resumo:
Ramp metering is an effective motorway control tool beneficial for mainline traffic, but the long on-ramp queues created interfere with surface traffic profoundly. This study deals with the conflict between mainline benefits and thecosts of on-ramp and surface traffic. A novel local on-ramp queue management strategy with mainline speed recovery is proposed. Microscopic simulation is used to test the new strategy and compare it with other strategies. Simulation results reveal that the ramp metering with queue management strategy provides a good balance between the mainline and on-ramp performances.
Resumo:
The Oceania region is an area particularly prone to natural disasters such as cyclones, tsunamis, floods, droughts, earthquakes and volcanic eruptions. Many of the nations in the region are Small Island Developing States (SIDS), yet even within wealthy states such as Australia and New Zealand there are groups which are vulnerable to disaster. Vulnerability to natural disaster can be understood in human rights terms, as natural disasters threaten the enjoyment of a number of rights which are guaranteed under international law, including rights to health, housing, food, water and even the right to life itself. The impacts of climate change threaten to exacerbate these vulnerabilities, yet, despite the foreseeability of further natural disasters as a result of climate change, there currently exists no comprehensive international framework for disaster response offering practical and/or legally reliable mechanisms to assist at‐risk states and communities. This paper sets out to explore the human rights issues presented by natural disasters and examine the extent to which these issues can be addressed by disaster response frameworks at the international, regional and national levels.
Resumo:
As highlighted by previous work in Normal Accident Theory1 and High Reliability Organisations, 2 the ability of a system to be flexible is of critical importance to its capability to prepare for, respond to, and recover from disturbance and disasters. This paper proposes that the research into ‘edge organisations’3 and ‘agility’4 is a potential means to operationalise components that embed high reliable traits in the management and oversight of critical infrastructure systems. Much prior work has focused on these concepts in a military frame whereas the study reported on here examines the application of these concepts to aviation infrastructure, specifically, a commercial international airport. As a commercial entity functions in a distinct manner from a military organisation this study aims to better understand the complementary and contradictory components of the application of agility work to a commercial context. Findings highlight the challenges of making commercial operators of infrastructure systems agile as well as embedding traits of High Reliability in such complex infrastructure settings.