945 resultados para construction projects


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper reports the findings of an in-depth literature review, which was designed as the first phase of a study that ultimately aims to rank the importance of key governance mechanisms on collaborative construction projects, in terms of impact on value-for-money. The absence of such information in the global knowledge base has prompted the current study. Seminal research completed recently concluded that deductive evidence with regard to the performance outcomes of collaborative procurement mechanisms is currently limited (Eriksson and Westerberg 2011). The authors aim to address this gap in current understanding. The literature review identifies key features of both formal and informal mechanisms which have been applied within collaborative contracting contexts. The literature review lays a solid foundation for designing a deductive research strategy to be implemented in the second phase of the study, which will employ a large-scale quantitative survey to shed light on the governance structures of collaborative contracts, and the ways in which they impact on realisation of VfM during project delivery in the Australian infrastructure industry. The current paper aims to identify the main categories of formal and informal governance mechanisms currently being employed globally. This will provide structure for the development of the survey in the second phase of the study.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Downtime (DT) caused by non-availability of equipment and equipment breakdown has non-trivial impact on the performance of construction projects. Earlier research has often addressed this fact, but it has rarely explained the causes and consequences of DT – especially in the context of developing countries. This paper presents a DT model to address this issue. Using this model, the generic factors and processes related to DT are identified, and the impact of DT is quantified. By applying the model framework to nine road projects in Nepal, the impact of DT is explored in terms of its duration and cost. The research findings highlight how various factors and processes interact with each other to create DT, and mitigate or exacerbate its impact on project performance. It is suggested that construction companies need to adopt proactive equipment management and maintenance programs to minimize the impact of DT.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

As sustainability becomes an important principle guiding various human activities around the globe, the higher education sector is being asked to take an active part in educating and promoting sustainability due to its moral responsibility, social obligation and its own needs to adapt to new circumstances. There is a global trend of higher education institutions embarking on responses to the sustainability challenge. On-campus building performance is one of the most important indicators for “sustainable universities”, because buildings carry substantially environmental burden such as considerable consumption of raw materials and energy as well as huge amount of waste generation and greenhouse gas emission. Plus, much research proves that building performance can impact on students and staff’s awareness about and behaviours related to sustainability. The past studies rarely discussed about sustainable construction projects in universities’ unique context. Universities are labeled with distinct characteristics such as complex governance, multiple cultures and juggling missions and so on. It is necessary and meaningful to examine the project management system in terms of universities’ organizational environment. Thus, this research project applies Delphi study to identify primary barriers to green technology application in on-campus buildings, critical factors for sustainable project success, key actions in project phases and strategies for project improvement. Through three rounds of questionnaires among panel experts, the authors obtain a profound understanding of project delivery system in universities. The research results are expected to provide sustainability practitioners with holistic understanding and generic information about sustainable construction project performance on campus as an assistance tool.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Major construction projects undertaken on university campuses are an ideal opportunity to connect learners in related disciplines to the real thing. How often do universities take that opportunity, make the connection and value add to projects being carried out? Discussion with students and academic staff will consistently generate enthusiasm for creating learning activities and resources related to projects. Some typical disciplines are project management, all fields of engineering, architecture, interior design and information technology. Some other areas that may not at first seem obvious are business, marketing, communication and public relations. The authors will provide a case study based on the new Queensland University of Technology (QUT) Science and Engineering Centre project of how the partnership between QUT and Leighton Contractors, the managing contractor, has delivered excellent learning opportunities through the design and construction phases of the Science and Engineering Centre project.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose - Cultural issues in the construction industry have attracted growing attention from both practitioners and academia. However, there are few studies on culture issues at the project level. The influence of project culture has not traditionally been on the research radar. This research aims to investigate the impacts of project culture on the performance of construction projects. Design/methodology/approach - A case study approach, utilising questionnaire surveys, in-depth interviews and review of project documents, was employed to investigate project culture and its associated impacts in two major hospital projects. Findings - The results indicated that project culture played an important role in achieving harmonious relationships between project participants and better project outcomes in terms of schedule, functionality, satisfaction with the process, satisfaction with the relationships, environmental issues addressed commercial success, further business opportunities and overall performance. Case 1 outperformed Case 2 in these performance indicators. Similarly, it became clear that the project’s culture should be developed from the outset and sustained during the project period. Furthermore, it was also highlighted that the project culture should be translated to all levels of the supply chain i.e. sub-contractors and suppliers. Practical implications – The findings enabled the client to understand the role of project culture and actively commit towards the development and maintenance of the project culture from very early on. It also helps project teams to understand how to deal with cultural issues at the project level. Originality/value- This study is one of limited empirical studies that offer in-depth insights of how project culture affects the performance of construction projects. It is also the first study of hospital projects on the research topic.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Temporary Traffic Control Plans (TCP’s), which provide construction phasing to maintain traffic during construction operations, are integral component of highway construction project design. Using the initial design, designers develop estimated quantities for the required TCP devices that become the basis for bids submitted by highway contractors. However, actual as-built quantities are often significantly different from the engineer’s original estimate. The total cost of TCP phasing on highway construction projects amounts to 6–10% of the total construction cost. Variations between engineer estimated quantities and final quantities contribute to reduced cost control, increased chances of cost related litigations, and bid rankings and selection. Statistical analyses of over 2000 highway construction projects were performed to determine the sources of variation, which later were used as the basis of development for an automated-hybrid prediction model that uses multiple regressions and heuristic rules to provide accurate TCP quantities and costs. The predictive accuracy of the model developed was demonstrated through several case studies.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The objective of this research was to develop a model to estimate future freeway pavement construction costs in Henan Province, China. A comprehensive set of factors contributing to the cost of freeway pavement construction were included in the model formulation. These factors comprehensively reflect the characteristics of region and topography and altitude variation, the cost of labour, material, and equipment, and time-related variables such as index numbers of labour prices, material prices and equipment prices. An Artificial Neural Network model using the Back-Propagation learning algorithm was developed to estimate the cost of freeway pavement construction. A total of 88 valid freeway cases were obtained from freeway construction projects let by the Henan Transportation Department during the period 1994−2007. Data from a random selection of 81 freeway cases were used to train the Neural Network model and the remaining data were used to test the performance of the Neural Network model. The tested model was used to predict freeway pavement construction costs in 2010 based on predictions of input values. In addition, this paper provides a suggested correction for the prediction of the value for the future freeway pavement construction costs. Since the change in future freeway pavement construction cost is affected by many factors, the predictions obtained by the proposed method, and therefore the model, will need to be tested once actual data are obtained.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This research has developed a framework to improve the effectiveness and efficiency of stakeholder involvement during the early planning stages of residential construction projects, in order to improve many of the quality issues that occur during the construction phases of such projects. A mixed methods approach (survey, interviews and case studies) was employed to collect the required data. It is expected that with development, this framework can bring some significant benefits to future construction projects in terms of reducing rework and wastage, improving timely delivery and avoiding disputes. The research is also anticipated to produce three high impact journal articles.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction projects are a high risk business activity. When undertaking projects in an international context, it is further complicated by the risk of fluctuations in the foreign exchange rates (FOREX). Construction business performance is affected by these fluctuations. They affect progress and cause delays, which in turn create problems for subcontractors, namely cost overruns, disputes, arbitration, total abandonment and litigation. FOREX fluctuations also cause the price of raw materials to increase, leading the cost overruns. Managing FOREX risk is critical and past research have focused on the need for adequate insurance, careful planning and management, and foreign exchange futures hedging to overcome issues that have been caused by the FOREX risk. Analysis of FOREX risk in international construction business usually focused only on issues at the project level. There is currently lack of understanding of Organisational Capabilities (OC) to manage the impacts of FOREX risk, which when examined, are seen in isolation. This paper attempts to bridge the gap by discussing the impacts of FOREX fluctuations on the international construction business. The focus is on the OC perspective and the need to develop OC framework to mitigate the risk in sustaining construction business performance.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Public engagement is an essential process for major municipal infrastructure and construction projects as it serves to identify the interests and concerns of citizens before the planning and design are finalised and thus ensures the schemes are beneficial to all sectors of the community. However, the success of public engagement depends on a number of factors, not least the suitability of the engagement methods used, representativeness and activeness of participants, time pressure, financial constraint and so on. In Hong Kong, the community has experienced discontent with several major projects recently, suggesting the need to examine the effectiveness of its current public engagement mechanism. This paper reports the results of a series of interviews with a variety of stakeholders – indicating the need for a carefully considered public engagement plan to be established at the beginning to drive the process and more experienced people to lead and facilitate the engagement process.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction product innovation can exert a positive influence on project and industry performance. However, guidance is scarce on product innovation diffusion for road infrastructure, in contrast to the large body of literature on the manufacturing industry. A conceptual framework is proposed to understand these processes. Advice is given to managers based on the framework and a large quantitative survey. The framework focuses on contextual characteristics that influence the decision to adopt new-to-industry product innovation, as part of a diffusion process. Case study data are interpreted within the revised framework to test its value and disaggregate the broad obstacles to innovation. A large quantitative survey was then conducted to rank the relative importance of the obstacles constraining the adoption of innovative products on road construction projects. The three most important obstacles were found to be: (1) overemphasis on up-front project costs during tender stage; (2) disagreement over who carries the risk of new product failure; and (3) adversarial contract relations. The results suggest refinements to the conceptual framework to make it a more powerful tool for categorizing and analysing construction innovation obstacles. Results also suggest well-resourced repeat interactions within complementary procurement and regulatory systems will enhance the project teams’ ability to recognize and address innovation obstacles. Further, improved relationships are expected to decrease the need for an overly conservative approach to product approval and prescriptive specifications.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The nature of construction projects and their delivery exposes participants to accidents and dangers. Safety climate serves as a frame of reference for employees to make sense of safety measures in the workplace and adapt their behaviors. Though safety climate research abounds, fewer efforts are made to investigate the formation of a safety climate. An effort to explore forming psychological safety climate, an operationalization of safety climate at the individual level, is an appropriate starting point. Taking the view that projects are social processes, this paper develops a conceptual framework of forming the psychological safety climate, and provides a preliminary validation. The model suggests that management can create the desired psychological safety climate by efforts from structural, perceptual, interactive, and cultural perspectives. Future empirical research can be built on the model to provide a more comprehensive and coherent picture of the determinants of safety climate.