958 resultados para construction project


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

From its roots in strategic management theory, stakeholder management has been adopted by the construction management academic community and applied as a valid paradigm around which research work has been generated aiming to improve project effi ciencies and effectiveness. However, academics have argued that stakeholder management should move away from purely theoretical discussions and engage more with the realities of construction project work. This paper re-appraises the stakeholder management concept for the construction domain by re-thinking some of the fundamental principles and ideals present within the more general stakeholder theory literature. It engages with issues which researchers have arguably failed to acknowledge and calls for a re-evaluation of construction stakeholder management research by presenting a review around four distinctive themes: the moral obligations of engaging with stakeholders against the business and efficiency driven imperatives of construction organisations; the contrast between theoretical abstractions and empirically grounded research; the tensions between theoretical convergence versus calls for multiple and divergent perspectives on stakeholder management and the practicalities of conducting stakeholder management in the construction domain. Such a critical re-appraisal of stakeholder management thinking both generates new lines of enquiry and promises to help inform and shape current and future industry practice.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

An alternative approach to understanding innovation is made using two intersecting ideas. The first is that successful innovation requires consideration of the social and organizational contexts in which it is located. The complex context of construction work is characterized by inter-organizational collaboration, a project-based approach and power distributed amongst collaborating organizations. The second is that innovations can be divided into two modes: ‘bounded’, where the implications of innovation are restricted within a single, coherent sphere of influence, and ‘unbounded’, where the effects of implementation spill over beyond this. Bounded innovations are adequately explained within the construction literature. However, less discussed are unbounded innovations, where many firms' collaboration is required for successful implementation, even though many innovations can be considered unbounded within construction's inter-organizational context. It is argued that unbounded innovations require an approach to understand and facilitate the interactions both within a range of actors and between the actors and technological artefacts. The insights from a sociology of technology approach can be applied to the multiplicity of negotiations and alignments that constitute the implementation of unbounded innovation. The utility of concepts from the sociology of technology, including ‘system building’ and ‘heterogeneous engineering’, is demonstrated by applying them to an empirical study of an unbounded innovation on a major construction project (the new terminal at Heathrow Airport, London, UK). This study suggests that ‘system building’ contains outcomes that are not only transformations of practices, processes and systems, but also the potential transformation of technologies themselves.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction industry is widely recognised as being inherent with risk and uncertainty. This necessitates the need for effective project risk management to achieve the project objectives of time, cost and quality. A popular tool employed in projects to aid in the management of risk is a risk register. This tool documents the project risks and is often employed by the Project Manager (PM) to manage the associated risks on a project. This research aims to ascertain how widely risk registers are used by Project Managers as part of their risk management practices. To achieve this aim entailed interviewing ten PMs, to discuss their use of the risk register as a risk management tool. The results from these interviews indicated the prevalent use of this document and recognised its effectiveness in the management of project risks. The findings identified the front end and feasibility phases of a project as crucial stages for using risk registers, noting it as a vital ingredient in the risk response planning of the decision making process. Moreover, the composition of the risk register was also understood, with an insight into how PMs produce and develop this tool also ascertained. In conclusion, this research signifies the extensive use of the risk register by PMs. A majority of PMs were of the view that risk registers constitute an essential component of their project risk management practices. This suggests a need for further research on the extent to which risk registers actually help PMs to control the risks in a construction project, particularly residual risks, and how this can be improved to minimize deviations from expected outcomes.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM’, while judged to be successful and actively supporting users, was delivered through an exploratory and emergent development process of informal prototyping. Technical IT skills were adopted into the construction project through personal relationships and arrangements rather than formal processes. Implementation was driven by construction project employees rather than controlled centrally by the corporate IT function.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Students in the architecture, engineering, and construction disciplines are often challenged with visualizing and understanding the complex spatial and temporal relationships involved in designing and constructing three-dimensional (3D) structures. An evolving body of research traces the use of educational computer simulations to enhance student learning experiences through testing real-world scenarios and the development of student decision-making skills. Ongoing research at Pennsylvania State University aims to improve engineering education in construction through interactive construction project learning applications in an immersive virtual reality environment. This paper describes the first- and second-generation development of the Virtual Construction Simulator (VCS), a tool that enables students to simultaneously create and review construction schedules through 3D model interaction. The educational value and utility of VCS was assessed through surveys, focus group interviews, and a student exercise conducted in a construction management class. Results revealed VCS is a valuable and effective four-dimensional (4D) model creation and schedule review application that fosters collaborative work and greater student task focus. This paper concludes with a discussion of the findings and the future development steps of the VCS educational simulation

Relevância:

70.00% 70.00%

Publicador:

Resumo:

There is a renewed interest in immersive visualization to navigate digital data-sets associated with large building and infrastructure projects. Following work with a fully immersive visualization facility at the University, this paper details the development of a complementary mobile visualization environment. It articulates progress on the requirements for this facility; the overall design of hardware and software; and the laboratory testing and planning for user pilots in construction applications. Like our fixed facility, this new light-weight mobile solution enables a group of users to navigate a 3D model at a 1:1 scale and to work collaboratively with structured asset information. However it offers greater flexibility as two users can assemble and start using it at a new location within an hour. The solution has been developed and tested in a laboratory and will be piloted in engineering design review and stakeholder engagement applications on a major construction project.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Objective: To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. Background: A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. Methods: An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Results: Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. Conclusions: A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction activities of a contractor may physically take place in the home country or overseas, and the latter, particularly of a large company, has an increasing proportion with the globalisation. Globalisation of the construction industry and its market is a trend in every country, Which increases the opportunities of both international construction, and competition or collaboration with foreign construction companies. International construction project management is undertaken in a complicated circumstance, and requires a synthetic management approach. This research aims to establish a primary framework for the critical operational management in achieving international construction projects in a novel construction market.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Building demolition has been undergoing evolutionary development in its technologies for several decades. In order to achieve a high level of demolition material reuse and recycling, new management approaches are also necessitated. Several information systems are proposed or developed particularly promoting efficient project management, waste minimization and project safety. These information systems include waste exchange, 4D visualization, safety aware schedule, waste product schedule, site atTangement optimization and so on. However, the fragmented information systems applied by various parties involved in the demolition project could generate conflicts due to the lack of communication and standardization. This paper aims to develop a framework of an integrated information system for building demolition projects, which covers the major aspects of innovative management approaches and conventional construction project management perspective. Practically, the system will serve as an information portal for all demolition project team members.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

As construction companies continue to explore foreign construction markets, various international construction projects are being undertaken in all corners of the world. In an international construction project with many unique and complicated characteristics, human resource management can play a significant role in promoting the efficient use of complex human resources. The aim of this paper is to establish a valid foundation for further research on measuring the impact of human resource management economically for international construction projects. The paper examines human resource management literature and identifies the application of the related management techniques to the construction industry. In addition, the paper uses the literature analysis to describe the nature of human resource management with particular reference to international construction projects. In particular, the research described in this paper identifies economic performance factors in the implementation human resource management in international construction projects. This paper also identifies the social effects of human resource management practices.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper addresses knowledge management (KM) in a project management organisation through a case study. The case study organisation is a small- edium sized Taiwanese-owned construction company (staff size of approximately 50) with an annual turnover of approximately TWD50 (AUD$1.85) billion. Approximately one half of the company comprised project-related staff (e.g. construction project management, project documentation, estimation, procurement, and design), while the other comprised administrative and business-related staff (e.g. office administration and management, business development, and finance and accounting). The researcher undertook a series of surveys and one-on-one interviews whilst ‘embedded’ for several months with the organisation. As part of a larger research project, this case study was one of four case studies conducted in major construction organisations in Singapore, Taiwan, and Australia. The study revealed the recognition, importance and commitment of organisational culture to KM, and the effects the knowledge management initiatives have on the organisation’s ability to manage knowledge across its projects and deliver the projects at various ‘levels’ of the organisation (individual, project, departmental, and corporate). It concludes that a technologically and functionally sound KM infrastructure does not necessarily assure an organisation with a capability to manage knowledge. Organisations need to ensure that the KM repository is made up of quality and relevant contents (not just quantity), and that corporate culture (especially the willingness of individuals to share what they know) is a critical determining factor to the organisation’s ability to share, apply and create knowledge (i.e. low sharing capability leads to low application and creation capabilities).

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper addresses knowledge management (KM) in a project management organisation through a case study.

The case study organisation is a small-medium sized Taiwanese-owned construction company (staff size of approximately 50) with an annual turnover of approximately TWD50 (AUD$1.85) billion. Approximately one half of the company comprised project-related staff (e.g. construction project management, project documentation, estimation, procurement, and design), while the other comprised administrative and business-related staff (e.g. office administration and management, business development, and finance and accounting).

The researcher undertook a series of surveys and one-on-one interviews whilst ‘embedded’ for several months with the organisation. This study is part of an on-going international comparison involving major construction organisations in Singapore, Australia, and Taiwan.

This study examines the recognition, importance and commitment of organisational culture to KM, and the effects the knowledge management initiatives have on the organisation’s ability to manage knowledge across its projects and deliver the projects at various ‘levels’ of the organisation (individual, project, departmental, and corporate).

It concludes that a technologically and functionally sound KM infrastructure did not necessarily assure that an organisation had a capability to manage knowledge. Organisations need to ensure that their KM repository is made up of relevant and quality contents (not just quantity), and that corporate culture (especially the willingness of individuals to share what they know) is a critical determining factor to the organisation’s ability to share, apply and create knowledge (i.e. low sharing capability leads to low application and creation capabilities).

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A major contributory factor to poor project performance in the construction industry is known to be the lack of integration and coordination between the different disciplines involved in various stages of the procurement process. Attempts by researchers to address this problem have met with limited success, as they have focused mainly on adapting integration techniques originally developed for use in the manufacturing industry. There is therefore a need to develop a detailed understanding of the fundamental sciences that underpin the problem of integrating the procurement process across the construction project life cycle. Presents and discusses a research model for addressing major methodological issues in the analysis of design/construction relationships.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A framework is constructed that can be used to foster trust and build relationships in construction project organizations in China. The research method was based on in-depth study of two building projects in China and data were collected via face-to-face interviews. The results show that as the project progresses, the dominant relationship within each stage deepens. The deepening relationship gives rise to different types of inherent risks such as a partner's self-interest seeking behaviour and opportunistic actions. To counterbalance these risks, trust fostering tools must be employed such as careful selection and effective management of partners. The framework for fostering trust and building relationship developed in the study suggests that (1) relationship deepens from shallow dependence to deep interdependence as the project progresses; (2) different relationships bring about distinct inherent risks; and (3) different trust-fostering tools counterbalance specific inherent risks. This framework could aid in reducing adversarial relationships by suggesting ways to foster trustworthy relationships.