865 resultados para Watershed projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In participatory design projects, maintaining effective communication between facilitator and participant is essential. This paper describes the consideration given to the choice of communication modes to engage participation of rural Indonesian craftspeople over the course of a significant 3 year project that aims to grow their self-determination, design and business skill. We demonstrate the variety and subtlety of oral and written forms of communication used by the facilitator during the project. The culture, the communication skill and the influence of tacit knowledge affect the effectiveness of some modes of communication over the others, as well as the available infrastructure. Considerations are specific to the case of rural Indonesian craftspeople, but general lessons can be drawn.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As the adoption of project financing is gaining momentum, there is a concurrent need of innovation in project financing scheme in order to accelerate infrastructure assets provision in Indonesia. As the largest Muslim population in the world, sharia-compliant financing offers tremendous potential as a source for infrastructure financing for Indonesia. To realize this potential, there is a need of a framework to guide its adoption. Hence this paper discusses the potential implementation of Islamic finance to fund infrastructure projects in Indonesia. Through comparative analysis, this paper illustrates how Islamic principles can be incorporated into Indonesian infrastructure project financing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Yet Another Workflow Language (YAWL) language and environment has been used to prototype, verify, execute and analyse business processes in a wide variety of industrial domains, such as telephony, construction, supply chain, insurance services, medical environments, personnel management and the creative arts. These engagements offer the YAWL researcher community a great opportunity to validate our research findings within an industry setting, as well as discovery of possible enhancements from the end user perspective. This paper describes three such industry projects, discusses why YAWL was chosen and how it was used in each, and reacts on the insights gained along the way.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Faculty and reference librarians at the Queensland University of Technology have collaborated in an attempt to improve the quality of literature reviews in civil engineering final -year research projects. This article describes the instructional program devised and the level of faculty support for the librarians' contribution, and presents survey results revealing how students could most benefit from BI and how the classroom collaboration affected student project work. The authors offer some observations about the possible impact of 81 in general, and on engineers in particular, which may provide a focus for future research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Large infrastructure projects are a major responsibility of urban and regional governments, who usually lack expertise to fully specify the demanded projects. Contractors, typically experts on such projects due to experience with similar projects elsewhere, advise of the needed design in their bids. Producing the right design is nevertheless costly. We model such infrastructure projects taking into account their credence goods feature and the costly design effort they require and examine the performance of commonly used contracting methods. We show that when building costs are homogeneous and public information, multi-stage competitive bidding involving shortlisting of two contractors and contingent compensation of both contractors on design efforts outperforms sequential search and the traditional Design-and-Build approach. If building costs are private information of the contractors and are revealed to them after design cost is sunk, sequential search may be superior to the other two methods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project Management (PM) as an academic field is relatively new in Australian universities. Moreover, the field is distributed across four main areas: business (management), built environment and construction, engineering and more recently ICT (information systems). At an institutional level, with notable exceptions, there is little engagement between researchers working in those individual areas. Consequently, an initiative was launched in 2009 to create a network of PM researchers to build a disciplinary base for PM in Australia. The initiative took the form of a bi-annual forum. The first forum established the constituency and spread of PM research in Australia (Sense et al., 2011). This special issue of IJPM arose out of the second forum, held in 2012, that explored the notion of an Australian perspective on PM. At the forum, researchers were invited to collaborate to explore issues, methodological approaches, and theoretical positions underpinning their research and to answer the question: is there a distinctly Australian research agenda which responds to the current challenges of large and complex projects in our region? From a research point of view, it was abundantly clear at the forum that many of the issues facing Australian researchers are shared around the world. However, what emerged from the forum as the Australian perspective was a set of themes and research issues that dominate the Australia research agenda.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Australian economy is currently supported by a resources boom and work opportunities in traditionally male dominated fields of construction and engineering and information technology are at a premium. Yet despite more than 25 years of anti discrimination and equal employment opportunity legislation these industries still employ few women in operational or management roles. This paper investigates the issue of the low representation of women in project management and their different work and career experiences through interviews with male and female project managers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Between mid 2010 and early 2013, Queensland road related infrastructures were devastated by flood and cyclone related natural disasters. Responding to these recent events and in preparing for more regular and intense climate-change induced events in future, the Queensland Government is now reviewing how post-disaster road infrastructure recovery projects are planned and delivered. In particular, there is awareness that rebuilding such infrastructure need sustainable strategies across economic, environmental and social dimensions. A comprehensive sustainability assessment framework for pre and post disaster situations can minimize negative impact on our communities, economy and environment. This research is underway to develop a comprehensive sustainability element frame work for post disaster management in road infrastructures in Queensland, Australia. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of natural disasters. This research can contribute to strategic planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes in Queensland. Within this context, this paper provides an overview of the qualitative mixed-method research approach involving literature reviews and case studies to explore and evaluate a number of sustainability elements with a view to develop operational strategies for disaster recovery road projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Presently organisations engage in what is termed as Global Business Transformation Projects [GBTPs], for consolidating, innovating, transforming and restructuring their processes and business strategies while undergoing fundamental change. Culture plays an important role in global business transformation projects as these involve people of different cultural backgrounds and span across countries, industries and disciplinary boundaries. Nevertheless, there is scant empirical research on how culture is conceptualised beyond national and organisational cultures but also on how culture is to be taken into account and dealt with within global business transformation projects. This research is situated in a business context and discovers a theory that aids in describing and dealing with culture. It draws on the lived experiences of thirty-two senior management practitioners, reporting on more than sixty-one global business transformation projects in which they were actively involved. The research method used is a qualitative and interpretive one and applies a grounded theory approach, with rich data generated through interviews. In addition, vignettes were developed to illustrate the derived theoretical models. The findings from this study contribute to knowledge in multiple ways. First, it provides a holistic account of global business transformation projects that describe the construct of culture by the elements of culture types, cultural differences and cultural diversity. A typology of culture types has been developed which enlarges the view of culture beyond national and organisational culture including an industry culture, professional service firm culture and 'theme' culture. The amalgamation of the culture types instantiated in a global business transformation project compromises its project culture. Second, the empirically grounded process for managing culture in global business transformation projects integrates the stages of recognition, understanding and management as well as the enablement providing a roadmap for dealing with culture in global business transformation projects. Third, this study identified contextual variables to global business transformation projects, which provide the means of describing the environment global business transformation projects are situated, influence the construct of culture and inform the process for managing culture. Fourth, the contribution to the research method is the positioning of interview research as a strategy for data generation and the detailed documentation applying grounded theory to discover theory.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this paper is examine how firms renew their organisational capabilities based on micro organisational processes. Organisational capability development literature points to firms’ failure in capability renewal process. To overcome this inefficiency, it is proposed to integrate dynamic capability and ambidexterity perspectives by studying knowledge integration within product innovation. In this relation, applying micro perspective in studying technology diffusion within Iranian Auto industry revealed micro co-evolutionary relationships between knowledge integration within product innovation and capability development. Furthermore, based on near decomposability principals, the analysis suggested relationships among modularity of product architecture, modularity of organisational modularity and modularity of industry architecture in downstream and upstream value chain. Based on these micro-macro co evolutionary effects, capability development process underlying successful corporate entrepreneurship may be verified.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1999, power electronics laboratory practicals were isolated two-hour sessions with only nominal assessment. Students were unmotivated, and didn’t prepare for or subsequently review these sessions. The pracs were rushed, and students’ actions task oriented. Learning was shallow at best. In 2000, the practical component was changed to two projects, each spanning four weeks. The projects were larger, linked, real world problems, tackled by groups of three students. Assessment was via individual workbooks kept during the project, a group demonstration of the working project by all members, and a subsequent written report. These projects were highly successful in motivating the students, and achieved the transfer of the theory presented in lectures into personal practical understanding of that material. These outcomes were judged by observations of the class, project and exam marks, and responses to a questionnaire given at the conclusion of the semester.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The market of building retrofits is increasingly more intensified as existing buildings are aging. The building retrofit projects involve existing buildings which impose constraints on stakeholders throughout the project process. They are also risky, complex, less predictable and difficult to be well planned with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors, but they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. This paper first discusses the requirements of waste management in building retrofit projects considering specific project characteristics and work natures, and highlights the importance of involving SMEs in waste planning and management through an appropriate way. By utilizing semi-structured interviews, this research develops a process model for SMEs to be applied in waste management. A collaboration scenario is also developed for collaborative waste planning and management by SMEs as subcontractors and large companies as main contractors. Findings from the paper will promote coordination of project delivery and waste management in building retrofit projects, and improve the involvement and performance of SMEs in dealing with waste problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose - Cultural issues in the construction industry have attracted growing attention from both practitioners and academia. However, there are few studies on culture issues at the project level. The influence of project culture has not traditionally been on the research radar. This research aims to investigate the impacts of project culture on the performance of construction projects. Design/methodology/approach - A case study approach, utilising questionnaire surveys, in-depth interviews and review of project documents, was employed to investigate project culture and its associated impacts in two major hospital projects. Findings - The results indicated that project culture played an important role in achieving harmonious relationships between project participants and better project outcomes in terms of schedule, functionality, satisfaction with the process, satisfaction with the relationships, environmental issues addressed commercial success, further business opportunities and overall performance. Case 1 outperformed Case 2 in these performance indicators. Similarly, it became clear that the project’s culture should be developed from the outset and sustained during the project period. Furthermore, it was also highlighted that the project culture should be translated to all levels of the supply chain i.e. sub-contractors and suppliers. Practical implications – The findings enabled the client to understand the role of project culture and actively commit towards the development and maintenance of the project culture from very early on. It also helps project teams to understand how to deal with cultural issues at the project level. Originality/value- This study is one of limited empirical studies that offer in-depth insights of how project culture affects the performance of construction projects. It is also the first study of hospital projects on the research topic.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With unpredictable workloads and a need for a multitude of specialized skills, many main contractors rely heavily on subcontracting to reduce their risks (Bresnen et al., 1985; Beardsworth et al., 1988). This is especially the case In Hong Kong, where the average direct labour content accounts for only around 1% of the total contract sum (Lai, 1987). Extensive usage of subcontracting is also reported in many other countries, including the UK (Gray and Flanagan, 1989) and Japan (Bennett et al., 1987). In addition, and depending upon the scale and complexity of works, it is not uncommon for subcontractors to further sublet their works to lower tier(s) subcontractors. Richter and Mitchell (1982) argued that main contractors can obtain a higher profit margin by reducing their performance costs by subcontracting work to those who have the necessary resources to perform the work more efficiently and economically. Subcontracting is also used strategically to allow firms to employ a minimum work force under fluctuating demand (Usdiken and Sözen, 1985). Through subcontracting, the risks of main contractors are also reduced, as errors in estimating or additional costs caused by delays or extra labour requirements can be absorbed by the subcontractors involved (Woon and Ofori, 2000). Despite these benefits, the quality of work can suffer when incapable or inexperienced subcontractors are employed. Additional problems also exist in the form of bid shopping, unclear accountability, and high fragmentation (Palaneeswaran et al., 2002). A recent CIB TG 23 International Conference, October 2003, Hong Kong report produced by the Hong Kong Construction Industry Review Committee (CIRC) points to development of a framework to help distinguish between capable and incapable subcontractors (Tang, 2001). This paper describes research aims at identifying and prioritising criteria for use in such a framework.