993 resultados para Vehicle maintenance.
Resumo:
BACKGROUND: Highway maintenance workers are constantly and simultaneously exposed to traffic-related particle and noise emissions, and both have been linked to increased cardiovascular morbidity and mortality in population-based epidemiology studies. OBJECTIVES: We aimed to investigate short-term health effects related to particle and noise exposure. METHODS: We monitored 18 maintenance workers, during as many as five 24-hour periods from a total of 50 observation days. We measured their exposure to fine particulate matter (PM2.5), ultrafine particles, noise, and the cardiopulmonary health endpoints: blood pressure, pro-inflammatory and pro-thrombotic markers in the blood, lung function and fractional exhaled nitric oxide (FeNO) measured approximately 15 hours post-work. Heart rate variability was assessed during a sleep period approximately 10 hours post-work. RESULTS: PM2.5 exposure was significantly associated with C-reactive protein and serum amyloid A, and negatively associated with tumor necrosis factor α. None of the particle metrics were significantly associated with von Willebrand factor or tissue factor expression. PM2.5 and work noise were associated with markers of increased heart rate variability, and with increased HF and LF power. Systolic and diastolic blood pressure on the following morning were significantly associated with noise exposure after work, and non-significantly associated with PM2.5. We observed no significant associations between any of the exposures and lung function or FeNO. CONCLUSIONS: Our findings suggest that exposure to particles and noise during highway maintenance work might pose a cardiovascular health risk. Actions to reduce these exposures could lead to better health for this population of workers.
Resumo:
The cost of a road construction over its service life is a function of the design, quality of construction, maintenance strategies and maintenance operations. Unfortunately, designers often neglect a very important aspect which is the possibility to perform future maintenance activities. The focus is mainly on other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This licentiate thesis is a part of a Ph.D. project entitled “Road Design for lower maintenance costs” that aims to examine how the life-cycle costs can be optimized by selection of appropriate geometrical designs for the roads and their components. The result is expected to give a basis for a new method used in the road planning and design process using life-cycle cost analysis with particular emphasis on road maintenance. The project started with a review of literature with the intention to study conditions causing increased needs for road maintenance, the efforts made by the road authorities to satisfy those needs and the improvement potential by consideration of maintenance aspects during planning and design. An investigation was carried out to identify the problems which obstruct due consideration of maintenance aspects during the road planning and design process. This investigation focused mainly on the road planning and design process at the Swedish Road Administration. However, the road planning and design process in Denmark, Finland and Norway were also roughly evaluated to gain a broader knowledge about the research subject. The investigation was carried out in two phases: data collection and data analysis. Data was collected by semi-structured interviews with expert actors involved in planning, design and maintenance and by a review of design-related documents. Data analyses were carried out using a method called “Change Analysis”. This investigation revealed a complex combination of problems which result in inadequate consideration of maintenance aspects. Several urgent needs for changes to eliminate these problems were identified. Another study was carried out to develop a model for calculation of the repair costs for damages of different road barrier types and to analyse how factors such as road type, speed limits, barrier types, barrier placement, type of road section, alignment and seasonal effects affect the barrier damages and the associated repair costs. This study was carried out using a method called the “Case Study Research Method”. Data was collected from 1087 barrier repairs in two regional offices of the Swedish Road Administration, the Central Region and the Western Region. A table was established for both regions containing the repair cost per vehicle kilometre for different combinations of barrier types, road types and speed limits. This table can be used by the designers in the calculation of the life-cycle costs for different road barrier types.
Resumo:
The cost of a road construction over its service life is a function of design, quality of construction as well as maintenance strategies and operations. An optimal life-cycle cost for a road requires evaluations of the above mentioned components. Unfortunately, road designers often neglect a very important aspect, namely, the possibility to perform future maintenance activities. Focus is mainly directed towards other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This doctoral thesis presents the results of a research project aimed to increase consideration of road maintenance aspects in the planning and design process. The following subgoals were established: Identify the obstacles that prevent adequate consideration of future maintenance during the road planning and design process; and Examine optimisation of life-cycle costs as an approach towards increased efficiency during the road planning and design process. The research project started with a literature review aimed at evaluating the extent to which maintenance aspects are considered during road planning and design as an improvement potential for maintenance efficiency. Efforts made by road authorities to increase efficiency, especially maintenance efficiency, were evaluated. The results indicated that all the evaluated efforts had one thing in common, namely ignorance of the interrelationship between geometrical road design and maintenance as an effective tool to increase maintenance efficiency. Focus has mainly been on improving operating practises and maintenance procedures. This fact might also explain why some efforts to increase maintenance efficiency have been less successful. An investigation was conducted to identify the problems and difficulties, which obstruct due consideration of maintainability during the road planning and design process. A method called “Change Analysis” was used to analyse data collected during interviews with experts in road design and maintenance. The study indicated a complex combination of problems which result in inadequate consideration of maintenance aspects when planning and designing roads. The identified problems were classified into six categories: insufficient consulting, insufficient knowledge, regulations and specifications without consideration of maintenance aspects, insufficient planning and design activities, inadequate organisation and demands from other authorities. Several urgent needs for changes to eliminate these problems were identified. One of the problems identified in the above mentioned study as an obstacle for due consideration of maintenance aspects during road design was the absence of a model for calculating life-cycle costs for roads. Because of this lack of knowledge, the research project focused on implementing a new approach for calculating and analysing life-cycle costs for roads with emphasis on the relationship between road design and road maintainability. Road barriers were chosen as an example. The ambition is to develop this approach to cover other road components at a later stage. A study was conducted to quantify repair rates for barriers and associated repair costs as one of the major maintenance costs for road barriers. A method called “Case Study Research Method” was used to analyse the effect of several factors on barrier repairs costs, such as barrier type, road type, posted speed and seasonal effect. The analyses were based on documented data associated with 1625 repairs conducted in four different geographical regions in Sweden during 2006. A model for calculation of average repair costs per vehicle kilometres was created. Significant differences in the barrier repair costs were found between the studied barrier types. In another study, the injuries associated with road barrier collisions and the corresponding influencing factors were analysed. The analyses in this study were based on documented data from actual barrier collisions between 2005 and 2008 in Sweden. The result was used to calculate the cost for injuries associated with barrier collisions as a part of the socio-economic cost for road barriers. The results showed significant differences in the number of injuries associated with collisions with different barrier types. To calculate and analyse life-cycle costs for road barriers a new approach was developed based on a method called “Activity-based Life-cycle Costing”. By modelling uncertainties, the presented approach gives a possibility to identify and analyse factors crucial for optimising life-cycle costs. The study showed a great potential to increase road maintenance efficiency through road design. It also showed that road components with low investment costs might not be the best choice when including maintenance and socio-economic aspects. The difficulties and problems faced during the collection of data for calculating life-cycle costs for road barriers indicated a great need for improving current data collecting and archiving procedures. The research focused on Swedish road planning and design. However, the conclusions can be applied to other Nordic countries, where weather conditions and road design practices are similar. The general methodological approaches used in this research project may be applied also to other studies.
Resumo:
Solar-powered vehicle activated signs (VAS) are speed warning signs powered by batteries that are recharged by solar panels. These signs are more desirable than other active warning signs due to the low cost of installation and the minimal maintenance requirements. However, one problem that can affect a solar-powered VAS is the limited power capacity available to keep the sign operational. In order to be able to operate the sign more efficiently, it is proposed that the sign be appropriately triggered by taking into account the prevalent conditions. Triggering the sign depends on many factors such as the prevailing speed limit, road geometry, traffic behaviour, the weather and the number of hours of daylight. The main goal of this paper is therefore to develop an intelligent algorithm that would help optimize the trigger point to achieve the best compromise between speed reduction and power consumption. Data have been systematically collected whereby vehicle speed data were gathered whilst varying the value of the trigger speed threshold. A two stage algorithm is then utilized to extract the trigger speed value. Initially the algorithm employs a Self-Organising Map (SOM), to effectively visualize and explore the properties of the data that is then clustered in the second stage using K-means clustering method. Preliminary results achieved in the study indicate that using a SOM in conjunction with K-means method is found to perform well as opposed to direct clustering of the data by K-means alone. Using a SOM in the current case helped the algorithm determine the number of clusters in the data set, which is a frequent problem in data clustering.
Resumo:
The present and subsequent editions of the Bulletin will deal with the issue of road maintenance, its close connection with transport costs and its impact upon the international competitiveness of the countries of Latin America and the Caribbean. When roads are in poor condition, vehicle operating costs increase by 30 to 50% or even more. Autonomous, adequate and regular funding contributes to effective road maintenance and, consequently, to reducing vehicle operating costs.
Resumo:
Administration of gonadotropins or testosterone (T) will maintain qualitatively normal spermatogenesis and fertility in hypophysectomized (APX) rats. However, quantitative maintenance of the spermatogenic process in APX rats treated with T alone or in combination with follicle stimulating hormone (FSH) has not been demonstrated. Studies reported here were conducted to determine whether it would be possible to increase intratesticular testosterone (ITT) levels in APX rats to those found in normal animals by administration of appropriate amounts of testosterone propionate (TP) and if under these conditions spermatogenesis can be maintained quantitatively. Quantitative analysis of spermatogenesis was performed on stages VI and VII of the spermatogenic cycle utilizing criteria of Leblond and Clermont (1952) all cell types were enumerated. In a series of experiments designed to investigate the effects of T on spermatogenesis, TP was administered to 60 day old APX rats twice daily for 30 days in doses ranging from 0.6 to 15 mg/day or from 0.6 to 6.0 mg/day in combination with FSH. The results of this study demonstrate that the efficiency of transformation of type A to type B spermatogonia and the efficacy of the meiotic prophase are related to ITT levels, and that quantitatively normal completion of the reduction division requires normal ITT levels. The ratio of spermatids to spermatocytes in the vehicle-treated APX rats was 1:1.38; in the APX rats treated with 15 mg of TP it was 1:4.0 (the theoretically expected number). This study is probably the first to demonstrate: (1) the pharmacokinetics of TP, (2) the profile and quantity of T-immunoactivity in both serum and testicular tissue of APX and IC rats as well as APX rats treated with TP alone or in combination with FSH, (3) the direct correlation of serum T and ITT levels in treated APX rats (r = 0.9, p < 0.001) as well as in the IC rats (r = 0.9, p < 0.001), (4) the significant increase in the number of Type B spermatogonia, preleptotene and pachytene spermatocytes and round spermatids in TP-treated APX rats, (5) the correlation of the number of round spermatids formed in IC rats to ITT levels (r = 0.9, p < 0.001), and (6) the correlation of the quantitative maintenance of spermatogenesis with ITT levels (r = 0.7, p < 0.001) in the testes of TP-treated APX rats. These results provide direct experimental evidence for the key role of T in the spermatogenic process. ^
Resumo:
The implementation of a charging policy for heavy goods vehicles in European Union (EU) member countries has been imposed to reflect costs of construction and maintenance of infrastructure as well as externalities such as congestion, accidents and environmental impact. In this context, EU countries approved the Eurovignette directive (1999/62/EC) and its amending directive (2006 /38/EC) which established a legal framework to regulate the system of tolls. Even if that regulation seek s to increase the efficien cy of freight, it will trigger direct and indirect effects on Spain’s regional economies by increasing transport costs. This paper presents the development of a multiregional Input-Output methodology (MRIO) with elastic trade coefficients to predict in terregional trade, using transport attributes integrated in multinomial logit models. This method is highly useful to carry out an ex-ante evaluation of transport policies because it involves road freight transport cost sensitivity, and determine regional distributive and substitution economic effect s of countries like Spain, characterized by socio-demographic and economic attributes, differentiated region by region. It will thus be possible to determine cost-effective strategies, given different policy scenarios. MRIO mode l would then be used to determine the impact on the employment rate of imposing a charge in the Madrid-Sevilla corridor in Spain. This methodology is important for measuring the impact on the employment rate since it is one of the main macroeconomic indicators of Spain’s regional and national economic situation. A previous research developed (DESTINO) using a MRIO method estimated employment impacts of road pricing policy across Spanish regions considering a fuel tax charge (€/liter) in the entire shortest cost path network for freight transport. Actually, it found that the variation in employment is expected to be substantial for some regions, and negligible for others. For example, in this Spanish case study of regional employment has showed reductions between 16.1% (Rioja) and 1.4% (Madrid region). This variation range seems to be related to either the intensity of freight transport in each region or dependency of regions to transport intensive economic sect ors. In fact, regions with freight transport intensive sectors will lose more jobs while regions with a predominantly service economy undergo a fairly insignificant loss of employment. This paper is focused on evaluating a freight transport vehicle-kilometer charge (€/km) in a non-tolled motorway corridor (A-4) between Madrid-Sevilla (517 Km.). The consequences of the road pricing policy implementation show s that the employment reductions are not as high as the diminution stated in the previous research because this corridor does not affect the whole freight transport system of Spain.
Resumo:
Texas Department of Transportation, Research and Technology Transfer Office, Austin
Resumo:
Federal Highway Administration, Washington, D.C.
Resumo:
Federal Highway Administration, Structures and Applied Mechanics Division, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
Federal Transit Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
Mode of access: Internet.