937 resultados para Transmission network expansion


Relevância:

40.00% 40.00%

Publicador:

Resumo:

In developing countries, a high rate of growth in the demand for electric energy is felt, and so the addition of new generating units becomes inevitable. In deregulated power systems, private generating stations are encouraged to add new generations. Some of the factors considered while placing a new generating unit are: availability of esources, ease of transmitting power, distance from the load centre, etc. Finding the most appropriate locations for generation expansion can be done by running repeated power flows and carrying system studies like analyzing the voltage profile, voltage stability, loss analysis, etc. In this paper a new methodology is proposed which will mainly consider the existing network topology. A concept of T-index is introduced in this paper, which considers the electrical distances between generator and load nodes. This index is used for ranking the most significant new generation expansion locations and also indicates the amount of permissible generations that can be installed at these new locations. This concept facilitates for the medium and long term planning of power generation expansions within the available transmission corridors. Studies carried out on an EHV equivalent 10-bus system and IEEE 30 bus systems are presented for illustration purposes.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The analysis of electromagnetic transients arising in EHV/UHV power networks gives necessary information about the possible stresses on the different network components, which will determine their proper design, limits of operation as well as their pertinent protection strategies. This paper describes the transient analysis of 765 kV EHV transmission system which is a typical expansion in Indian power grid system. Considering various conditions, switching transient and fault transient studies are carried out. A FORTRAN version of EMTP is developed, to study a practical example, then a comparison with the results available in the literature is made.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Most tissues develop from stem cells and precursors that undergo differentiation as their proliferative potential decreases. Mature differentiated cells rarely proliferate and are replaced at the end of their life by new cells derived from precursors. Langerhans cells (LCs) of the epidermis, although of myeloid origin, were shown to renew in tissues independently from the bone marrow, suggesting the existence of a dermal or epidermal progenitor. We investigated the mechanisms involved in LC development and homeostasis. We observed that a single wave of LC precursors was recruited in the epidermis of mice around embryonic day 18 and acquired a dendritic morphology, major histocompatibility complex II, CD11c, and langerin expression immediately after birth. Langerin+ cells then undergo a massive burst of proliferation between postnatal day 2 (P2) and P7, expanding their numbers by 10–20-fold. After the first week of life, we observed low-level proliferation of langerin+ cells within the epidermis. However, in a mouse model of atopic dermatitis (AD), a keratinocyte signal triggered increased epidermal LC proliferation. Similar findings were observed in epidermis from human patients with AD. Therefore, proliferation of differentiated resident cells represents an alternative pathway for development in the newborn, homeostasis, and expansion in adults of selected myeloid cell populations such as LCs. This mechanism may be relevant in locations where leukocyte trafficking is limited.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper, the performance of the network coded amplify-forward cooperative protocol is studied. The use of network coding can suppress the bandwidth resource consumed by relay transmission, and hence increase the spectral efficiency of cooperative diversity. A distributed strategy of relay selection is applied to the cooperative scheme, which can reduce system overhead and also facilitate the development of the explicit expressions of information metrics, such as outage probability and ergodic capacity. Both analytical and numerical results demonstrate that the proposed protocol can achieve large ergodic capacity and full diversity gain simultaneously.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Birds are vulnerable to collisions with human-made fixed structures. Despite ongoing development and increases in infrastructure, we have few estimates of the magnitude of collision mortality. We reviewed the existing literature on avian mortality associated with transmission lines and derived an initial estimate for Canada. Estimating mortality from collisions with power lines is challenging due to the lack of studies, especially from sites within Canada, and due to uncertainty about the magnitude of detection biases. Detection of bird collisions with transmission lines varies due to habitat type, species size, and scavenging rates. In addition, birds can be crippled by the impact and subsequently die, although crippling rates are poorly known and rarely incorporated into estimates. We used existing data to derive a range of estimates of avian mortality associated with collisions with transmission lines in Canada by incorporating detection, scavenging, and crippling biases. There are 231,966 km of transmission lines across Canada, mostly in the boreal forest. Mortality estimates ranged from 1 million to 229.5 million birds per year, depending on the bias corrections applied. We consider our most realistic estimate, taking into account variation in risk across Canada, to range from 2.5 million to 25.6 million birds killed per year. Data from multiple studies across Canada and the northern U.S. indicate that the most vulnerable bird groups are (1) waterfowl, (2) grebes, (3) shorebirds, and (4) cranes, which is consistent with other studies. Populations of several groups that are vulnerable to collisions are increasing across Canada (e.g., waterfowl, raptors), which suggests that collision mortality, at current levels, is not limiting population growth. However, there may be impacts on other declining species, such as shorebirds and some species at risk, including Alberta’s Trumpeter Swans (Cygnus buccinator) and western Canada’s endangered Whooping Cranes (Grus americana). Collisions may be more common during migration, which underscores the need to understand impacts across the annual cycle. We emphasize that these estimates are preliminary, especially considering the absence of Canadian studies.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Economic dispatch (ED) problems have recently been solved by artificial neural network approaches. Systems based on artificial neural networks have high computational rates due to the use of a massive number of simple processing elements and the high degree of connectivity between these elements. The ability of neural networks to realize some complex non-linear function makes them attractive for system optimization. All ED models solved by neural approaches described in the literature fail to represent the transmission system. Therefore, such procedures may calculate dispatch policies, which do not take into account important active power constraints. Another drawback pointed out in the literature is that some of the neural approaches fail to converge efficiently toward feasible equilibrium points. A modified Hopfield approach designed to solve ED problems with transmission system representation is presented in this paper. The transmission system is represented through linear load flow equations and constraints on active power flows. The internal parameters of such modified Hopfield networks are computed using the valid-subspace technique. These parameters guarantee the network convergence to feasible equilibrium points, which represent the solution for the ED problem. Simulation results and a sensitivity analysis involving IEEE 14-bus test system are presented to illustrate efficiency of the proposed approach. (C) 2004 Elsevier Ltd. All rights reserved.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this letter, a genetic algorithm (GA) is applied to solve - the static and multistage transmission expansion planning (TEP) problem. The characteristics of the proposed GA to solve the TEP problem are presented. Results using some known systems show that the proposed GA solves a smaller number of linear programming problems in order to find the optimal solutions and obtains a better solution for the multistage TEP problem.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This work presents a branch-and-bound algorithm to solve the multi-stage transmission expansion planning problem. The well known transportation model is employed, nevertheless the algorithm can be extended to hybrid models or to more complex ones such as the DC model. Tests with a realistic power system were carried out in order to show the performance of the algorithm for the expansion plan executed for different time frames. © 2005 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper the genetic algorithm of Chu and Beasley (GACB) is applied to solve the static and multistage transmission expansion planning problem. The characteristics of the GACB, and some modifications that were done, to efficiently solve the problem described above are also presented. Results using some known systems show that the GACB is very efficient. To validate the GACB, we compare the results achieved using it with the results using other meta-heuristics like tabu-search, simulated annealing, extended genetic algorithm and hibrid algorithms. © 2006 IEEE.