334 resultados para Tohoku Tsunami


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Publication suspended March 1945-Sept.1947

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Issues for 1920-26 have title also in Japanese: Tohoku jikkenigaku

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Post-disaster recovery of Micro, Small and Medium-Scale Enterprises (SMEs) remains an issue of interest for policy and practice given the wide scale occurrences of natural disasters around the globe and their significant impacts on local economies and SMEs. Asian Tsunami of December 2004 affected many SMEs in southern Sri Lanka. The study was developed to identify the main issues encountered by the Tsunami affected SMEs in Southern Sri Lanka in the process of their post-tsunami recovery. The study: a) identifies tsunami damage and loss in micro and SMEs in the Galle district; b) ascertains the type of benefits received from various parties by the affected micro and SMEs; c) evaluates the problems and difficulties faced by the beneficiary organizations in the benefit distribution process; and d) recommends strategies and policies for the tsunami-affected micro and SMEs for them to become self-sustaining within a reasonable time frame. Fifty randomly selected tsunami-affected micro and SMEs were surveyed for this study. Interviews were conducted in person with the business owners in order to identify the damages, recovery, rehabilitation, re-establishment and difficulties faced in the benefit distribution process. The analysis identifies that the benefits were given the wrong priorities and that they were not sufficient for the recovery process. In addition, the many governance-related problems that arose while distributing benefits are discussed. Overall, the business recovery rate was approximately 65%, and approximately 88% of business organizations were sole proprietorships. Therefore, the policies of the tsunami relief agencies should adequately address the needs of sole proprietorship business requirements. Consideration should also be given to strengthen the capacity and skills of the entrepreneurs by improving operational, technological, management and marketing skills and capabilities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this thesis, research for tsunami remote sensing using the Global Navigation Satellite System-Reflectometry (GNSS-R) delay-Doppler maps (DDMs) is presented. Firstly, a process for simulating GNSS-R DDMs of a tsunami-dominated sea sur- face is described. In this method, the bistatic scattering Zavorotny-Voronovich (Z-V) model, the sea surface mean square slope model of Cox and Munk, and the tsunami- induced wind perturbation model are employed. The feasibility of the Cox and Munk model under a tsunami scenario is examined by comparing the Cox and Munk model- based scattering coefficient with the Jason-1 measurement. A good consistency be- tween these two results is obtained with a correlation coefficient of 0.93. After con- firming the applicability of the Cox and Munk model for a tsunami-dominated sea, this work provides the simulations of the scattering coefficient distribution and the corresponding DDMs of a fixed region of interest before and during the tsunami. Fur- thermore, by subtracting the simulation results that are free of tsunami from those with presence of tsunami, the tsunami-induced variations in scattering coefficients and DDMs can be clearly observed. Secondly, a scheme to detect tsunamis and estimate tsunami parameters from such tsunami-dominant sea surface DDMs is developed. As a first step, a procedure to de- termine tsunami-induced sea surface height anomalies (SSHAs) from DDMs is demon- strated and a tsunami detection precept is proposed. Subsequently, the tsunami parameters (wave amplitude, direction and speed of propagation, wavelength, and the tsunami source location) are estimated based upon the detected tsunami-induced SSHAs. In application, the sea surface scattering coefficients are unambiguously re- trieved by employing the spatial integration approach (SIA) and the dual-antenna technique. Next, the effective wind speed distribution can be restored from the scat- tering coefficients. Assuming all DDMs are of a tsunami-dominated sea surface, the tsunami-induced SSHAs can be derived with the knowledge of background wind speed distribution. In addition, the SSHA distribution resulting from the tsunami-free DDM (which is supposed to be zero) is considered as an error map introduced during the overall retrieving stage and is utilized to mitigate such errors from influencing sub- sequent SSHA results. In particular, a tsunami detection procedure is conducted to judge the SSHAs to be truly tsunami-induced or not through a fitting process, which makes it possible to decrease the false alarm. After this step, tsunami parameter estimation is proceeded based upon the fitted results in the former tsunami detec- tion procedure. Moreover, an additional method is proposed for estimating tsunami propagation velocity and is believed to be more desirable in real-world scenarios. The above-mentioned tsunami-dominated sea surface DDM simulation, tsunami detection precept and parameter estimation have been tested with simulated data based on the 2004 Sumatra-Andaman tsunami event.