220 resultados para Surveyors
Resumo:
With the rapid development in technology over recent years, construction, in common with many areas of industry, has become increasingly complex. It would, therefore, seem to be important to develop and extend the understanding of complexity so that industry in general and in this case the construction industry can work with greater accuracy and efficiency to provide clients with a better service. This paper aims to generate a definition of complexity and a method for its measurement in order to assess its influence upon the accuracy of the quantity surveying profession in UK new build office construction. Quantitative data came from an analysis of twenty projects of varying size and value and qualitative data came from interviews with professional quantity surveyors. The findings highlight the difficulty in defining and measuring project complexity. The correlation between accuracy and complexity was not straightforward, being subjected to many extraneous variables, particularly the impact of project size. Further research is required to develop a better measure of complexity. This is in order to improve the response of quantity surveyors, so that an appropriate level of effort can be applied to individual projects, permitting greater accuracy and enabling better resource planning within the profession.
Resumo:
This paper presents the findings from a study into the current exploitation of computer-supported collaborative working (CSCW) in design for the built environment in the UK. The research is based on responses to a web-based questionnaire. Members of various professions, including civil engineers, architects, building services engineers, and quantity surveyors, were invited to complete the questionnaire. The responses reveal important trends in the breadth and size of project teams at the same time as new pressures are emerging regarding team integration and efficiency. The findings suggest that while CSCW systems may improve project management (e.g., via project documentation) and the exchange of information between team members, it has yet to significantly support those activities that characterize integrated collaborative working between disparate specialists. The authors conclude by combining the findings with a wider discussion of the application of CSCW to design activity-appealing for CSCW to go beyond multidisciplinary working to achieve interdisciplinary working.
Resumo:
Bee pollinators are currently recorded with many different sampling methods. However, the relative performances of these methods have not been systematically evaluated and compared. In response to the strong need to record ongoing shifts in pollinator diversity and abundance, global and regional pollinator initiatives must adopt standardized sampling protocols when developing large-scale and long-term monitoring schemes. We systematically evaluated the performance of six sampling methods (observation plots, pan traps, standardized and variable transect walks, trap nests with reed internodes or paper tubes) that are commonly used across a wide range of geographical regions in Europe and in two habitat types (agricultural and seminatural). We focused on bees since they represent the most important pollinator group worldwide. Several characteristics of the methods were considered in order to evaluate their performance in assessing bee diversity: sample coverage, observed species richness, species richness estimators, collector biases (identified by subunit-based rarefaction curves), species composition of the samples, and the indication of overall bee species richness (estimated from combined total samples). The most efficient method in all geographical regions, in both the agricultural and seminatural habitats, was the pan trap method. It had the highest sample coverage, collected the highest number of species, showed negligible collector bias, detected similar species as the transect methods, and was the best indicator of overall bee species richness. The transect methods were also relatively efficient, but they had a significant collector bias. The observation plots showed poor performance. As trap nests are restricted to cavity-nesting bee species, they had a naturally low sample coverage. However, both trap nest types detected additional species that were not recorded by any of the other methods. For large-scale and long-term monitoring schemes with surveyors with different experience levels, we recommend pan traps as the most efficient, unbiased, and cost-effective method for sampling bee diversity. Trap nests with reed internodes could be used as a complementary sampling method to maximize the numbers of collected species. Transect walks are the principal method for detailed studies focusing on plant-pollinator associations. Moreover, they can be used in monitoring schemes after training the surveyors to standardize their collection skills.
Resumo:
Firms form consortia in order to win contracts. Once a project has been awarded to a consortium each member then concentrates on his or her own contract with the client. Therefore, consortia are marketing devices, which present the impression of teamworking, but the production process is just as fragmented as under conventional procurement methods. In this way, the consortium forms a barrier between the client and the actual construction production process. Firms form consortia, not as a simple development of normal ways of working, but because the circumstances for specific projects make it a necessary vehicle. These circumstances include projects that are too large or too complex to undertake alone or projects that require on-going services which cannot be provided by the individual firms inhouse. It is not a preferred way of working, because participants carry extra risk in the form of liability for the actions of their partners in the consortium. The behaviour of members of consortia is determined by their relative power, based on several factors, including financial commitment and ease of replacement. The level of supply chain visibility to the public sector client and to the industry is reduced by the existence of a consortium because the consortium forms an additional obstacle between the client and the firms undertaking the actual construction work. Supply chain visibility matters to the client who otherwise loses control over the process of construction or service provision, while remaining accountable for cost overruns. To overcome this separation there is a convincing argument in favour of adopting the approach put forward in the Project Partnering Contract 2000 (PPC2000) Agreement. Members of consortia do not necessarily go on to work in the same consortia again because members need to respond flexibly to opportunities as and when they arise. Decision-making processes within consortia tend to be on an ad hoc basis. Construction risk is taken by the contractor and the construction supply chain but the reputational risk is carried by all the firms associated with a consortium. There is a wide variation in the manner that consortia are formed, determined by the individual circumstances of each project; its requirements, size and complexity, and the attitude of individual project leaders. However, there are a number of close working relationships based on generic models of consortia-like arrangements for the purpose of building production, such as the Housing Corporation Guidance Notes and the PPC2000.
Resumo:
This paper provides some preliminary insights into the emergence and development of indigenous general contractors in Ghana. General contracting is the means by which an individual or organisation takes responsibility for supplying all of the materials, labour, equipment and services necessary for the construction of a project. Whereas the development of general contracting in places like the UK is well documented, the evolution of contractors in Ghana is not clearly articulated in the literature. Therefore, the main question in this paper is: How did indigenous contractors evolve in Ghana? To examine and analyze the research question, a literature review on similar developments elsewhere was first carried out. This was followed by discussions and unstructured interviews with experienced construction practitioners in Ghana most of whom were Quantity Surveyors. Most interviewees narrated their knowledge of contractor development in Ghana dating back to around 1945. From the explanations given, it was possible to develop a general understanding of the research question and to make a qualitative interpretation of the respondents’ comments and to draw some conclusions. General contractors emerged rapidly in the Gold Coast (now Ghana) shortly after World War II. Most were Italian master craftsmen in Ghana who were capitalized by the British colonial government to develop infrastructure in the Gold Coast following devastating effects of the war. Some of the indigenous people learned from the Italians and also established construction firms. Thus, general contracting in Ghana has a relatively short history in comparison to countries like Britain where the profession developed rapidly in the early part of the 19th century in response to the industrial revolution. Although they may possess sufficient technical expertise, many indigenous contractors in Ghana today lack the capacity to carry out major projects because of low capitalization and poor organisational structures. The current construction market in Ghana is dominated by foreign contractors. To become major players in the market, indigenous Ghanaian contractors should build strong organisational structures and pursue mergers and joint venturing to boost their financial, technical and managerial capacity.
Resumo:
The state of health and safety on construction sites in Ghana was investigated using first hand observation of fourteen (14) construction project sites in 2009 and 2010. At each site, the construction project, workers and the physical environment of the site were inspected and evaluated against health and safety indicators taken from the literature. The results reveal a poor state of health and safety on Ghanaian construction sites. The primary reasons are a lack of strong institutional framework for governing construction activities and poor enforcement of health and safety policies and procedures. Also, Ghanaian society does not place a high premium on health and safety of construction workers on site. Interviews with workers indicated that injuries and accidents are common on sites. However, compensation for injury is often at the discretion of the contractor although collective bargaining agreements between Labour unions and employers prescribe obligations for the contractor in the event of injury to a worker.
Resumo:
Ten projects constructed in Ghana between 2003 and 2010 are examined and analysed to ascertain the reliability of estimated costs provided for the projects. Cost estimates for five of the projects were calculated by consultants and cost estimates for the five remaining projects were calculated by contractors. Cost estimates prepared by contractors seemed to be closer to actual costs than estimates calculated by consultants. Projects estimated by consultants experienced an average cost overrun of 40% and time overrun of 62% whereas projects priced by contractors experienced an average cost overrun of 6% and time overrun of 41%. It seemed that contractors had a better understanding of the actual construction processes and a clearer expectation of the needs of the client hence an ability to calculate estimates that were closer to reality. Construction clients in Ghana should rely on contractors for more realistic cost estimates as estimates by consultants may be inaccurate. Where consultants are employed, an allowance of up 40% should be added to the estimated costs as a margin for inaccuracy.
Resumo:
A review of current risk pricing practices in the financial, insurance and construction sectors is conducted through a comprehensive literature review. The purpose was to inform a study on risk and price in the tendering processes of contractors: specifically, how contractors take account of risk when they are calculating their bids for construction work. The reference to mainstream literature was in view of construction management research as a field of application rather than a fundamental academic discipline. Analytical models are used for risk pricing in the financial sector. Certain mathematical laws and principles of insurance are used to price risk in the insurance sector. construction contractors and practitioners are described to traditionally price allowances for project risk using mechanisms such as intuition and experience. Project risk analysis models have proliferated in recent years. However, they are rarely used because of problems practitioners face when confronted with them. A discussion of practices across the three sectors shows that the construction industry does not approach risk according to the sophisticated mechanisms of the two other sectors. This is not a poor situation in itself. However, knowledge transfer from finance and insurance can help construction practitioners. But also, formal risk models for contractors should be informed by the commercial exigencies and unique characteristics of the construction sector.
Resumo:
A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.
Resumo:
There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.