State and local governments frequently look to flagship cultural projects to improve the city image and catalyze tourism but, in the process, often overlook their potential to foster local arts development. To better understand this role, the article examines if and how cultural institutions in Los Angeles and San Francisco attract and support arts-related activity. The analysis reveals that cultural flagships have mixed success in generating arts-based development and that their ability may be improved through attention to the local context, facility and institutional characteristics, and the approach of the sponsoring agencies. Such knowledge is useful for planners to enhance their revitalization efforts, particularly as the economic development potential of arts organizations and artists has become more apparent.
Resumo:
This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.
Resumo:
Based on Dunning's dominant international business theory and the unique characteristics of construction, a novel framework is developed and tested to explain multinational contracting into Australia. Beyond contributions to theory, Australian governments now have clear evidence upon which to develop more effective procurement reform towards increasing the attractiveness of public sector major infrastructure projects and competition in this sector.
Resumo:
Construction product innovation can exert a positive influence on project and industry performance. However, guidance is scarce on product innovation diffusion for road infrastructure, in contrast to the large body of literature on the manufacturing industry. A conceptual framework is proposed to understand these processes. Advice is given to managers based on the framework and a large quantitative survey. The framework focuses on contextual characteristics that influence the decision to adopt new-to-industry product innovation, as part of a diffusion process. Case study data are interpreted within the revised framework to test its value and disaggregate the broad obstacles to innovation. A large quantitative survey was then conducted to rank the relative importance of the obstacles constraining the adoption of innovative products on road construction projects. The three most important obstacles were found to be: (1) overemphasis on up-front project costs during tender stage; (2) disagreement over who carries the risk of new product failure; and (3) adversarial contract relations. The results suggest refinements to the conceptual framework to make it a more powerful tool for categorizing and analysing construction innovation obstacles. Results also suggest well-resourced repeat interactions within complementary procurement and regulatory systems will enhance the project teams’ ability to recognize and address innovation obstacles. Further, improved relationships are expected to decrease the need for an overly conservative approach to product approval and prescriptive specifications.
Resumo:
Based on an investigation of 106 projects involving the use of building information modelling (BIM), this paper examines current BIM practices in China, and assesses how various practices alter their effectiveness. The results reveal that in current practice BIM is principally employed as a visualization tool, and how it is implemented is significantly associated with project characteristics. BIM use in the majority of the surveyed projects is seen to have positive outcomes, with the benefits of improved task effectiveness being more substantial than those related to efficiency improvement. The results also provide evidence that project characteristics significantly influence the success of BIM use; however, more substantial contributing factors to BIM effectiveness are the extent of integrated use and client/owner support. While indicating that current BIM practices involve both technological and organizational problems, the findings also provide insights into how the potential for BIM could be better exploited within the industry.
Resumo:
In current practice, urban-rural development has been regarded as one of the key pillars in driving regenerative development that includes economic, social, and environmental balance. In association with rapid urbanization, an important contemporary issue in China is that its rural areas are increasingly lagging behind urban areas in their development and a coordinated provision of public facilities in rural areas is necessary to achieve a better balance. A model is therefore introduced for quantifying the effect of individual infrastructure projects on urban-rural balance (e-UR) by focusing on two attributes, namely, efficiency and equity. The model is demonstrated through a multi-criteria model, developed with data collected from infrastructure projects in Chongqing, with the criteria values for each project being scored by comparing data collected from the project involved with e-UR neutral “benchmark” values derived from a survey of experts in the field. The model helps evaluate the contribution of the projects to improving rural-urban balance and hence enable government decision-makers for the first time to prioritize future projects rigorously in terms of their likely contribution too.
Resumo:
Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.
Resumo:
This research aims to explore and identify political risks on a large infrastructure project in an exaggerated environment to ascertain whether sufficient objective information can be gathered by project managers to utilise risk modelling techniques. During the study, the author proposes a new definition of political risk; performs a detailed project study of the Neelum Jhelum Hydroelectric Project in Pakistan; implements a probabilistic model using the principle of decomposition and Bayes probabilistic theorem and answers the question: was it possible for project managers to obtain all the relevant objective data to implement a probabilistic model?
Resumo:
Although rework is a common phenomenon in the Chinese construction industry and significantly affects project success, the reasons for rework remain largely unknown and most construction companies are unable to manage the issue effectively. To investigate the causes of rework in construction projects, a total of 39 causes were first identified through a comprehensive literature review and semi-structured interviews with 13 experienced construction professionals in China. A questionnaire survey was further conducted to prioritize these causes, in which unclear project process management, poor quality of construction technology, and the use of poor construction materials rank the highest. Finally, a factor analysis revealed 11 major underlying dimensions of these causes, relating to design management, communication management, field management, project scope management, project process management, active rework, project plan changes, subcontractor management, contract management, owner capability, and the external environment. The contribution of this work lies in its examination of the underlying causes of rework perceived by construction professionals in the world’s largest developing country, which is characterized by its unique economic and social systems. In particular, newly identified causes of contract management, active rework, and scope management help expand existing knowledge of the underlying causes of rework for the global construction community.
Resumo:
Formal incentives systems aim to encourage improved performance by offering a reward for the achievement of project-specific goals. Despite argued benefits of incentive systems on project delivery outcomes, there remains debate over how incentive systems can be designed to encourage the formation of strong project relationships within a complex social system such as an infrastructure project. This challenge is compounded by the increasing emphasis in construction management research on the important mediating influence of technical and organisational context on project performance. In light of this challenge, the research presented in this paper focuses on the design of incentive systems in four infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on a motivational theory frame, a cross case analysis is conducted to examine differences and similarities across social and cultural drivers impacting on the effectiveness of the incentive systems in light of infrastructure project context. Despite significant differences in case project characteristics, results indicate the projects’ experience similar social drivers impacting on incentive effectiveness. Significant value across the projects was placed on: varied performance goals and multiple opportunities to across the project team to pursue incentive rewards; fair risk allocation across contract parties; value-driven tender selection; improved design-build integration; and promotion of future work opportunities. However, differences across the contexts were identified. Results suggest future work opportunities were a more powerful social driver in upholding reputation and establishing strong project relationships in the Australian context. On the other hand, the relationship initiatives in the Dutch context seemed to be more broadly embraced resulting in a greater willingness to collaboratively manage project risk. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the social and cultural influences on incentive effectiveness across different geographical and contextual boundaries in future research.
Resumo:
In Australia, collaborative contracts have been increasingly used to govern infrastructure projects. These contracts combine formal and informal mechanisms to manage project delivery. Formal mechanisms (e.g. financial risk sharing) are specified in the contract, while informal mechanisms (e.g. integrated team) are not. The paper reports on a literature review to operationalise the concepts of formal and informal governance, as the literature contains a multiplicity of, often un-testable, definitions. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operatinalise formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Formal governance mechanisms were found to be usefully broken down into four measurable categories: (1) target cost arrangement (2) financial risk and reward sharing regime (3) transparent financials and (4) collaborative multi-party agreement Informal governance mechanisms were found to be usefully broken down into three measurable categories: (1) leadership structure (2) integrated team (3) joint management system We expect these categories to effectively capture the key governance drivers of outcomes on infrastructure projects. These categories will be further refined and broken down into individual governance mechanisms for assessment through a large-scale Australian survey planned for late 2012. These individual mechanisms will feature in the questionnaire that QUT will deliver to AAA in October 2012.