856 resultados para Rationalization of construction


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A regional (Oceania) core collection for taro germplasm has been developed based on phenotypic and molecular characterization. In total, 2199 accessions of taro germplasm have been collected by TaroGen (Taro Genetic Resources: Conservation and Utilisation) from 10 countries in Oceania: Papua New Guinea, Solomon Islands, Vanuatu, New Caledonia, Fiji, Palau, Niue, Tonga, Cook Islands and Samoa. Our objective was to select 10% from each country to contribute to a regional core. The larger collections from Papua New Guinea, Vanuatu and New Caledonia were analysed based on phenotypic characters, and a diverse subset representing 20% of these collections was fingerprinted. A diverse 20% subsample was also taken from the Solomon Islands. All accessions from the other six countries were fingerprinted. In total, 515 accessions were genotyped (23.4% overall) using taro specific simple sequence repeat (SSR) markers. DNA fingerprint data showed that great allelic diversity existed in Papua New Guinea and the Solomon Islands. Interestingly, rare alleles were identified in taros from the Solomon Islands province of Choiseul which were not observed in any of the other collections. Overall, 211 accessions were recommended for inclusion in the final regional core collection based on the phenotypic and molecular characterization.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Numerous techniques have been developed to control cost and time of construction projects. However, there is limited research on issues surrounding the practical usage of these techniques. To address this, a survey was conducted on the top 150 construction companies and 100 construction consultancies in the UK aimed at identifying common project control practices and factors inhibiting effective project control in practice. It found that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Wider scientific community now accept that the threat of climate change as real and thus acknowledge the importance of implementing adaptation measures in a global context. In the UK , the physical effects of climate change are likely to be directly felt in the form of extreme weather events, which are predicted to escalate in number and severity in future under the changing climatic conditions. Construction industry; which consists of supply chains running across various other industries, economies and regions, will also be affected due to these events. Thus, it is important that the construction organisations are well prepared to withstand the effects of extreme weather events not only directly affecting their organisations but also affecting their supply chains which in turn might affect the organisation concerned. Given the fact that more than 99% of construction sector businesses are SMEs, the area can benefit significantly from policy making to improve SME resilience and coping capacity. This paper presents the literature review and synthesis of a doctoral research study undertaken to address the issue of extreme weather resilience of construction sector SMEs and their supply chains. The main contribution of the paper to both academia and practitioners is a synthesis model that conceptualises the factors that enhances resilience of SMEs and their supply chains against extreme weather events. This synthesis model forms the basis of a decision making framework that will enable SMEs to both reduce their vulnerability and enhance their coping capacity against extreme weather. The value of this paper is further extended by the overall research design that is set forth as the way forward.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Projections into future increasingly suggest that the intensity and frequency of Extreme Weather Events (EWEs) will increase in the future. This has demanded the business organisations as well to be prepared to face the increasing risk of EWEs, in order to ensure their business continuity. However, current evidence base suggests that businesses, especially SMEs, are not adequately prepared to face the threat of such events. Ability to adequately prepare them has been hindered by the lack of in depth studies addressing this issue. The paper presents a doctoral study designed to investigate the resilience of SMEs operating in the construction sector; which is said to be a highly vulnerable sector for the impacts of EWEs, and their supply chains to EWEs. A conceptual framework developed to investigate this issue is presented and explained. It is argued that the resilience of construction SMEs and their supply chains against EWEs can be improved by a combination of reducing their vulnerability, enhancing coping capacity and implementing coping mechanisms. Importance of undertaking a broader view to include the whole supply chain in making business decisions with regard to EWEs by SMEs is also highlighted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Weather extremes have created a considerable impact on Small and Medium-sized Enterprises (SMEs) in the UK during the recent years, especially on SMEs in the construction sector. Evidence in relation to the recent weather extremes have demonstrated that SMEs are some of the worst impacted by the Extreme Weather Events (EWEs) and have confirmed them as a highly vulnerable section of the UK economy to the impact of extreme weather. This is of particular importance to the construction industry, as an overarching majority of construction companies are SMEs who account for the majority of employment and income generation within the industry. Whilst construction has been perceived as a sector significantly vulnerable to the impacts of EWEs, there is scant evidence of how construction SMEs respond to such events and cope with their impact. Based on the evidence emerged from case studies of construction SMEs, current coping strategies of construction SMEs were identified. Some of the strategies identified were focused at organisational level whereas others were focused at project level. Further, some of the strategies were general risk management / business continuity strategies whereas others have been specifically developed to address the risk of EWEs. Accordingly, coping strategies can be broadly categorised based on their focus; i.e. those focused at project or organisational level, and based on the risks that they seek to address; i.e. business / continuity risks in general or EWE risk specifically. By overlapping these two aspects; their focus and risks that they seek to address, four categories of coping strategies can be devised. There are; general risk management strategies focused at business level, general risk management strategies focused at project level, EWE specific strategies focused at business level, and EWE specific strategies focused at project level. It is proposed that for a construction SME to effectively cope with the impact of EWEs and develop their resilience against EWEs a rich mix of these coping strategies are required to suite the particular requirements of the business.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The conceptual foundations of the models and procedures for prediction of the avalanche-dangerous situations initiation are considered. The interpretation model for analysis of the avalanche-dangerous situations initiation based on the definition of probabilities of correspondence of studied parameters to the probabilistic distributions of avalanche-dangerous or avalanche non-dangerous situations is offered. The possibility to apply such a model to the real data is considered. The main approaches to the use of multiple representations for the avalanche dangerous situations initiation analysis are generalized.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The problem of a finding of ranging of the objects nearest to the cyclic relation set by the expert between objects is considered. Formalization of the problem arising at it is resulted. The algorithm based on a method of the consecutive analysis of variants and the analysis of conditions of acyclicity is offered.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose Small and Medium-sized Enterprises (SMEs), which form a significant portion in many economies, are some of the most vulnerable to the impact of Extreme Weather Events (EWEs). This is of particular importance to the construction industry, as an overarching majority of construction companies are SMEs who account for the majority of employment and income generation within the industry. In the UK, previous research has identified construction SMEs as some of the worst affected by EWEs. Design/methodology/approach Given the recent occurrences of EWEs and predictions suggesting increases in both the intensity and frequency of EWEs in the future, improving the resilience of construction SMEs is vital for achieving a resilient construction industry. A conceptual framework is first developed which is then populated and expanded based on empirical evidence. Positioned within a pragmatic research philosophy, case study research strategy was adopted as the overall research strategy in undertaking this investigation. Findings Based on the findings of two in-depth case studies of construction SMEs, a framework was developed to represent EWE resilience of construction SMEs, where resilience was seen as a collective effect of vulnerability, coping strategies and coping capacities of SMEs, characteristics of the EWE and the wider economic climate. Originality/value The paper provides an original contribution towards the overarching agenda of the resilience of SMEs, and policy making in the area of EWE risk management by presenting a novel conceptual framework depicting the resilience of medium-sized construction companies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Environmentally conscious construction has received a significant amount of research attention during the last decades. Even though construction literature is rich in studies that emphasize the importance of environmental impact during the construction phase, most of the previous studies failed to combine environmental analysis with other project performance criteria in construction. This is mainly because most of the studies have overlooked the multi-objective nature of construction projects. In order to achieve environmentally conscious construction, multi-objectives and their relationships need to be successfully analyzed in the complex construction environment. The complex construction system is composed of changing project conditions that have an impact on the relationship between time, cost and environmental impact (TCEI) of construction operations. Yet, this impact is still unknown by construction professionals. Studying this impact is vital to fulfill multiple project objectives and achieve environmentally conscious construction. This research proposes an analytical framework to analyze the impact of changing project conditions on the relationship of TCEI. This study includes green house gas (GHG) emissions as an environmental impact category. The methodology utilizes multi-agent systems, multi-objective optimization, analytical network process, and system dynamics tools to study the relationships of TCEI and support decision-making under the influence of project conditions. Life cycle assessment (LCA) is applied to the evaluation of environmental impact in terms of GHG. The mixed method approach allowed for the collection and analysis of qualitative and quantitative data. Structured interviews of professionals in the highway construction field were conducted to gain their perspectives in decision-making under the influence of certain project conditions, while the quantitative data were collected from the Florida Department of Transportation (FDOT) for highway resurfacing projects. The data collected were used to test the framework. The framework yielded statistically significant results in simulating project conditions and optimizing TCEI. The results showed that the change in project conditions had a significant impact on the TCEI optimal solutions. The correlation between TCEI suggested that they affected each other positively, but in different strengths. The findings of the study will assist contractors to visualize the impact of their decision on the relationship of TCEI.