950 resultados para Railway Track
Resumo:
This paper introduces an event-based traffic model for railway systems adopting fixed-block signalling schemes. In this model, the events of trains' arrival at and departure from signalling blocks constitute the states of the traffic flow. A state transition is equivalent to the progress of the trains by one signalling block and it is realised by referring to past and present states, as well as a number of pre-calculated look-up tables of run-times in the signalling block under various signalling conditions. Simulation results are compared with those from a time-based multi-train simulator to study the improvement of processing time and accuracy.
Resumo:
Railways in Hong Kong have been one of the few successful stories in the major metropolitan cities around the world, not only for their profit-making operation but also the efficiency in dealing with the astonishingly high traffic demands every day. While railway operations require a chain of delicate systems working in harmony all the time, there are numerous engineering problems arising and jeopardising the quality of services. Research in various railway engineering problems is therefore a must to tackle these problems. This paper highlights the railway research works in Hong Kong and discusses their relevance to Mainland China.
Resumo:
Railways in Hong Kong have been one of the few successful stories in the major metropolitan cities around the world, not only for their profit-making operation but also the efficiency in dealing with the astonishingly high traffic demands every day. While railway operations require a chain of delicate systems working in harmony all the time, there are numerous engineering problems arising and jeopardising the quality of services. Research in various railway engineering problems is therefore a must to tackle these problems. This paper highlights the railway research works in Hong Kong and discusses their relevance to Mainland China.
Resumo:
The Streaming SIMD extension (SSE) is a special feature that is available in the Intel Pentium III and P4 classes of microprocessors. As its name implies, SSE enables the execution of SIMD (Single Instruction Multiple Data) operations upon 32-bit floating-point data therefore, performance of floating-point algorithms can be improved. In electrified railway system simulation, the computation involves the solving of a huge set of simultaneous linear equations, which represent the electrical characteristic of the railway network at a particular time-step and a fast solution for the equations is desirable in order to simulate the system in real-time. In this paper, we present how SSE is being applied to the railway network simulation.
Resumo:
From the business viewpoint, the railway timetable is a list of the products presented by the railway transportation operators to the customers, specifying the schedules of all the train services on a railway line or network. In order to evaluate the quality of the train service schedules, a number of indices are proposed in this paper. These indices primarily take the passengers’ needs, such as waiting time, transfer time and transport capacity into consideration. Delay rate is usually used in post-evaluation. In this study, we propose to give an evaluation on the probability that the scheduled train services are likely to be delayed and the recovery ability of the timetable after delay has occurred. The evaluation identifies the possible problems in the services, such as excessive waiting time, non-seamless transfer, and high possibility of delay. This paper also discusses the improvement of these problems through certain adjustments on the timetable. The indices for evaluation and the adjustment method on timetable are then applied to a case study on the Hu-Ning-Hang railway in China, followed by the discussions of the merits of the proposed indices for timetable evaluation and possible improvement.
Resumo:
Due to an ever increasing demand for more frequent and higher volume of train service, the physical conditions of tracks in modem railways are deteriorating more quickly when compared to tracks built decades ago. There are incidences in both the UK and Hong Kong indicating there are needs for a more stringent checks on the rail conditions using suitable and effective non-invasive and nondestructive condition monitoring system.
Resumo:
Path planning and trajectory design for autonomous underwater vehicles (AUVs) is of great importance to the oceanographic research community because automated data collection is becoming more prevalent. Intelligent planning is required to maneuver a vehicle to high-valued locations to perform data collection. In this paper, we present algorithms that determine paths for AUVs to track evolving features of interest in the ocean by considering the output of predictive ocean models. While traversing the computed path, the vehicle provides near-real-time, in situ measurements back to the model, with the intent to increase the skill of future predictions in the local region. The results presented here extend prelim- inary developments of the path planning portion of an end-to-end autonomous prediction and tasking system for aquatic, mobile sensor networks. This extension is the incorporation of multiple vehicles to track the centroid and the boundary of the extent of a feature of interest. Similar algorithms to those presented here are under development to consider additional locations for multiple types of features. The primary focus here is on algorithm development utilizing model predictions to assist in solving the motion planning problem of steering an AUV to high-valued locations, with respect to the data desired. We discuss the design technique to generate the paths, present simulation results and provide experimental data from field deployments for tracking dynamic features by use of an AUV in the Southern California coastal ocean.
Resumo:
The INEX 2010 Focused Relevance Feedback track offered a refined approach to the evaluation of Focused Relevance Feedback algorithms through simulated exhaustive user feedback. As in traditional approaches we simulated a user-in-the loop by re-using the assessments of ad-hoc retrieval obtained from real users who assess focused ad-hoc retrieval submissions. The evaluation was extended in several ways: the use of exhaustive relevance feedback over entire runs; the evaluation of focused retrieval where both the retrieval results and the feedback are focused; the evaluation was performed over a closed set of documents and complete focused assessments; the evaluation was performed over executable implementations of relevance feedback algorithms; and �finally, the entire evaluation platform is reusable. We present the evaluation methodology, its implementation, and experimental results obtained for nine submissions from three participating organisations.
Resumo:
The XML Document Mining track was launched for exploring two main ideas: (1) identifying key problems and new challenges of the emerging field of mining semi-structured documents, and (2) studying and assessing the potential of Machine Learning (ML) techniques for dealing with generic ML tasks in the structured domain, i.e., classification and clustering of semi-structured documents. This track has run for six editions during INEX 2005, 2006, 2007, 2008, 2009 and 2010. The first five editions have been summarized in previous editions and we focus here on the 2010 edition. INEX 2010 included two tasks in the XML Mining track: (1) unsupervised clustering task and (2) semi-supervised classification task where documents are organized in a graph. The clustering task requires the participants to group the documents into clusters without any knowledge of category labels using an unsupervised learning algorithm. On the other hand, the classification task requires the participants to label the documents in the dataset into known categories using a supervised learning algorithm and a training set. This report gives the details of clustering and classification tasks.
Resumo:
Railway timetabling is an important process in train service provision as it matches the transportation demand with the infrastructure capacity while customer satisfaction is also considered. It is a multi-objective optimisation problem, in which a feasible solution, rather than the optimal one, is usually taken in practice because of the time constraint. The quality of services may suffer as a result. In a railway open market, timetabling usually involves rounds of negotiations among a number of self-interested and independent stakeholders and hence additional objectives and constraints are imposed on the timetabling problem. While the requirements of all stakeholders are taken into consideration simultaneously, the computation demand is inevitably immense. Intelligent solution-searching techniques provide a possible solution. This paper attempts to employ a particle swarm optimisation (PSO) approach to devise a railway timetable in an open market. The suitability and performance of PSO are studied on a multi-agent-based railway open-market negotiation simulation platform.
Resumo:
Railway level crossings are amongst the most complex of road safety control systems, due to the conflicts between road vehicles and rail infrastructure, trains and train operations. Driver behaviour at railway crossings is the major collision factor. The main objective of the present paper was to evaluate the existing conventional warning devices in relation to driver behaviour. The common conventional warning devices in Australia are a stop sign (passive), flashing lights and a half boom-barrier with flashing lights (active). The data were collected using two approaches, namely: field video recordings at selected sites and a driving simulator in a laboratory. This paper describes and compares the driver response results from both the field survey and the driving simulator. The conclusion drawn is that different types of warning systems resulted in varying driver responses at crossings. The results showed that on average driver responses to passive crossings were poor when compared to active ones. The field results were consistent with the simulator results for the existing conventional warning devices and hence they may be used to calibrate the simulator for further evaluation of alternative warning systems.
Resumo:
The Wikipedia has become the most popular online source of encyclopedic information. The English Wikipedia collection, as well as some other languages collections, is extensively linked. However, as a multilingual collection the Wikipedia is only very weakly linked. There are few cross-language links or cross-dialect links (see, for example, Chinese dialects). In order to link the multilingual-Wikipedia as a single collection, automated cross language link discovery systems are needed – systems that identify anchor-texts in one language and targets in another. The evaluation of Link Discovery approaches within the English version of the Wikipedia has been examined in the INEX Link the-Wiki track since 2007, whilst both CLEF and NTCIR emphasized the investigation and the evaluation of cross-language information retrieval. In this position paper we propose a new virtual evaluation track: Cross Language Link Discovery (CLLD). The track will initially examine cross language linking of Wikipedia articles. This virtual track will not be tied to any one forum; instead we hope it can be connected to each of (at least): CLEF, NTCIR, and INEX as it will cover ground currently studied by each. The aim is to establish a virtual evaluation environment supporting continuous assessment and evaluation, and a forum for the exchange of research ideas. It will be free from the difficulties of scheduling and synchronizing groups of collaborating researchers and alleviate the necessity to travel across the globe in order to share knowledge. We aim to electronically publish peer-reviewed publications arising from CLLD in a similar fashion: online, with open access, and without fixed submission deadlines.
Resumo:
This paper discusses the challenges of making a case for the adoption of low cost railway level crossings in Australia. Several issues are discussed in this paper including legal issues associated with the treatment of low-exposure passive crossings with low cost level crossing warning devices (LCLCWDs); principles of operation and deployment for LCLCWDs; and technical and human factors aspects of safety and availability. The Cooperative Research Centre (CRC) for Rail Innovation’s affordable level crossings project aims to address a number of these technical and human factors issues through research and field trials.