962 resultados para Projects decisions
Resumo:
Currently in Australia, there are no decision support tools for traffic and transport engineers to assess the crash risk potential of proposed road projects at design level. A selection of equivalent tools already exists for traffic performance assessment, e.g. aaSIDRA or VISSIM. The Urban Crash Risk Assessment Tool (UCRAT) was developed for VicRoads by ARRB Group to promote methodical identification of future crash risks arising from proposed road infrastructure, where safety cannot be evaluated based on past crash history. The tool will assist practitioners with key design decisions to arrive at the safest and the most cost -optimal design options. This paper details the development and application of UCRAT software. This professional tool may be used to calculate an expected mean number of casualty crashes for an intersection, a road link or defined road network consisting of a number of such elements. The mean number of crashes provides a measure of risk associated with the proposed functional design and allows evaluation of alternative options. The tool is based on historical data for existing road infrastructure in metropolitan Melbourne and takes into account the influence of key design features, traffic volumes, road function and the speed environment. Crash prediction modelling and risk assessment approaches were combined to develop its unique algorithms. The tool has application in such projects as road access proposals associated with land use developments, public transport integration projects and new road corridor upgrade proposals.
Resumo:
Purpose: The goal of this conceptual paper is to provide tools to help maximise the value delivered by infrastructure projects, by developing methods to increase adoption of innovative products during construction. Methods: The role of knowledge flows in determining innovation adoption rates is conceptually examined. A promising new approach is developed. Open innovation system theory is extended, by reviewing the role of three frameworks: (1) knowledge intermediaries, (2) absorptive capacity and (3) governance arrangements. Originality: We develop a novel open innovation system model to guide further research in the area of adoption of innovation on infrastructure projects. The open innovation system model currently lacks definition of core concepts, especially with regard to the impact of different degrees and types of openness. The three frameworks address this issue and add substance to the open innovation system model, addressing widespread criticism that it is underdeveloped. The novelty of our model is in the combination of the three frameworks to explore the system. These frameworks promise new insights into system dynamics and facilitate the development of new methods to optimise the diffusion of innovation. Practical Implications: The framework will help to reveal gaps in knowledge flows that impede the uptake of innovations. In the past, identifying these gaps has been difficult given the lack of nuance in existing theory. The knowledge maps proposed will enable informed policy advice to effectively harness the power of knowledge networks, increase innovation diffusion and improve the performance of infrastructure projects. The models developed in this paper will be used in planned empirical research into innovation on large scale infrastructure projects in the Australian built environment.
Resumo:
As the problems involving infrastructure delivery have become more complex and contentious, there has been an acknowledgement that these problems cannot be resolved by any one body working alone. This understanding has driven multi-sectoral collaboration and has led to an expansion of the set of actors, including stakeholders, who are now involved in delivery of infrastructure projects and services. However, more needs to be understood about how to include stakeholders in these processes and ways of developing the requisite combination of stakeholders to achieve effective outcomes. This thesis draws on stakeholder theory and governance network theory to obtain insights into how three multi-level networks within the Roads Alliance in Queensland engage with stakeholders in the delivery of complex and sensitive infrastructure services and projects. New knowledge about stakeholders will be obtained by testing a model of Stakeholder Salience and Engagement which combines and extends the stakeholder identification and salience theory, ladder of stakeholder management and engagement and the model of stakeholder engagement and moral treatment of stakeholders. By applying this model, the broad research question: “Who or what decides how stakeholders are engaged by governance networks delivering public outcomes?” will be addressed. The case studies will test a theoretical model of stakeholder salience and engagement which links strategic decisions about stakeholder salience with the quality and quantity of engagement strategies for engaging different types of stakeholders. A multiple embedded case study design has been selected as the overall approach to explore, describe, explain and evaluate how stakeholder engagement occurs in three governance networks delivering road infrastructure in Queensland. The research design also incorporates a four stage approach to data collection: observations, stakeholder analysis, telephone survey questionnaire and semi-structured interviews. The outcomes of this research will contribute to and extend stakeholder theory by showing how stakeholder salience impacts on decisions about the types of engagement processes implemented. Governance network theory will be extended by showing how governance networks interact with stakeholders through the concepts of stakeholder salience and engagement. From a practical perspective this research will provide governance networks with an indication of how to optimise engagement with different types of stakeholders. 2
Resumo:
The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.
Resumo:
The collaboration of clinicians with basic science researchers is crucial for addressing clinically relevant research questions. In order to initiate such mutually beneficial relationships, we propose a model where early career clinicians spend a designated time embedded in established basic science research groups, in order to pursue a postgraduate qualification. During this time, clinicians become integral members of the research team, fostering long term relationships and opening up opportunities for continuing collaboration. However, for these collaborations to be successful there are pitfalls to be avoided. Limited time and funding can lead to attempts to answer clinical challenges with highly complex research projects characterised by a large number of "clinical" factors being introduced in the hope that the research outcomes will be more clinically relevant. As a result, the complexity of such studies and variability of its outcomes may lead to difficulties in drawing scientifically justified and clinically useful conclusions. Consequently, we stress that it is the basic science researcher and the clinician's obligation to be mindful of the limitations and challenges of such multi-factorial research projects. A systematic step-by-step approach to address clinical research questions with limited, but highly targeted and well defined research projects provides the solid foundation which may lead to the development of a longer term research program for addressing more challenging clinical problems. Ultimately, we believe that it is such models, encouraging the vital collaboration between clinicians and researchers for the work on targeted, well defined research projects, which will result in answers to the important clinical challenges of today.
Resumo:
Against a background of already thin markets in some sectors of major public sector infrastructure in Australia and the desire of Australian federal government to leverage private finance, concerns about ensuring sufficient levels of competition are prompting federal government to seek new sources of in-bound Foreign Direct Income. The aim of this paper is to justify and develop a means to deploying the eclectic paradigm of internationalisation that forms part of an Australian federally funded research project designed to explain the determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects. Despite the dominance of the eclectic paradigm as a theory of internationalisation for over two decades, it has seen limited application in terms of multinational construction. It is expected that the research project will be the first empirical study to deploy the eclectic paradigm to inbound FDI to Australia whilst using the dominant economic theories advocated for use within the eclectic paradigm. Furthermore, the research project is anticipated to yield a number of practical benefits. These include estimates of the potential scope to attract more multinational contractors to bid for Australian public sector infrastructure, including the nature and extent to which this scope can be influenced by Australian governments responsible for the delivery of infrastructure. On the other hand, the research is also expected to indicate the extent to which indigenous and other multinational contractors domiciled in Australia are investing in special purpose technology and achieving productivity gains relative to foreign multinational contractors.
Resumo:
In this globalized environment, Taiwanese firms have been very successful in achieving growth via international market expansion. In particular, the Taiwanese electronics industry has shown a dynamism lacking in comparable industries around the world. However, in recent years there has been a move by many of the larger Taiwanese manufacturing firms to outsource their manufacturing to low-cost producers such as China in order to remain competitive. Conversely, most Taiwanese small- to medium-sized enterprises (SMEs) have retained their production facilities in Taiwan. These SMEs seek to expand their sales beyond the domestic market by employing an export strategy, making a significant socioeconomic contribution to the domestic and regional economies. This paper highlights the key dimensions such as enhancing factors (benefits/advantages), inhibiting factors (barriers/costs), and managerial factors (characteristics/commitment) that play an important role in the internationalization of SMEs located within the Taiwanese electronics industry. A logistic regression model is used to predict the probability of a firm being an exporter.
Resumo:
In line with accepted decision making theory, individuals engage in rational decision making. Decisions made under conditions of bounded rationality may have serious adverse consequences. Employees making decisions on behalf of their employer are often faced with situations where perfect and complete information is not available, and time is limited. Under such conditions, we posit that employees will make decisions that are increasingly bounded. At its most extreme neither time nor information is available to make a decision and rational decision making, bounded or not, reaches its limits. Many authors suggest that this is the point at which improvisation takes place. Although opinion in the literature is mixed regarding the efficacy of improvised decisions, we argue that improvised decisions place the organisation at considerable risk and as a consequence are undesirable.
Resumo:
Even though security protocols are designed to make computer communication secure, it is widely known that there is potential for security breakdowns at the human machine interface. This paper reports on a diary study conducted in order to investigate what people identify as security decisions that they make while using the web. The study aimed to uncover how security is perceived in the individual's context of use. From this data, themes were drawn, with a focus on addressing security goals such as confidentiality and authentication. This study is the first study investigating users' web usage focusing on their self-documented perceptions of security and the security choices they made in their own environment.
Resumo:
The open source juggernaut seems to be gaining pace. The open source model certainly has appeal - cutting costs, while at the same time potentially increasing staff and system efficiencies. However, open source poses a number of significant legal challenges and risks for those that incorporate it. Clients need to look carefully before leaping.
Resumo:
It’s fast approaching the end of the year and the festive season, and I have a few things on my mind. First, how I’ll fit in all of my holiday plans and projects within my period of leave, which always seems to pass oh so quickly! But more important are the two issues of global financial uncertainty and safe travel. Judging by what is in the media, it appears to be proving difficult for any self respecting financial industry specialist to define and grapple with the so-called current economic crisis, let alone those of us who have not been formally and extensively schooled in the sciences of finance and economics. Perhaps the latter is even more of a “black art” than the discipline of transport planning. The situation has affected all of us with our superannuation and/or share portfolios; however, judging by the still-crowded shopping centres in many areas, the downstream general economic impacts appear to be less serious in Australia than in other developed countries, even with the significant market fluctuations taking place. There are many important decisions facing Australian governments, from the top down, on how they manage their budgets and spending. Infrastructure spending is in competition with other necessities such as the public health system and education. But it appears that infrastructure is an avenue of public spending that, over all time windows, may be able to significantly bolster local economies and that of the nation as a whole. This, however, is against the spectre of deficits. I would suggest that now, more than ever, we as transport and other professionals within the system, should use our knowledge and experience to take a key role in helping government and the private sector make sound decisions on infrastructure planning, delivery and management.
Resumo:
Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.
Resumo:
Evaluation, selection and finally decision making are all among important issues, which engineers face in long run of projects. Engineers implement mathematical and nonmathematical methods to make accurate and correct decisions, whenever needed. As extensive as these methods are, effects of any selected method on outputs achieved and decisions made are still suspicious. This is more controversial and challengeable, where evaluation is made among non-quantitative alternatives. In civil engineering and construction management problems, criteria include both quantitative and qualitative ones, such as aesthetic, construction duration, building and operation costs, and environmental considerations. As the result, decision making frequently takes place among non-quantitative alternatives. It should be noted that traditional comparison methods, including clear-cut and inflexible mathematics, have always been criticized. This paper demonstrates a brief review of traditional methods of evaluating alternatives. It also offers a new decision making method using, fuzzy calculations. The main focus of this research is some engineering issues, which have flexible nature and vague borders. Suggested method provides analyzability of evaluation for decision makers. It is also capable to overcome multi criteria and multi-referees problems. In order to ease calculations, a program named DeMA is introduced.
Resumo:
The affects associated with culture, the values inherent in cultures and the identification of cultural assumptions are popular topics in recent management and Information Systems (IS) research. The main focus in relevant IS research over the years, has been on the comparison of cultural artifacts in different cultural settings. Despite these studies we need to ask whether there is a general approach to how culture can be researched in a rigorous manner? What are the issues that arise in cross- cultural research that have a bearing on decisions about a suitable research approach? What are the most appropriate methodologies to be used in cross-cultural research? Which is more appropriate, a qualitative, a quantitative or a mixed- method research approach? This paper will discuss important considerations in the process of deciding on the best research approach for cross-cultural projects. A case study will be then be reported as an example revealing the merits of integrating qualitative and quantitative approaches followed by a thorough discussion on the issues which may arise during this process.
Resumo:
In Australia and other developed countries there is poor adherence to guidelines recommending the introduction of complementary feeding to infants at 6 months of age. We aimed to investigate, via adopting a theory of planned behaviour framework and incorporating additional normative and demographic influences, mothers’ complementary feeding intentions and behaviour. Participants were 375 primiparas who completed an initial questionnaire (infant age 13±3weeks) that assessed the theory of planned behaviour constructs of attitude, subjective norm, and perceived behavioural control, as well as group norm and additional maternal and infant variables of mothers’ age, education level, weight status perception, current maternal feeding practices, and infant birth weight. Approximately, 3 months after completion of the main questionnaire, mothers completed a follow-up questionnaire that assessed the age in months at which the infant was first introduced to solids. The theory of planned behaviour variables of attitude and subjective norm, along with group norm, predicted intentions, with intention, mothers’ age (older more likely), and weight status perception (overweight less likely) predicting behaviour. Overall, the results highlight the importance of attitudes, normative influences, and individual characteristics in complementary feeding decision-making which should be considered when designing interventions aimed at improving adherence to current maternal feeding guidelines.