959 resultados para Project monitoring


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Monitoring oil pollution by using students to count tarballs on beaches. Samples were taken between 2006 and 2010; a significant relationship was demonstrated between the abundance of tarballs and exposure to shipping lanes. The contribution of local communities to monitoring marine pollution was also demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A training course on seagrass conservation and monitoring was conducted at Mawlamyine University and Ngapali Beach government department and Non-Government Organizations (NGO) trainees.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study looked at improving knowledge base capacity and enhance capacity to address marine pollution and water quality monitoring issues in Myanmar. Significant capacity needs were identified and a follow up plan presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report was based on fieldwork conducted by trainees at the Socio-economic Monitoring (SocMon) workshop held at St Martin's Island. Topics included: community infrastructure; educational services; health services; water and sewerage; coastal and marine activities; material style of life; status of women; governance; and perceptions

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report was based on fieldwork conducted by trainees at the Socio-economic Monitoring (SocMon) workshop held at Vidathaltivu, Mannar Region. Topics included: community infrastructure; coastal and marine activities; and governance of marine and coastal areas

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Socio-economic Monitoring (SocMon) training workshop followed up from the capacity building workshop held in Mannar, 2015. It's aims were to validate information collected at the previous workshop, assist in filling in any gaps and develop a vision tree fro future actions. Planned outputs included: a detailed workplan; a workshop process report; and a final socioeconomic base line report for Vidathaltivu village.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trainers from the region contributed theory and practical training to trainees from government departments, universities and NGOs relevant to conservation of seagrasses and monitoring methods.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objectives of the workshop included: presentation of research to stakeholders; briefing of stakeholders on project objectives, contents and activities; to get stakeholder perceptions and suggestions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Surveys on seagrass taxonomy, distribution and extent were carried out in 14 locations within Myeik Archipelago and along the Rakhine Coast.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The results reported on were from a monitoring survey No. 10 undertaken between 23 rd and 29th April 2012 during construction period of the Bujagali Hydropower Project (BHPP). Two pre-construction, baseline surveys in April 2000 and April 2006 were conducted and so far, during construction phase of the project, nine monitoring surveys have been undertaken i.e. in September 2007, April 2008, April 2009, October 2009, April 2010, September 2010, April 2011, September 2011and the present one, in April 2012. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: water quality determinants biology and ecology of fishes and food webs fish stock and fish catch including economic aspects of catch and sanitation/vector studies (bilharzias and river blindness) During this survey, baseline assessment of the above mentioned studies was conducted in the reservoir behind the dam, including studies on algae, zooplankton and benthic macroinvertebrates which had been restrained since April 2008. The findings of baseline assessment of the reservoir are also contained in this report and are compared with those obtained from Transect 1(Upstream) and Transect 2 (Downstream).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The results reported on were from a monitoring survey No.7 undertaken between 4 th and 7th September 2010 during construction period of the Bujagali Hydropower Project (BHPP). Two pre-construction, baseline surveys in April 2000 and April 2006 were conducted and so far, during construction phase of the project, six monitoring surveys have been undertaken i.e. in September 2007, April 2008, April 2009, October 2009, April 2010 and the present one, in September 2010. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: I. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There are several reasons for monitoring of underground structures and they have already been discussed many times, e.g. from the view of ageing or state after accidental event like flooding of Prague metro in 2002. Monitoring of Prague metro is realized in the framework of international research project sponsored by ESF-S3T. The monitoring methods used in Prague are either classical one or new or developing one. The reason for different monitoring methods is the different precision of each method and also for cross-checking between them and their evaluation. Namely we use convergence, tiltmetres, crackmetres, geophysical methods, laser scanning, computer vision and finally installation of MEMS monitoring devices. In the paper more details of each method and obtained results will be presented. The monitoring methods are complemented by wireless data collection and transfer for real-time monitoring. © 2012 Taylor & Francis Group.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Advances in the development of computer vision, miniature Micro-Electro-Mechanical Systems (MEMS) and Wireless Sensor Network (WSN) offer intriguing possibilities that can radically alter the paradigms underlying existing methods of condition assessment and monitoring of ageing civil engineering infrastructure. This paper describes some of the outcomes of the European Science Foundation project "Micro-Measurement and Monitoring System for Ageing Underground Infrastructures (Underground M3)". The main aim of the project was to develop a system that uses a tiered approach to monitor the degree and rate of tunnel deterioration. The system comprises of (1) Tier 1: Micro-detection using advances in computer vision and (2) Tier 2: Micro-monitoring and communication using advances in MEMS and WSN. These potentially low-cost technologies will be able to reduce costs associated with end-of-life structures, which is essential to the viability of rehabilitation, repair and reuse. The paper describes the actual deployment and testing of these innovative monitoring tools in tunnels of London Underground, Prague Metro and Barcelona Metro. © 2012 Taylor & Francis Group.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes part of the monitoring undertaken at Abbey Mills shaft F, one of the main shafts of Thames Water's Lee tunnel project in London, UK. This shaft, with an external diameter of 30 m and 73 m deep, is one of the largest ever constructed in the UK and consequently penetrates layered and challenging ground conditions (Terrace Gravel, London Clay, Lambeth Group, Thanet Sand Formation, Chalk Formation). Three out of the twenty 1-2 m thick and 84 m deep diaphragm wall panels were equipped with fibre optic instrumentation. Bending and circumferential hoop strains were measured using Brillouin optical time-domain reflectometry and analysis technologies. These measurements showed that the overall radial movement of the wall was very small. Prior to excavation during a dewatering trial, the shaft may have experienced three-dimensional deformation due to differential water pressures. During excavation, the measured hoop and bending strains of the wall in the chalk exceeded the predictions. This appears to be related to the verticality tolerances of the diaphragm wall and lower circumferential hoop stiffness of the diaphragm walls at deep depths. The findings from this case study provide valuable information for future deep shafts in London. © ICE Publishing: All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Integrated Environmental Monitoring (IEM) project, part of the Asia-Pacific Environmental Innovation Strategy (APEIS) project, developed an integrated environmental monitoring system that can be used to detect, monitor, and assess environmental disasters, degradation, and their impacts in the Asia-Pacific region. The system primarily employs data from the moderate resolution imaging spectrometer (MODIS) sensor on the Earth Observation System- (EOS-) Terra/Aqua satellite,as well as those from ground observations at five sites in different ecological systems in China. From the preliminary data analysis on both annual and daily variations of water, heat and CO2 fluxes, we can confirm that this system basically has been working well. The results show that both latent flux and CO2 flux are much greater in the crop field than those in the grassland and the saline desert, whereas the sensible heat flux shows the opposite trend. Different data products from MODIS have very different correspondence, e.g. MODIS-derived land surface temperature has a close correlation with measured ones, but LAI and NPP are quite different from ground measurements, which suggests that the algorithms used to process MODIS data need to be revised by using the local dataset. We are now using the APEIS-FLUX data to develop an integrated model, which can simulate the regional water,heat, and carbon fluxes. Finally, we are expected to use this model to develop more precise high-order MODIS products in Asia-Pacific region.