944 resultados para Project managers
Resumo:
Processing information and forming opinions pose special challenges when attempting to effectively manage the new or complex tasks that typically arise in projects. Based on research in organizational and social psychology, we introduce mechanisms and strategies for collective information processing which are important for forming opinions and handling information in projects.
Resumo:
Investigation of the performance of engineering project organizations is critical for understanding and eliminating inefficiencies in today’s dynamic global markets. The existing theoretical frameworks consider project organizations as monolithic systems and attribute the performance of project organizations to the characteristics of the constituents. However, project organizations consist of complex interdependent networks of agents, information, and resources whose interactions give rise to emergent properties that affect the overall performance of project organizations. Yet, our understanding of the emergent properties in project organizations and their impact on project performance is rather limited. This limitation is one of the major barriers towards creation of integrated theories of performance assessment in project organizations. The objective of this paper is to investigate the emergent properties that affect the ability of project organization to cope with uncertainty. Based on the theories of complex systems, we propose and test a novel framework in which the likelihood of performance variations in project organizations could be investigated based on the environment of uncertainty (i.e., static complexity, dynamic complexity, and external source of disruption) as well as the emergent properties (i.e., absorptive capacity, adaptive capacity, and restorative capacity) of project organizations. The existence and significance of different dimensions of the environment of uncertainty and emergent properties in the proposed framework are tested based on the analysis of the information collected from interviews with senior project managers in the construction industry. The outcomes of this study provide a novel theoretical lens for proactive bottom-up investigation of performance in project organizations at the interface of emergent properties and uncertainty
Resumo:
Biodiversity citizen science projects are growing in number, size, and scope, and are gaining recognition as valuable data sources that build public engagement. Yet publication rates indicate that citizen science is still infrequently used as a primary tool for conservation research and the causes of this apparent disconnect have not been quantitatively evaluated. To uncover the barriers to the use of citizen science as a research tool, we surveyed professional biodiversity scientists (n = 423) and citizen science project managers (n = 125). We conducted three analyses using non-parametric recursive modeling (random forest), using questions that addressed: scientists' perceptions and preferences regarding citizen science, scientists' requirements for their own data, and the actual practices of citizen science projects. For all three analyses we identified the most important factors that influence the probability of publication using citizen science data. Four general barriers emerged: a narrow awareness among scientists of citizen science projects that match their needs; the fact that not all biodiversity science is well-suited for citizen science; inconsistency in data quality across citizen science projects; and bias among scientists for certain data sources (institutions and ages/education levels of data collectors). Notably, we find limited evidence to suggest a relationship between citizen science projects that satisfy scientists' biases and data quality or probability of publication. These results illuminate the need for greater visibility of citizen science practices with respect to the requirements of biodiversity science and show that addressing bias among scientists could improve application of citizen science in conservation.
Resumo:
Teknikutvecklingen går snabbt framåt, och idag finns det ett stort behov av att använda andra utvecklares kod för att hänga med i det höga tempot. De kallas samlat för ramverk eller bibliotek, och hjälper utvecklaren att på ett effektivare sätt ta sig från start till mål utan att behöva skriva all programmeringskod själv. Dessa tredjepartslösningar är nästintill alltid bundna till ett licensavtal, vars restriktioner och tillåtelser utvecklaren måste följa vid nyttjandet. I denna studie har vi undersökt hur medvetenheten ser ut kring de licenser som är bundna till dessa tredjepartslösningar. Då det framkom i vår förstudie att vårt fall hade en relativt låg medvetenhet har vi även valt att titta på hur medvetenheten kan ökas. För att genomföra detta har vi valt att intervjua utvecklare och projektledare på ett konsultföretag. Vi undersökte även vilka faktorer som är viktiga för att höja medvetenheten samt vilka konsekvenser som kunde uppkomma vid bristfällande licenshantering. Vi upptäckte att det var en bristfällig kunskap om tredjepartslicenser på det studerade företaget, och hur de följde de licensrestriktioner som fanns för respektive licens. För att höja medvetenheten föreslår vi hjälpmedel i form av en automatiserad centraliserad lösning, lathundar för en enklare överblick av licensavtalen och hur användning av redan färdiga programvaror kan hjälpa till att öka medvetenheten och hanteringen av licenser.
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
Purpose – The aim of this study is to investigate the role of key strategic factors in new service development (NSD). In particular, the role of service development strategy, a formalised development process, integrated development teams and customer co-creation were investigated and the results were compared with managers' beliefs. Design/methodology/approach – The study used a sample of more than 500 service development projects to test a NSD conceptual model. Regression analysis was used to test the relative importance of the key strategic factors, and the results were compared with managers' beliefs. Findings – The results show that managers believe that customer co-creation is most important in order to succeed with NSD. However, contrary to management belief, a service development strategy is the “missing link” in improving NSD performance. In addition, the research highlighted an interaction effect between integrated development teams and customer co-creation, which means that project managers should focus on individual competencies on the development team and how they interact with customers throughout the NSD process. Originality/value – For a long time, NSD has failed to receive the attention it deserves, not just in practice but also in service research. This study shows that the number of new services put on the market and then withdrawn because of low sales remains as high as 43 per cent. This paper contributes knowledge on how to reduce the number of failures in NSD by pointing out the key strategic factors that influence NSD performance.
Resumo:
The main aim of the workshop was to extend international dialogue and promote the development of VREs led by researcher needs. On the first day principal investigators and project managers of a great variety of projects provided an insight in the current state of development regarding technical innovation, disciplinary specific solutions, and impact on the research community. A series of short presentations of selected projects were followed by an extensive poster session that functioned as a "trade fair" of current trends in the field of VRE development and implementation. The second day was dedicated to the discussion of the "next steps" to improve and advance the development of VREs and to foster ideas for future engagement. The results of landscape studies funded by Jisc and the SURFfoundation were presented as Key Notes and impulse for the following discussions in four sub-groups. The sub-groups concentrated on the following four key themes: technological challenges organisation & concepts researcher needs strategic issues The outcomes of the separate discussions consisted of recommendations to the Knowledge Exchange initiative itself, for the Knowledge Exchange partner organisations and beyond.
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
10 p.
Resumo:
A group of four applications including Top 20 Pedestrian Crash Locations: This application is designed to display top 20 pedestrian crash locations into both map- view and detailed information view. FDOT Crash Reporting Tool: This application is designed to simplify the usage and sharing of CAR data. The application can load raw data from CAR and display it into a web map interface. FDOT Online Document Portal: This application is designed for FDOT project managers to be able to share and manage documents through a user friendly, GIS enable web interface GIS Data Collection for Pedestrian Safety Tool: FIU-GIS Center was responsible for data collection and processing work for the project of Pedestrian Safety Tool Project. The outcome of this task is present by a simple web-GIS application design to host GIS by projects.
Resumo:
Short time-to-market is a key success factor in the todays’ dynamic business environment and many companies are trying to improve their product development processes. A challenge is to develop products according to the time plan and at the same time keeping the cost low and the quality high. This study focuses on the project management within the product development process in an automotive industry. The background of this study started as a request from the research and development department at the automotive company, which led to the following questions; 1) what are the most crucial factors for project success? 2) How can these factors contribute to a more successful outcome? 3) How can project management decrease product development lead time by sharing knowledge? The research approach is a case study and the data collection consist of interviews and questioners at two companies connected to project management in product development projects. Spider charts are created from the collected data containing eleven dimensions to show similarities and differences between the project managers working within the research and development department as well as between the two companies. The main conclusions are that there is a need to allow a certain level of flexibility when managing projects, in order to more easily handle late changes. Being involved in a project from the concept phase could facilitate the product development activities later on, due to a deeper understanding regarding previous decisions. Further, knowledge sharing methods, such as databases, has to be designed to be suitable for a specific organization and user friendly which enables the users to more easily search for specific types of knowledge. Lastly, a low level on the detailed focus is shown to be another success factor, however, in some cases there is still a need of this detailed focus to solve specific problems but the details may never become a higher focus than the holistic view.
Resumo:
Teknikutvecklingen går snabbt framåt, och idag finns det ett stort behov av att använda andra utvecklares kod för att hänga med i det höga tempot. De kallas samlat för ramverk eller bibliotek, och hjälper utvecklaren att på ett effektivare sätt ta sig från start till mål utan att behöva skriva all programmeringskod själv. Dessa tredjepartslösningar är nästintill alltid bundna till ett licensavtal, vars restriktioner och tillåtelser utvecklaren måste följa vid nyttjandet. I denna studie har vi undersökt hur medvetenheten ser ut kring de licenser som är bundna till dessa tredjepartslösningar. Då det framkom i vår förstudie att vårt fall hade en relativt låg medvetenhet har vi även valt att titta på hur medvetenheten kan ökas. För att genomföra detta har vi valt att intervjua utvecklare och projektledare på ett konsultföretag. Vi undersökte även vilka faktorer som är viktiga för att höja medvetenheten samt vilka konsekvenser som kunde uppkomma vid bristfällande licenshantering. Vi upptäckte att det var en bristfällig kunskap om tredjepartslicenser på det studerade företaget, och hur de följde de licensrestriktioner som fanns för respektive licens. För att höja medvetenheten föreslår vi hjälpmedel i form av en automatiserad centraliserad lösning, lathundar för en enklare överblick av licensavtalen och hur användning av redan färdiga programvaror kan hjälpa till att öka medvetenheten och hanteringen av licenser.
Resumo:
Purpose – The construction industry in Australia is characterised by a long work-hours culture, with conditions that make it difficult for staff to balance their work and non-work lives. The objective of this paper is to measure the success of a work-place intervention designed to improve work-life balance (WLB) in an alliance project in the construction industry, and the role the project manager plays in this success. Design/methodology/approach – The paper focuses on an alliance case study. Interviews were conducted at two points in time, several months apart, after the interventions were implemented. Findings – Results showed that staff on the whole were more satisfied with their work experience after the interventions, and indicated the important role that managers' attitudes and behaviours played. Originality/value – Managerial support for work-life initiatives is a critical element in achieving WLB and satisfaction with working arrangements. The fact that the manager “talked the talk and walked the walk” was a major contributing success factor, which has not previously been demonstrated.
Resumo:
In repetitive operations the productivity dilemma has been widely studied, but there is a lack of research in non-repetitive operations, such as in project-based firms. This paper investigates why project-based firms foster or hinder project flexibility through an embedded multi-case study with six projects within a large German project-based firm. The results suggest that although such firms have projects as their key source of revenue, their focus lies in longevity and survival and this logic is, in some instances, at odds with the temporary nature of the project context.