983 resultados para President Barbara
Resumo:
Report sent to the President and Director of the Port Dalhousie and Thorold Railway stating that the location of the line extension of the railway is completed. The distance from Thorold Station to Port Colborne is 20 miles. The estimate provides for construction of a permanent structure across the Chippewa and Welland River. Estimates for building a first class road, culverts and bridges will be of permanent and durable masonry. This includes estimates for various station buildings such as a warehouse in Port Colborne and a warehouse in Port Dalhousie. Surveys and plans are ready and will be registered this week. This is signed by S.D. Woodruff (2 copies) [one appears to be a rough copy] (The rough copy is 5 pages, handwritten and the other copy is 6 pages, handwritten), Apr. 8, 1857.
Resumo:
Letter from S.D. Woodruff to the president and directors of the Port Robinson and Thorold Macadamized Road Committee regarding extra work done (3 pages, handwritten), Aug. 6, 1857.
Resumo:
Letter to S.D. Woodruff from E. Harris, president of the Long Point Company in which he suggests that the principal provisions of the bill regarding shares in the Long Point Company be brought before the Ontario House (2 pages, handwritten), Jan. 15, 1887
Resumo:
Discharge of Mortgage signed by Henry Kalar, President of the Niagara Permanent Building Society stating that John McNeilly [?] has satisfied all money due and the mortgage is therefore discharged. The right hand side of this document is burned. Text is slightly affected, Aug. 8, 1853.
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
This presentation was the product of an invitation to speak at a symposium for students and faculty from a variety of different non-law departments at the University of Tennessee, where in 1973 I had started what became a six-year legal campaign to divert the Tennessee Valley Authority from impounding the last flowing 33 miles of the Little Tennessee River behind TVA’s Tellico Dam.